Construction protective fence

By designing a spliced ​​and disassembled construction protective fence, the fixed fence takes up space and transportation difficulties are solved, and the effect of rapid installation and convenient transportation is achieved.

CN222121163UActive Publication Date: 2024-12-06ANHUI MITENG ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420666239.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-06
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

The existing construction protective fences are mostly fixed, occupying a large space, high transportation costs, and difficult to store when not in use.

Method used

A construction protective fence consisting of two fixed columns and three baffles was designed, and a combination of installation components, grooves and insert columns were installed to achieve rapid splicing and disassembly, and the use of magnetic connections and handles for easy installation and removal.

Benefits of technology

It realizes rapid splicing and disassembly, facilitates blocking and transportation of construction areas and reduces space occupation during transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121163U_ABST
    Figure CN222121163U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction protection, and discloses a construction protective fence which comprises two fixing columns and three baffles, mounting assemblies are arranged at the bottom ends of the two fixing columns, and grooves are formed in the back sides of the two fixing columns. According to the scheme, the two ends of the three baffles are clamped in the two grooves, meanwhile, one end of one inserting column movably penetrates through one ends of the three baffles and one fixing column, and one end of the other inserting column movably penetrates through the other ends of the three baffles and the other fixing column; the splicing of the two fixing columns and the three baffles can be rapidly completed, the device can be put into use in time and block a construction area, when the device is not used, the device can be rapidly disassembled and stored and is convenient to transport, and the occupied space in the transportation process is reduced to some extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of construction protection, and particularly relates to a construction protection fence. Background Art

[0002] During building construction, in order to prevent passing vehicles and people from accidentally entering the construction area and causing safety accidents, the construction party often sets up safety protection fences around the construction area for isolation. This can be used to enhance construction safety and at the same time remind others to pay attention to the dangers at the construction site. Most of the current construction protection fences used are fixed fences, which are transported to the construction site as a whole, occupying space and having a relatively high transportation cost. Moreover, when they are not used in subsequent building construction, they are difficult to store. Utility Model Content

[0003] In order to solve the problem that most of the current construction protection fences used are fixed fences, which are transported to the construction site as a whole, arranged, occupying space and having a relatively high transportation cost, and when they are not used in subsequent building construction, they are difficult to store, this application provides a construction protection fence.

[0004] A construction protection fence provided by this application adopts the following technical solutions:

[0005] A construction protection fence includes two fixed columns and three baffles. Installation components are provided at the bottom ends of the two fixed columns. Grooves are opened on the back sides of the two fixed columns. One end of each of the three baffles is movably inserted into one of the grooves, and the other end of each of the three baffles is movably inserted into the other groove. One side of each of the two baffles is in contact with both sides of the other baffle. Insertion posts movably penetrate through the middle parts of the tops of the two fixed columns. One end of one of the insertion posts movably penetrates through one end of the three baffles, and one end of the other insertion post movably penetrates through the other end of the three baffles.

[0006] Preferably, the installation component is composed of a U-shaped block, an insertion rod, and a magnet block. A jack is opened at one end of the bottom of the fixed column. The U-shaped block is located at the bottom of the fixed column. The insertion rod is welded to the top of the U-shaped block. The insertion rod is movably inserted into one of the jacks. The magnet block is fixedly installed at the top of the insertion rod. The magnet block is magnetically connected to the fixed column.

[0007] Preferably, warning tapes are bonded to the front sides of the three baffles, and the distances between every two of the three warning tapes are the same.

[0008] Preferably, handles are bonded to the tops of the back sides of the two fixed columns, and both of the handles are in a T shape.

[0009] In summary, the present application includes the following beneficial technical effects: By clamping the two ends of the three baffles in the two grooves, and at the same time, one end of one of the insertion posts movably penetrates one end of the three baffles and one of the fixed posts, and one end of the other insertion post movably penetrates the other end of the three baffles and the other fixed post, the splicing of the two fixed posts and the three baffles can be quickly completed, and it can be put into use in time to block the construction area. Moreover, when not in use, it can be quickly disassembled and stored, which is convenient for transportation and reduces the space occupied during transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a front view structural schematic diagram of an embodiment of the application.

[0011] Figure 2 It is a rear view structural schematic diagram of an embodiment of the application.

[0012] Figure 3 It is a disassembled structural schematic diagram of an embodiment of the application.

[0013] Description of the reference numerals: 1, fixed post; 2, installation component; 21, U-shaped block; 22, insertion rod; 23, magnet block; 3, baffle; 4, insertion post; 5, handle; 6, warning tape. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0014] The following further describes the present application in detail Figure 1-3 with reference to the accompanying drawings.

[0015] An embodiment of the present application discloses a construction protection fence. Referring to Figure 1 , Figure 2 and Figure 3 , it includes two fixed posts 1 and three baffles 3. Installation components 2 are provided at the bottom ends of the two fixed posts 1, and the two installation components 2 can be used to fix the two fixed posts 1 on the ground. Grooves are provided on the back sides of the two fixed posts 1. One end of each of the three baffles 3 is movably inserted into one of the grooves, and the other end of each of the three baffles 3 is movably inserted into the other groove. One side of each of the two baffles 3 is in contact with both sides of the other baffle 3. The middle parts of the tops of the two fixed posts 1 are movably penetrated by insertion posts 4. One end of one of the insertion posts 4 movably penetrates one end of the three baffles 3, and one end of the other insertion post 4 movably penetrates the other end of the three baffles 3. In this way, the three baffles 3 can be spliced and fixed with the two fixed posts 1, and then the construction area can be blocked.

[0016] Referring to Figure 1 and Figure 3, the installation component 2 is composed of a U-shaped block 21, a plug rod 22 and a magnet block 23. One end of the bottom of the fixed column 1 is provided with a jack. The U-shaped block 21 is located at the bottom of the fixed column 1. The plug rod 22 is welded to the top end of the U-shaped block 21. The plug rod 22 is movably inserted into the interior of one of the jacks, so that the connection between the U-shaped block 21 and the fixed column 1 can be realized. The magnet block 23 is fixedly installed at the top end of the plug rod 22. The magnet block 23 is magnetically connected to the fixed column 1, thereby preventing the plug rod 22 from slipping out of the interior of the jack.

[0017] Refer to Figure 1 , warning tapes 6 are adhered to the front sides of the three baffles 3. The distances between any two of the three warning tapes 6 are the same. The three warning tapes 6 can be used to play a warning role to prevent passing vehicles or people from getting too close to the baffle 3.

[0018] Refer to Figure 2 and Figure 3 , handles 5 are adhered to the top ends of the back sides of the two fixed columns 1. The two handles 5 are both in a T shape. Holding the two handles 5 facilitates the position movement of the two fixed columns 1.

[0019] The implementation principle of a construction protection fence in an embodiment of the present application is as follows: during use, insert the two U-shaped blocks 21 into the ground, then lay the two fixed columns 1 on the ground, and clamp the two ends of the three baffles 3 in the two grooves. At the same time, insert one end of one of the plug posts 4 through one end of the three baffles 3 and one of the fixed columns 1, and insert one end of the other plug post 4 through the other end of the three baffles 3 and the other fixed column 1, thereby completing the splicing of the two fixed columns 1 and the three baffles 3. Finally, lift the two fixed columns 1 by using the two handles 5, and at the same time, sleeved the bottom ends of the two fixed columns 1 on the two plug rods 22 respectively, thereby vertically supporting the two fixed columns 1 and indirectly vertically supporting the three baffles 3.

[0020] Finally, several points should be noted: First, in the description of the present application, it should be noted that unless otherwise specified and limited, the terms "installation", "connection", "coupling" should be understood in a broad sense, which can be mechanical connection or electrical connection, and can also be the communication inside two components. It can be directly connected. "Up", "down", "left", "right", etc. are only used to represent the relative position relationship. When the absolute position of the described object changes, the relative position relationship may change;

[0021] Second: In the attached drawings of the disclosed embodiments of the present utility model, only the structures related to the disclosed embodiments of the present disclosure are involved. Other structures can refer to the general design. Without conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0022] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

[0023] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction protection fence, comprising two fixed columns (1) and three baffles (3), characterized in that: Installation components (2) are provided at the bottom ends of the two fixed columns (1). Grooves are formed on the back sides of the two fixed columns (1). One end of each of the three baffles (3) is movably inserted into one of the grooves, and the other end of each of the three baffles (3) is movably inserted into the other groove. One side of each of the two baffles (3) is in contact with both sides of the other baffle (3). Insertion columns (4) movably penetrate through the middle parts of the tops of the two fixed columns (1). One end of one of the insertion columns (4) movably penetrates through one end of the three baffles (3), and one end of the other insertion column (4) movably penetrates through the other end of the three baffles (3).

2. A construction protection fence according to claim 1, characterized in that: The installation component (2) is composed of a U-shaped block (21), an insertion rod (22), and a magnet block (23). A jack is formed at one end of the bottom of the fixed column (1). The U-shaped block (21) is located at the bottom of the fixed column (1). The insertion rod (22) is welded to the top end of the U-shaped block (21). The insertion rod (22) is movably inserted into one of the jacks. The magnet block (23) is fixedly installed at the top end of the insertion rod (22). The magnet block (23) is magnetically connected to the fixed column (1).

3. A construction protection fence according to claim 1, characterized in that: Warning tapes (6) are bonded to the front sides of the three baffles (3). The distances between any two of the three warning tapes (6) are the same.

4. A construction protection fence according to claim 1, characterized in that: Carrying handles (5) are bonded to the top ends of the back sides of the two fixed columns (1). Both of the carrying handles (5) are T-shaped.