Nitrogen regeneration system for waste heat drying machine
By using a nitrogen regeneration system in the waste heat dryer and using nitrogen to replace the compressor's own gas volume, the gas consumption problem in the regeneration cold blowing stage is solved, and energy consumption is reduced and equipment efficiency is improved.
Patent Information
- Application Number
- CN202420049997.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-09
AI Technical Summary
The waste heat dryer consumes a large amount of gas output from the compressor itself during the regeneration and cold blowing stage, resulting in gas waste and energy consumption.
Using a nitrogen regeneration system, through fifteen pneumatic switching valves, manual valves, electric heaters, coolers and two adsorption towers, nitrogen is used instead to consume its own gas volume, achieving gas regeneration and energy consumption reduction.
It effectively avoids gas consumption during the regeneration cold blowing stage, reduces energy consumption, and improves the operating efficiency of the equipment.
Smart Images

Figure CN222111861U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a nitrogen regeneration system for a waste heat dryer, belonging to the technical field of regeneration systems for waste heat dryers. Background Art
[0002] Waste heat dryer is a common adsorption dryer that uses the heat from the exhaust of the air compressor to directly heat the regenerated desiccant, so that the adsorbent is completely regenerated. The waste heat dryer needs to be switched every two hours during operation. The regeneration cold blowing stage will consume about 1000m³ / h of the compressor's own air output, and the cold blowing time is about 115 minutes. The equivalent waste of gas in a day (24 hours) is about 12,000m³. Therefore, in order to avoid wasting compressor gas, a waste heat dryer using nitrogen regeneration system has been developed. Utility Model Content
[0003] The utility model aims to provide a waste heat dryer using a nitrogen regeneration system, which avoids gas consumption in the regeneration cold blowing stage and reduces energy consumption.
[0004] The technical solution of the utility model is:
[0005] A waste heat dryer uses a nitrogen regeneration system, comprising fifteen pneumatic switching valves, a manual valve V16, an electric heater, a cooler and two adsorption towers, the two adsorption towers are divided into Tower A and Tower B, and the fifteen pneumatic switching valves are hereinafter referred to as V1-V15;
[0006] Lead out a pipeline from the bottom of tower A and connect V1, V5, and V9 in parallel, and lead out a pipeline from the bottom of tower B and connect V3, V7, and V11 in parallel;
[0007] Lead out a pipeline from the top of Tower A and connect V6, V14, V10, and V2 in parallel, and lead out a pipeline from the top of Tower B and connect V8, V15, V12, and V4 in parallel;
[0008] V2 and V4, V10 and V12, V14 and V15, V6 and V8, V1 and V3, V5 and V7, V9 and V11 are connected in series through pipelines;
[0009] Connect the manual valve V16 between the connecting pipes of V2 and V4 and the connecting pipes of V10 and V12, and reserve the outlet flange;
[0010] An external nitrogen flange is reserved on the connecting pipes between V14 and V15;
[0011] Connect V13 between the connecting pipes of V6 and V8 and the connecting pipes of V5 and V7, connect electric heaters to the connecting pipe sections of V13 and V6 and V8, and reserve a flange at the inlet of the electric heater to connect with the outlet of the air compressor;
[0012] One end of the cooler is connected between V13 and the connecting pipes of V5 and V7, and the other end of the cooler is connected to the connecting pipe of V1 and V3.
[0013] Furthermore, a muffler is provided on the connecting pipe between V9 and V11.
[0014] Furthermore, the external nitrogen flange reserved on the V14 and V15 connecting pipelines is connected to the nitrogen pipeline network.
[0015] Furthermore, the reserved outlet flange is connected to the user pipeline network.
[0016] The beneficial effect of the utility model is that nitrogen is used to replace the consumed gas volume, thereby avoiding the gas consumption in the regeneration cold blowing stage and reducing energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the utility model;
[0018] Figure 2 This is a schematic diagram of the heating of tower A and adsorption of tower B in the utility model;
[0019] Figure 3 This is a schematic diagram of cold blowing in tower A and adsorption in tower B of the utility model;
[0020] Figure 4 This is a schematic diagram of the pressurization of tower A and adsorption of tower B in the utility model;
[0021] Figure 5 This is a schematic diagram of simultaneous adsorption of tower A and tower B of the utility model;
[0022] Figure 6 This is a schematic diagram of cold blowing of tower A and pressure relief of tower B of the utility model;
[0023] In the figure: A is tower A; B is tower B; C is electric heater; D is cooler; E is silencer; V1-V15 are fifteen pneumatic switching valves; V16 is a manual valve; arrow P is nitrogen inlet; DETAILED DESCRIPTION
[0024] The utility model is further described below in conjunction with the accompanying drawings.
[0025] Refer to the attached Figure 1 , a waste heat dryer using a nitrogen regeneration system, comprising fifteen pneumatic switching valves, a manual valve V16, an electric heater, a cooler and two adsorption towers, the two adsorption towers are divided into Tower A and Tower B, and the fifteen pneumatic switching valves are hereinafter referred to as V1-V15;
[0026] Lead out a pipeline from the bottom of tower A and connect V1, V5, and V9 in parallel, and lead out a pipeline from the bottom of tower B and connect V3, V7, and V11 in parallel;
[0027] Lead out a pipeline from the top of Tower A and connect V6, V14, V10, and V2 in parallel, and lead out a pipeline from the top of Tower B and connect V8, V15, V12, and V4 in parallel;
[0028] V2 and V4, V10 and V12, V14 and V15, V6 and V8, V1 and V3, V5 and V7, V9 and V11 are connected in series through pipelines;
[0029] Connect the manual valve V16 between the connecting pipes of V2 and V4 and the connecting pipes of V10 and V12, and reserve the outlet flange;
[0030] An external nitrogen flange is reserved on the connecting pipes between V14 and V15;
[0031] Connect V13 between the connecting pipes of V6 and V8 and the connecting pipes of V5 and V7, connect electric heaters to the connecting pipe sections of V13 and V6 and V8, and reserve a flange at the inlet of the electric heater to connect with the outlet of the air compressor;
[0032] One end of the cooler is connected between V13 and the connecting pipes of V5 and V7, and the other end of the cooler is connected to the connecting pipe of V1 and V3.
[0033] The V1-V15 specifically refer to: V1 is the working inlet valve of Tower A; V2 is the outlet valve of Tower A; V3 is the working inlet valve of Tower B; V4 is the outlet valve of Tower B; V5 is the heating outlet valve of Tower A; V6 is the heating inlet valve of Tower A; V7 is the heating outlet valve of Tower B; V8 is the heating inlet valve of Tower B; V9 is the regeneration vent valve of Tower A; V10 is the pressure charging valve of Tower A; V11 is the regeneration vent valve of Tower B; V12 is the pressure charging valve of Tower B; V13 is the working regeneration switching valve of Tower AB; V14 is the cold blowing inlet valve of Tower A; V15 is the cold blowing inlet valve of Tower B. The above 15 valves are all pneumatic switching valves.
[0034] In this embodiment, the inlet of the device is connected to the air compressor outlet pipeline by a flange, the outlet of the device is connected to the user pipeline network by a flange, and the nitrogen inlet is connected to the nitrogen pipeline network in the factory.
[0035] All valves in the device are connected by bolts, and the valve flanges are welded to the pipeline.
[0036] During the regeneration cold blowing stage of the dryer, a part of the gas volume is introduced from the outlet through the manual valve V16 for regeneration. By switching V14 and V15, the dryer is automatically switched on and off in a timely manner according to the pre-written program during the cold blowing stage, and the excess nitrogen in the factory is used as the regeneration gas source, avoiding gas consumption and reducing energy consumption.
[0037] 1. Tower A for heating and Tower B for adsorption
[0038] Refer to the attached Figure 2 The temperature of the moist compressed air discharged from the centrifuge is about 110°C. The gas enters the electric heater through the compressor outlet pipe (the electric heater automatically starts and stops according to the heating setting temperature), enters Tower A through V6, and heats and regenerates the adsorbent that has absorbed moisture. The saturated high-temperature moisture enters cooler D through V1, enters Tower B through V3 for adsorption, and is sent to the user network through V4. Tower A is heated during this process.
[0039] 2. Tower A for cold blowing and Tower B for adsorption
[0040] Refer to the attached Figure 3 The temperature of the moist compressed air discharged from the centrifuge is about 110°C. The gas enters the electric heater C through the compressor outlet pipe (the electric heater is not started at this time), enters the cooler D through V13, enters the B tower for adsorption through V3, and is sent to the user pipeline through V4.
[0041] At this time, valve V14 is opened, and external nitrogen enters tower A through this valve, passes through valve V9, and then is vented through silencer E. During this process, tower A is cold-blown.
[0042] 3. Tower A is pressurized and Tower B is adsorbed
[0043] Refer to the attached Figure 4 The temperature of the moist compressed air discharged from the centrifuge is about 110°C. The gas enters the electric heater C through the compressor outlet pipe (the electric heater is not started at this time), enters the cooler D through V13, enters the B tower for adsorption through V3, and is sent to the user pipeline through V4.
[0044] When the equipment is operating normally, the manual valve V16 is adjusted to a certain opening, at which time the V14 valve is closed and the V10 valve is opened, the external nitrogen will no longer participate in the work, and the outlet air passes through the manual valve V16 and the V10 valve into the A tower. In this process, the A tower is pressurized.
[0045] 4. Tower A and Tower B pressure balance (simultaneous adsorption of two towers)
[0046] Refer to the attached Figure 5 The temperature of the moist compressed air discharged from the centrifuge is about 110°C. The gas enters the electric heater C through the compressor outlet pipe (the electric heater is not started at this time), and enters the cooler D through V13. The gas is divided into two paths, one enters the A tower through V1 and is sent to the user pipeline through V2; the other enters the B tower through V3 and is sent to the user pipeline through V4.
[0047] 5. Tower A adsorbs and Tower B releases pressure
[0048] Refer to the attached Figure 6The temperature of the moist compressed air discharged from the centrifuge is about 110°C. The gas enters the electric heater C through the compressor outlet pipe (the electric heater is not started at this time), enters the cooler D through V13, enters the A tower through V1, and is sent to the user's pipeline network through V2; this process enters the silencer E through V11 for emptying and is depressurized through the B tower.
[0049] 6. Use Tower A and Tower B alternately
[0050] When the compressor is running, the automatic switching system of the dryer is put into operation, and the switching valves of the dryer will automatically switch according to the pre-written PLC program.
Claims
1. A waste heat dryer using a nitrogen regeneration system, characterized in that: It includes fifteen pneumatic switching valves, one manual valve V16, one electric heater, one cooler and two adsorption towers. The two adsorption towers are divided into Tower A and Tower B. The fifteen pneumatic switching valves are V1-V15 respectively; Lead out a pipeline from the bottom of tower A and connect V1, V5, and V9 in parallel, and lead out a pipeline from the bottom of tower B and connect V3, V7, and V11 in parallel; Lead out a pipeline from the top of Tower A and connect V6, V14, V10, and V2 in parallel, and lead out a pipeline from the top of Tower B and connect V8, V15, V12, and V4 in parallel; V2 and V4, V10 and V12, V14 and V15, V6 and V8, V1 and V3, V5 and V7, V9 and V11 are connected in series through pipelines; Connect the manual valve V16 between the connecting pipes of V2 and V4 and the connecting pipes of V10 and V12, and reserve the outlet flange; An external nitrogen flange is reserved on the connecting pipes between V14 and V15; Connect V13 between the connecting pipes of V6 and V8 and the connecting pipes of V5 and V7, connect electric heater C to the connecting pipe sections of V13 and V6 and V8, and reserve a flange at the inlet of electric heater C to connect with the outlet of the air compressor; One end of the cooler D is connected between V13 and the connecting pipes of V5 and V7, and the other end of the cooler D is connected to the connecting pipe of V1 and V3.
2. The waste heat dryer according to claim 1 uses a nitrogen regeneration system, characterized in that: A silencer E is provided on the connecting pipe between V9 and V11.
3. A waste heat dryer using nitrogen regeneration system according to claim 1 or 2, characterized in that: The external nitrogen flange reserved on the V14 and V15 connecting pipelines is connected to the nitrogen pipeline network.
4. A waste heat dryer using nitrogen regeneration system according to claim 1 or 2, characterized in that: The reserved outlet flange is connected to the user pipeline network.