Integral anchorage device of anchor rod drawing instrument
By designing an integral anchor, the synchronous up and down movement of the clips is achieved using the connecting rod and lifting ring, the problems of existing anchor installation difficulties and disassembly safety hazards are solved, and the efficiency and safety of planting rib pulling detection are improved.
Patent Information
- Application Number
- CN202420444738.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The existing anchor puller anchors are divided into two parts: clips and anchor sleeves. They are difficult to install and disassemble, and are prone to collapse and lose, which affects the detection efficiency of planting tendon pulling.
An integral anchor is designed, including a clip, an anchor sleeve, a baffle, a lifting ring and a connecting rod. The clip moves up and down the inside of the anchor sleeve through the connecting rod, and uses the lifting ring to simultaneously lift and drop the clamping steel bars. The overall clamping is formed to avoid the difficulty of separate installation of traditional anchors and the safety hazards of disassembly.
The installation efficiency of anchors in the anchor puller is improved, the clips are avoided and the loss is lost, and the safety and efficiency of detection is ensured.
Smart Images

Figure CN222105223U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an integral anchor of an anchor rod pulling instrument. Background Art
[0002] When the construction project enters the secondary structure stage, we need to carry out a large amount of rebar planting when building partition walls and pouring structural columns, door lintels, window sills and other secondary structures, and connect the secondary structure with the poured primary structure with steel bars. On the one hand, it avoids a large amount of reserved steel bars during the construction of the primary structure, and on the other hand, it can ensure the integrity of the building structure.
[0003] After the rebar planting process is completed, in order to ensure the effectiveness of the rebar planting, our test personnel often use the anchor puller to test the on-site rebar planting. When the secondary structure is started on a large scale, a large number of rebar pulling tests need to be done. However, the clip and the anchor sleeve in the existing anchor puller are divided into two parts, and the number of clips is generally three. When using the anchor of the anchor puller, we need to put the anchor sleeve on the steel bar first, and then clamp the three clips between the steel bar and the anchor sleeve. To ensure safety, the three clips need to be on the same horizontal plane. When installing the traditional separate anchor, it is difficult to adjust the position of the clip to the same horizontal plane, and the clip is easy to pinch the hand, so it is necessary to wear gloves to operate, and the clip of the anchor is also easy to collapse and fly when disassembled, which is not only unsafe but also easy to lose, which seriously affects the efficiency of the rebar pulling test. Utility Model Content
[0004] The utility model aims to address the deficiencies in the prior art and provides an integrated anchor of an anchor puller, comprising a clip, an anchor sleeve, a baffle, a lifting ring and a connecting rod, wherein the clip is clamped in the interior of the anchor sleeve by the connecting rod, one end of the connecting rod is fixedly connected to the clip, and the other end is arranged on the outside of the anchor sleeve and can drive the clip to move up and down in the anchor sleeve, and a lifting ring is provided on the outside of the anchor sleeve, and the lifting ring can lift the clip and then put the anchor on the steel bar to be pulled, and then release the lifting ring so that the clip falls down and clamps the steel bar at the same time, and the anchor sleeve is pushed into the anchor sleeve by the anchor puller so that the clip clamps the steel bar.
[0005] Preferably, there are three clips, each of which is provided with a thread on the inner side and a smooth surface on the outer side. The three clips are combined together to form a truncated cone-shaped integral clip, each clip occupies 1 / 3 of the cone, and a connecting rod is welded on each clip. The connecting rod passes through the anchor sleeve to drive the clip to move up and down. When the anchor sleeve moves downward, the steel bar is loosened. When the anchor sleeve is pushed in and moves upward, the clip can bite the steel bar through the inner thread.
[0006] Preferably, the anchor sleeve includes a truncated cone-shaped hole opened inside the cylinder, three rectangular holes are opened in the middle of the side wall of the anchor sleeve, the height of the anchor sleeve is the long side of the rectangular hole, the rectangular hole passes through the inside and outside of the anchor sleeve, the length of the rectangular hole accounts for 2 / 3 of the height of the anchor sleeve, the clip is placed inside the anchor sleeve, and the connecting rod passes through the rectangular hole and is welded to the clip.
[0007] Preferably, there is a baffle below each rectangular hole on the outer side of the anchor sleeve, and there is a lifting ring between the upper part of the baffle and the connecting rod, and the lifting ring is clamped between the baffle and the connecting rod.
[0008] Compared with the prior art, the beneficial effects of the utility model are as follows: the utility model forms an integral anchor through the clip, anchor sleeve, baffle, lifting ring and connecting rod, which is not a traditional anchor with separate clip and anchor sleeve. When we perform the rebar pulling test, we use the lifting ring to lift the three clips synchronously and then put the anchor on the rebar. Then we loosen the lifting ring to let the three clips fall to the same horizontal plane at the same time, and then we can push the anchor sleeve into the pulling test. Through this integral anchor setting, the efficiency of anchor installation in the anchor puller is greatly improved, avoiding the safety hazard of the clip flying off and the loss of the clip when the anchor is disassembled. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0010] Figure 1 It is a structural schematic diagram of the utility model.
[0011] Figure 2 It is a top view schematic diagram of the utility model.
[0012] In the figure: 1-clip, 2-anchor sleeve, 3-blocking plate, 4-lifting ring, 5-connecting rod, 6-rectangular hole. DETAILED DESCRIPTION
[0013] The technical solution of the utility model is described in detail below with reference to the accompanying drawings, but the protection scope of the utility model is not limited to the embodiments.
[0014] Reference Figure 1 and Figure 2The utility model discloses an integral anchor of an anchor rod puller, comprising a clip 1, an anchor sleeve 2, a baffle 3, a lifting ring 4 and a connecting rod 5. The clip 1 is clamped in the anchor sleeve 2 through the connecting rod 5. The connecting rod 5 is outside the anchor sleeve 2 and can drive the clip 1 to move up and down in the anchor sleeve 2. A lifting ring 4 is provided outside the anchor sleeve 2. The lifting ring 4 can lift the clip 1 and then put the anchor on the steel bar to be pulled. The lifting ring 4 is released to make the clip 1 fall down and clamp the steel bar at the same time. The anchor sleeve 2 is pushed forward by the anchor rod puller to make the clip 1 clamp the steel bar, and the steel bar pulling test is carried out.
[0015] The number of the clips 1 in the utility model is three, the inner side of each clip 1 is provided with a thread, and the outer side is a smooth surface. The three clips 1 are combined together to form a truncated cone shape, each clip 1 occupies 1 / 3 of the truncated cone, and a connecting rod 5 is welded on each clip 1. The connecting rod 5 can drive the clip 1 to move up and down through the opening on the anchor sleeve 2. When the anchor sleeve 2 moves downward to loosen the steel bar, when the anchor sleeve 2 is pushed in and moves upward, the clip 1 can bite the steel bar through the inner thread.
[0016] In addition, the shape of the anchor sleeve 2 is a cylinder with a truncated cone-shaped hole inside, and three rectangular holes 6 are opened in the middle of the side wall of the anchor sleeve 2. The height of the anchor sleeve 2 is the long side of the rectangular hole 6. The rectangular hole 6 runs through the inside and outside of the anchor sleeve 2. The length of the rectangular hole 6 accounts for 2 / 3 of the height of the anchor sleeve 2. The clip 1 is placed inside the anchor sleeve 2, and the connecting rod 5 passes through the rectangular hole 6 and is welded to the clip 1.
[0017] Finally, there is a baffle 3 below each rectangular hole 6 on the outside of the anchor sleeve 2, and there is a lifting ring 4 between the upper part of the baffle 3 and the connecting rod 5. The lifting ring 4 is stuck between the baffle 3 and the connecting rod 5, which can make the clip 1 rise and fall synchronously through the connecting rod 5, and can also prevent the lifting ring 4 from falling off.
[0018] The above-mentioned clip 1, anchor sleeve 2, baffle 3, lifting ring 4, and connecting rod 5 together form an integral anchor, which is not a traditional anchor with separate clip 1 and anchor sleeve 2. When we perform rebar pulling test, we first put the jacking device of the anchor rod instrument on the rebar, and then use the lifting ring 4 to synchronously lift the three clips 1 on the anchor, then put the integral anchor on the rebar, and then release the lifting ring 4 to let the three clips 1 fall to the same horizontal plane at the same time, and finally push the anchor sleeve 2 to make the clip 11 bite the rebar for pulling test. Through this integral anchor setting, the efficiency of anchor installation in the anchor rod pulling instrument is greatly improved, and the safety hazard of the clip 1 possibly breaking and flying when the anchor is disassembled and the situation of the clip 1 being lost are avoided.
[0019] As above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be interpreted as limiting the present invention itself. Various changes can be made to it in form and detail without departing from the spirit and scope of the present invention defined in the attached claims.
Claims
1. An integral anchor for an anchor puller, characterized in that: It includes a clip, an anchor sleeve, a baffle, a lifting ring, and a connecting rod. The clip is clamped in the anchor sleeve through the connecting rod. One end of the connecting rod is fixedly connected to the clip, and the other end is arranged outside the anchor sleeve and can drive the clip to move up and down inside the anchor sleeve. There is a lifting ring outside the anchor sleeve. The lifting ring can lift the clip and then put the anchor on the steel bar to be pulled. The lifting ring is released to make the clip fall down and clamp the steel bar at the same time. The anchor sleeve is pushed forward by the anchor rod pulling instrument to make the clip clamp the steel bar.
2. The integrated anchor of the anchor puller according to claim 1, characterized in that: There are three clips, each of which is provided with a thread on the inner side and a smooth surface on the outer side. The three clips are combined together to form a truncated cone-shaped integral clip, each clip occupies 1 / 3 of the truncated cone, and a connecting rod is welded on each clip. The connecting rod passes through the anchor sleeve to drive the clip to move up and down. When the anchor sleeve moves downward, the steel bar is loosened. When the anchor sleeve is pushed in and moves upward, the clip can bite the steel bar through the inner thread.
3. The integrated anchor of the anchor puller according to claim 2, characterized in that: The anchor sleeve includes a truncated cone-shaped hole opened inside a cylindrical body, three rectangular holes are opened in the middle of the side wall of the anchor sleeve, the height of the anchor sleeve is the long side of the rectangular hole, the rectangular hole runs through the inside and outside of the anchor sleeve, the length of the rectangular hole accounts for 2 / 3 of the height of the anchor sleeve, the clip is placed inside the anchor sleeve, and the connecting rod passes through the rectangular hole and is welded to the clip.
4. The integrated anchor of the anchor puller according to claim 3, characterized in that: A baffle is provided below each rectangular hole on the outer side of the anchor sleeve, a lifting ring is provided between the upper part of the baffle and the linkage rod, and the lifting ring is clamped between the baffle and the linkage rod.
