Anti-floating construction for subterranean structures

By setting up a top beam on the top of the underground structure and connecting it with the cast-injected pile, the L-shaped embedded ribs are used to transmit buoyancy, the structural floating problem caused by groundwater is solved, the structural stability is improved and construction costs and difficulty is reduced.

CN222120318UActive Publication Date: 2024-12-06CHINA CONSTR EIGHTH BUREAU RAIL TRANSIT CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420169017.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-12-06
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

In the construction of underground structures, the buoyancy caused by excessive groundwater causes irreversible damage to the structure, and traditional anti-pile-pull or anti-floating anchors are difficult and costly.

Method used

A pressing beam is installed on the top of the underground structure and connected to the cast piles through L-shaped embedded ribs to form an integral structure to offset the buoyancy and reduce construction difficulty and cost.

Benefits of technology

It effectively improves the stability of the underground structure, reduces construction costs and difficulty, avoids direct drilling damage to the cast-injected pile structure, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120318U_ABST
    Figure CN222120318U_ABST
Patent Text Reader

Abstract

The utility model discloses an anti-floating structure for an underground structure, which comprises a coping beam which is connected to the back-to-soil side of an enclosure structure and is pressed on the top of the underground structure, a connecting piece is connected between the coping beam and the enclosure structure, and the construction efficiency is improved by arranging the coping beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of underground structure construction, in particular to an anti-floating structure for underground structures. Background Art

[0002] In the construction of underground structures, excessive groundwater will generate a large upward buoyancy on the underground structure, and this upward buoyancy can easily cause irreversible structural damage to the already built underground structure. Traditional construction methods are to set up pull-out piles or anti-floating anchor rods at the bottom of the underground structure to prevent it. This method is difficult to construct and has a great impact on the construction period. In addition, the project cost is greatly increased. Utility Model Content

[0003] The purpose of the utility model is to overcome the defects of the prior art and provide an anti-floating structure for underground structures. By arranging a top pressure beam on the top of the underground structure, a reaction force is provided when the underground structure has a tendency to float up. The construction difficulty is small and the construction cost is low.

[0004] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is an anti-floating structure for underground structures, including a top beam connected to the back soil side of the retaining structure and pressed on the top of the underground structure, and a connecting piece is connected between the top beam and the retaining structure.

[0005] A further improvement of the anti-floating structure for underground structures of the present invention is that the top pressure beam is provided in a circle along the outer circumference of the underground structure.

[0006] A further improvement of the anti-floating structure of the underground structure of the present invention is that the retaining structure includes a plurality of cast-in-place piles arranged at intervals, the top pressure beam is connected in series with all or part of the cast-in-place piles, and the back-soil side of each cast-in-place pile connected in series by the top pressure beam is connected with the connecting piece.

[0007] A further improvement of the anti-floating structure of the underground structure used in the present invention is that the connecting piece includes an L-shaped embedded reinforcement, the first flange section of the L-shaped embedded reinforcement is connected to the steel cage corresponding to the bored pile, and the second flange section of the L-shaped embedded reinforcement extends out of the steel cage corresponding to the bored pile and points to the back soil side corresponding to the bored pile for connection of the top beam.

[0008] A further improvement of the anti-floating structure of the underground structure of the present invention is that a steel bar connector for connecting the steel bar cage of the top beam is connected to the second flange section of the L-shaped embedded bar.

[0009] A further improvement of the anti-floating structure of the underground structure of the present invention is that each cast-in-place pile is connected to a protective template for covering the end of the steel bar connector and keeping it flush with the back soil surface of the corresponding cast-in-place pile.

[0010] Compared with the prior art, the advantages of this utility model are:

[0011] 1. By connecting the protective template to the steel cage of the cast-in-place pile, the end of the steel connector is protected from pollution and is easy to remove later, avoiding direct excavation of the cast-in-place pile and damage to the structure of the cast-in-place pile.

[0012] 2. The top beams are arranged in a circle to connect the top beams and the enclosure structure to form a whole. When the underground structure has a tendency to float up, the top beams transfer the buoyancy force to the enclosure structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0014] Figure 1 It is a side sectional view of the anti-floating structure of the utility model for underground structures.

[0015] Figure 2 This is a top view of the anti-floating structure of the utility model for underground structures.

[0016] In the figure: 1. Cast-in-place piles; 2. L-shaped embedded reinforcement; 3. Rebar connector; 4. Protective formwork; 5. Top beam. DETAILED DESCRIPTION

[0017] The following describes the embodiments of the present invention through specific examples. Those skilled in the art will readily understand the other advantages and benefits of the present invention from the disclosure herein. The present invention may also be implemented or applied through various other specific embodiments, and the details in this specification may be modified or altered based on different perspectives and applications without departing from the spirit of the present invention.

[0018] The anti-floating structure for underground structures of the present invention will be described in further detail below with reference to the accompanying drawings and specific embodiments.

[0019] See also Figures 1 and 2 As shown, the anti-floating structure for underground structures includes a top beam 5 connected to the back soil side of the retaining structure and pressed on the top of the underground structure, and a connecting piece is connected between the top beam 5 and the retaining structure.

[0020] Preferably, the top beam 5 is provided in a circle along the outer circumference of the underground structure.

[0021] By arranging the top beam 5 into a circle and connecting the top beam 5 with the retaining structure to form a whole, when the underground structure tends to float up, the top beam 5 transfers the buoyancy force to the retaining structure. At this time, the weight of the retaining structure itself and the friction between the pile body and the soil can effectively offset the buoyancy force, thereby improving the structural stability.

[0022] Preferably, the retaining structure includes a plurality of bored piles 1 arranged at intervals, the capping beam 5 is connected in series with all or part of the bored piles 1, and the back-soil side of each bored pile 1 connected in series by the capping beam 5 is connected with the connecting piece.

[0023] By setting up the bored pile 1, the use of prefabricated piles to construct the retaining structure is avoided, the generation of squeezed soil is avoided, and the stability of the foundation pit is improved. The connecting piece can be connected only to the back soil side of some bored piles 1, saving production costs and improving construction efficiency.

[0024] Preferably, the connecting member includes an L-shaped embedded reinforcement 2, the first flange section of the L-shaped embedded reinforcement 2 is connected to the steel cage corresponding to the bored pile 1, and the second flange section of the L-shaped embedded reinforcement 2 extends out of the steel cage corresponding to the bored pile 1 and points to the back soil side corresponding to the bored pile 1 for connection to the top beam 5.

[0025] Specifically, the embedded length of the L-shaped embedded reinforcement 2 in the cast-in-place pile 1 meets the seismic straight anchor length.

[0026] By providing the L-shaped pre-embedded reinforcement 2 , the cast-in-place pile 1 can be excavated later, and the second flange section of the L-shaped pre-embedded reinforcement 2 can be exposed and welded to the reinforcement cage of the top beam 5 .

[0027] Preferably, a steel bar connector 3 for connecting the steel bar cage of the top beam 5 is connected to the second flange section of the L-shaped embedded bar 2 .

[0028] Specifically, the steel bar connector 3 is wrapped with a sealing member for protecting the end, and the sealing member is a plastic film.

[0029] By providing the steel bar connector 3, welding is avoided when the subsequent L-shaped embedded reinforcement 2 is connected to the steel cage of the top beam 5. The steel bar connector 3 improves the connection stability. By using the plastic film to cover the end of the steel bar connector 3, the end of the steel bar connector 3 is protected from pollution.

[0030] Preferably, each cast-in-place pile 1 is connected to a protective template 4 that covers the end of the steel bar connector 3 and remains flush with the back soil surface of the cast-in-place pile 1 .

[0031] Specifically, the protective template 4 is an arc-shaped template, which is compatible with the cast-in-place pile 1 . The protective template 4 is connected to the steel cage corresponding to the cast-in-place pile 1 through steel wire.

[0032] By connecting the protective template 4 to the steel cage of the bored pile 1, the end of the steel connector 3 is protected from pollution, and it is convenient for subsequent chiseling, avoiding direct chiseling of the pile body of the bored pile 1 and damaging the protective layer of the bored pile 1.

[0033] A construction method for an anti-floating structure for an underground structure as described above comprises the steps of:

[0034] Step 1: When constructing the enclosure structure of the underground structure, pre-embed the connectors on the back soil side of the enclosure structure.

[0035] Step 2: After the underground structure is constructed, a top beam 5 is constructed between the underground structure and the enclosure structure and at the top of the underground structure, and the top beam 5 is connected to the connector;

[0036] Preferably, when constructing the top beam 5, a circle of steel cage of the top beam 5 is first tied along the outer periphery of the underground structure, and during the tying process, each connecting piece is connected to the steel cage of the top beam 5, and then the top beam 5 is cast to form.

[0037] Specifically, after the waterproof layer on the top of the underground structure is constructed and maintained, the steel cage of the top beam 5 is tied on the top of the underground structure.

[0038] Specifically, before tying the reinforcement cage of the top beam 5 , the bottom formwork of the top beam 5 is first laid on the top of the underground structure, and then the reinforcement cage of the top beam 5 is tied on the bottom formwork.

[0039] By laying the bottom formwork in advance, it is avoided that after the reinforcement cage of the top beam 5 is tied, it is pressed on the top of the underground structure, resulting in a lack of support space for the bottom formwork.

[0040] Specifically, when tying the steel bars of the top compression beam 5 , the main bars and stirrups are tied first. After the main bars and stirrups are tied as required, the connecting bars are used to connect them to the corresponding steel bar connectors 3 .

[0041] If the connecting reinforcement between the top beam 5 and the reinforcement connector 3 is installed first, the connecting reinforcement may affect the reinforcement binding of the top beam 5 .

[0042] Since one side of the top beam 5 is the retaining structure, the formwork on the side relatively far away from the retaining structure cannot be connected using traditional tension bolts. Therefore, when supporting the formwork on the side of the top beam 5 relatively far away from the retaining structure, diagonal braces are used, and the diagonal braces are supported on the top surface of the underground structure.

[0043] Preferably, when constructing the retaining structure, multiple cast-in-place piles 1 are constructed at intervals, and the connector is connected to the back soil side of all or part of the cast-in-place piles 1;

[0044] When the top pressure beam 5 is connected to the enclosure structure, the top pressure beam 5 is connected in series with all the cast-in-place piles 1 connected to the connecting piece.

[0045] Specifically, when the connecting piece is connected to the cast-in-place pile 1 , it is ensured that the connecting position of the connecting piece corresponds to the designed height of the top beam 5 .

[0046] Preferably, the connector includes an L-shaped embedded reinforcement 2. When constructing each cast-in-place pile 1:

[0047] First, the first flange section of the L-shaped pre-embedded reinforcement 2 is connected to the reinforcement cage corresponding to the cast-in-place pile 1, so that the second flange section of the L-shaped pre-embedded reinforcement 2 is arranged along the radial direction of the reinforcement cage corresponding to the cast-in-place pile 1;

[0048] Then, a steel bar connector 3 is connected to the second flange section, and a protective template 4 is connected to the end of the steel bar connector 3 so that the side of the protective template 4 that is relatively far away from the steel bar connector 3 is flush with the surface design position of the cast-in-place pile 1;

[0049] Then lower the steel cage of the bored pile 1 into the corresponding pile hole, so that the protective template 4 faces the back soil side and abuts against the inner wall of the corresponding pile hole;

[0050] Finally, pouring is performed to form a cast-in-place pile 1.

[0051] Specifically, when the corresponding cast-in-place pile 1 is connected to the capping beam 5 , the protective template 4 on the back side of the corresponding cast-in-place pile 1 is chiseled out to expose the steel bar connector 3 for connection to the steel bar cage of the capping beam 5 .

[0052] By providing the protective template 4 , the pile body of the bored pile 1 is prevented from being directly excavated, thereby protecting the protective layer of the bored pile 1 .

[0053] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for understanding and reading by those familiar with this technology, and are not used to limit the conditions for implementation of the present invention. Therefore, they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size should still fall within the scope of the technical content disclosed in the present invention without affecting the efficacy and purpose of the present invention. At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments in their relative relationships should also be considered as the scope of implementation of the present invention without substantially changing the technical content.

[0054] The above description is merely a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment, it is not intended to limit the present invention. Any technician familiar with the profession can make some changes or modifications to the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. An anti-floating structure for an underground structure, characterized in that: It includes a capping beam connected to the back-to-earth side of the retaining structure and pressed against the top of the underground structure, a connecting piece is connected between the capping beam and the retaining structure, the retaining structure includes a plurality of bored piles arranged at intervals, the capping beam is connected in series with all or part of the bored piles, the back-to-earth side of each of the bored piles connected in series by the capping beam is connected with the connecting piece, the connecting piece includes an L-shaped embedded reinforcement, a first flange section of the L-shaped embedded reinforcement is connected to a steel cage corresponding to the bored pile, a second flange section of the L-shaped embedded reinforcement extends out of the steel cage corresponding to the bored pile and points to the back-to-earth side of the bored pile for connection with the capping beam, a steel bar connector for connecting the steel cage of the capping beam is connected to the second flange section of the L-shaped embedded reinforcement, and each of the bored piles is connected with a protective template for covering the end of the steel bar connector and keeping it flush with the back-to-earth surface of the corresponding bored pile.

2. The anti-floating structure for underground structures according to claim 1, characterized in that: The capping beam is arranged in a circle along the outer circumference of the underground structure.