Concrete tower pipe piece lifting appliance
By setting up a vertical welded surface between the support rod and the hanging disk in the concrete tower pipe sheet spreader, the serious wear of the welded surface in the prior art is solved, and a safer and more stable lifting process is achieved.
Patent Information
- Application Number
- CN202420144211.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-19
AI Technical Summary
The welded surface of the existing concrete tower pipe sheet spreader is parallel to the direction of force when lifting, resulting in serious wear on the welded surface during long-term use, causing safety hazards.
Design a concrete tower pipe sheet spreader, by setting a support rod under the suspension disk, the support rod is welded and fixed to the plane under the suspension disk, and the welding surface is perpendicular to the direction of the stress, reducing the possibility of breaking at the welding point, and in the suspension ear Set a hook on the support rod to ensure that the support rod provides stable upward support during lifting.
It effectively reduces wear on the welding surface, improves the safety and stability of the lifting process, extends the service life of the spreader, and reduces safety hazards.
Smart Images

Figure CN222118641U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of concrete towers, and in particular relates to a concrete tower segment hanger. Background Art
[0002] At present, when the bottom diameter of the concrete tower is relatively large in the market, the pipe segments are generally designed as segmented pipe segments due to the load-bearing restrictions of roads and bridges, road transportation width and space, and other conditions. When lifting the pipe segments, a lifting device is required. The lifting device is generally welded from steel sections. When lifting, the welding surface is parallel to the force direction of the lifting device. The mass of the concrete pipe segment is relatively large. When lifting, the force is completely transmitted by the welding surface. The welding surface is severely worn after long-term use, which will cause safety hazards. Utility Model Content
[0003] In order to solve the above problems, the utility model provides a concrete tower segment hanger.
[0004] The purpose of the utility model is achieved in the following ways:
[0005] A concrete tower pipe segment hanger comprises a hanging plate, a hanging ear is fixed in the middle of the hanging plate, the hanging ear is fixed to the hanging plate through at least two crossed support rods, and the upper support plane is abutted and fixed to the lower plane of the hanging plate.
[0006] The highest point of the lifting lug is not higher than the upper surface of the lifting plate.
[0007] The hanging plate and the support rod are welded by using steel sections, and the upper plane of the support rod is welded and fixed to the lower plane of the hanging plate.
[0008] A hook for lifting the concrete tower segment is arranged under the support rod.
[0009] Compared with the prior art, the utility model provides a support rod under the hanging plate to support the hanging plate. During hanging, the welding surface is perpendicular to the direction of the hanging force, which reduces the possibility of disconnection at the welding point. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 Schematic diagram of quarter pipe segment hoisting;
[0011] Figure 2 This is a schematic diagram of the hoisting of one-half pipe segment;
[0012] Figure 3 Schematic diagram of hoisting of whole ring segments;
[0013] Figure 4 It is a schematic diagram of the same lifting device including hooks for a quarter segment, a half segment and a full ring segment;
[0014] Figure 5 Hang one-half of the pipe segment at four points;
[0015] Figure 6 It is a schematic diagram of the lifting lug and the supporting beam;
[0016] Figure 7 is a schematic diagram of another embodiment.
[0017] Among them, 1 is a lifting plate, 12 is a lifting hook, 13 is a lifting ear, 14 is a lifting beam, 15 is a concentric ring, 16 is a connecting rod, 17 is a supplementary beam, and 18 is a supporting rod. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] In the present utility model, unless otherwise expressly specified and limited, the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like to indicate the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model.
[0020] A method for designing a hoisting device for a concrete tower pipe segment includes a hoisting plate 1, a hook 12 is arranged below the hoisting plate, a lifting lug 13 is arranged in the middle of the hoisting plate, after the hook 12 is fixed with the pipe segment and hoisted, the center of gravity of the concrete tower pipe segment and the lifting lug 13 are located on the same vertical line, and the hook 12 is arranged below a hanging beam 14. The lifting lug is a part connected to a lifting device such as a boom, and the hook is a part used to connect to the pipe segment. The lifting lug 13 is located on the same vertical line as the center of gravity of the pipe segment, that is, the point of action of the upward resultant force on the pipe segment when it is hoisted is exactly located on the same vertical line as the center of gravity, so that the hoisted pipe segment is not prone to shaking, and the hoisting process is relatively stable.
[0021] The center of gravity of the segment can be found using 3D modeling software, such as proe. After modeling in the software, the coordinates of the segment's center of gravity can be found using the software's built-in center of gravity function.
[0022] A method for designing a hanging device for a concrete tower segment, wherein the hanging plate 1 is polygonal, mutually perpendicular hanging beams 14 are arranged on the hanging plate, and the hanging hook 12 is arranged below the hanging beams 14. The polygonal hanging plate and the mutually perpendicular hanging beams 14 can be welded by steel sections, which has the advantages of low raw material cost and easy processing and manufacturing.
[0023] The lifting lug is fixed to the hanging plate 1 through at least two crossed support rods 18, and the upper plane of the support rod 18 abuts and is fixed to the lower plane of the hanging plate 1. The upper plane of the support rod abuts and is fixed to the lower plane of the hanging plate, so that during hoisting, the support rod itself directly provides an upward supporting force to the hanging plate, rather than transmitting the upward force through the fixed connection between the support rod and the hanging plate, and the fixed connection is only used to ensure that the relative position between the support rod and the hanging plate does not change.
[0024] The highest point of the lifting lug is not higher than the upper surface of the hanging plate. Since the support rod itself is located below the pad, the lifting lug is fixed on the support rod and has a certain position sinking. The highest point of the lifting lug is not higher than the upper surface of the hanging plate, saving about 300mm of lifting space.
[0025] The support rod is welded by using steel, and the upper plane of the support rod is welded and fixed to the lower plane of the hanging plate. For example, I-beams are used, and the top surfaces of the I-beams are contacted for welding.
[0026] A hook for lifting the concrete tower segment is arranged below the support rod.
[0027] A method for designing a hanger for a concrete tower segment, wherein the hanging plate 1 is circular, a hanging beam 14 is arranged inside the circle, the hanging beam 14 comprises a multi-layer concentric ring 15 structure, the concentric ring structure 15 is fixed by a connecting rod 16, and the connecting rod 16 is arranged along the radial direction.
[0028] The concrete segment is a quarter segment, the lifting lug and the segment gravity center are located on the same vertical line, find the intersection of the two hangers and the projection of the quarter segment on the horizontal plane, so that the chord formed by the two points is perpendicular to the radius that bisects the quarter circle, and set the hook at the position corresponding to the two points on the hanger. The two points found in this way are symmetrical about the symmetry plane of the segment.
[0029] In the method for hoisting a quarter concrete pipe segment, in addition to the two necessary hook positions, a hook is set at the intersection of at least one quarter pipe segment and the projection of the hoist on the horizontal plane. Since two points can only determine one line, the quarter pipe segment may shake, while three points can determine a plane, and setting three hooks can prevent the pipe segment from shaking.
[0030] The method for designing a lifting device for a concrete tower segment is described. The concrete segment is a half segment. After the lifting ear and the center of gravity are aligned in the vertical direction, the lifting plate is rotated so that the projections of the lifting plate and the hanging beam on the horizontal plane form at least three intersections, and the projections of the lifting ears are located inside the closed figure formed by the intersections. Hooks are set at the intersections to lift the concrete segment.
[0031] The projection of the lifting lug is located inside the closed figure formed by the intersection points, which ensures that the points of action of the pipe segment on the lifting fixture will not be concentrated on the same half of the lifting fixture, preventing the lifting fixture from tilting during the lifting process. Four lifting points are preferably used to lift half of the pipe segment, which can ensure a smooth lifting without being too complicated.
[0032] In the method for hoisting the half concrete pipe segment, when there are still no three points that meet the requirements after one rotation, an outwardly extending supplementary beam 17 is installed on the hanging plate, and after the lifting ear and the center of gravity are vertically aligned, the hanging plate is rotated so that the projections of the hanging plate, the hanging beam, the supplementary beam and the pipe segment on the horizontal plane form at least three intersections, and the projections of the lifting ear on the horizontal plane are located inside the closed figure formed by the intersections.
[0033] If the radius of the half pipe segment is large, it may be difficult to find three points that meet the conditions for installing the hook. In this case, if the size of the hanging plate is enlarged, the installation of the hook can be achieved, but the cost is high. Therefore, an additional beam 17 extending outward is installed on the hanging plate, so that during the rotation process, the number of intersection points between the hanger and the half pipe segment on the horizontal plane is increased, so that at least three points that meet the conditions can be found for installing the hook.
[0034] like Figure 5 In the embodiment shown, the outer diameter of the large end of the half segment is 7120mm, the inner diameter is 6600mm, and the wall thickness is 260mm; the outer diameter of the small end is 6960mm, the inner diameter is 6440mm, and the wall thickness is 260mm. The lifting lug is located at the center line of the suspension beam, and the positions of the four lifting hooks form an isosceles trapezoid, in which the two vertices of the lower base of the isosceles trapezoid are located on the supplementary beam, the distance L1 from the upper base of the isosceles trapezoid to the center line of the suspension beam is 935mm, and the distance from the lower base of the isosceles trapezoid to the center line of the suspension beam is 877mm.
[0035] The method for designing a lifting device for a concrete tower segment is described, wherein the concrete segment is a full-ring segment, the lifting lugs are aligned with the center of gravity in the vertical direction, at least three hooks 12 are arranged along the circumferential direction, and the hooks 12 are not all located in the same semicircle. If the hooks are arranged in the same semicircle, the lifting is unstable. It is preferred to arrange more than four hooks, and the hook positions are arranged at equal intervals along the circumference, so that the lifting process can be more stable.
[0036] A concrete tower segment lifting device is provided, wherein the positions of all the hooks 12 obtained above are designed on the same lifting plate 1, and the actual manufacturing is performed based on the design result. Figure 4As shown, when using this type of lifting device, when lifting different pipe segments, just select the lifting hook corresponding to the pipe segment to carry out the lifting without changing the lifting device, thus saving manpower and material resources.
[0037] The above is only a preferred embodiment of the present invention. It should be pointed out that those skilled in the art can make several changes and improvements without departing from the overall concept of the present invention, and these should also be regarded as the protection scope of the present invention.
Claims
1. A concrete tower segment lifting device, comprising a lifting plate (1), characterized in that: A lifting lug (13) is fixed in the middle of the hanging plate (1), and the lifting lug (13) is fixed to the hanging plate (1) via at least two crossed support rods (18), and the upper plane of the support rod (18) abuts against and is fixed to the lower plane of the hanging plate.
2. A concrete tower segment hanger according to claim 1, characterized in that: The highest point of the lifting lug (13) is not higher than the upper surface of the lifting plate (1).
3. A concrete tower segment hanger as claimed in claim 2, characterized in that: The hanging plate (1) and the support rod (18) are welded using section steel, and the upper plane of the support rod (18) is welded and fixed to the lower plane of the hanging plate.
4. A concrete tower segment hanger as claimed in claim 3, characterized in that: A hook (12) for lifting a concrete tower segment is provided below the support rod (18).
