Direct-current charger testing device

By designing a DC charger test device and using functions such as simulated insulation fault detection, the safety hazards and detection limitations of DC charger testing in the existing technology are solved, and safe and reliable detection and accurate testing of fault conditions are achieved, and the testing is improved. security and accuracy.

CN222125370UActive Publication Date: 2024-12-06SUZHOU MINGTAI INTELLIGENT EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421051138.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-12-06
Estimated Expiration
2034-05-15

AI Technical Summary

Technical Problem

The existing technology has problems of safety hazards and irrecoverable damage in DC charger testing, especially when detecting faulty conditions. Manually cutting into the test process can easily lead to wiring errors and battery damage, and it is impossible to effectively detect line insulation failures and battery reverses. Problems such as connection and output short circuit.

Method used

A DC charger test device is designed, including a test switching unit, a simulated insulation fault unit, a simulated battery unit, a main control unit, a human-computer interaction unit and a gun seat. The voltage stabilization and current stabilization accuracy detection are achieved through different test loops. Analog insulation fault detection, analog output overvoltage detection, analog battery reverse detection and analog output short circuit detection, avoid manual manual entry and improve the safety and accuracy of the test.

Benefits of technology

It realizes safe and reliable detection of the fault status of the charger, avoids the complexity and safety risks of manual testing, is convenient to operate, can display test data in real time, and improves the accuracy and safety of the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222125370U_ABST
    Figure CN222125370U_ABST
Patent Text Reader

Abstract

The utility model discloses a direct-current charger testing device, which comprises a testing switching unit, a simulation insulation fault unit, a simulation battery unit, a main control unit, a man-machine interaction unit, a simulation battery management system unit and a gun seat, and is characterized in that different testing items and testing parameters are set on the man-machine interaction unit; multiple tests such as voltage stabilization and current stabilization precision detection, simulation of insulation fault detection, simulation of output overvoltage detection, simulation of battery reverse connection detection and simulation of output short circuit detection of the charger can be completed, the test operation is convenient, safe and reliable, and complexity and potential safety hazards of manual test are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of charging, and more specifically relates to a DC charger testing device. Background Art

[0002] With the development of new energy technology, the output of new energy vehicles has increased year by year, and the demand for supporting chargers has also gradually increased. In order to shorten the charging time and improve the charging efficiency, charger technology is developing in the direction of high voltage and high current. This puts higher requirements on the safety of chargers. Before chargers are officially put into use, they need to undergo a series of performance and function tests.

[0003] The prior art mainly uses batteries and battery management systems as loads for testing DC chargers. This testing method can only be used for testing under normal conditions. If the battery is directly used for reverse connection detection, it is very likely to cause irreversible failure of the battery, which poses certain safety risks. Therefore, the current charger testing projects are mainly for testing the normal functions and performance of the charger. When testing some fault conditions of the charger (such as line insulation failure, reverse connection of the battery, output short circuit, etc.), the main testing method is to manually access the fault point on the input and output sides of the charger and manually cut in during the test process. This testing method has great testing limitations, and wiring misoperation, manual cut-in timing errors, charger faults, and defects during the test process will cause irreversible damage to the battery. In addition, since the charger outputs high voltage and high current, manually cutting into the fault point during the test process will bring certain safety hazards. Utility Model Content

[0004] In order to solve the above problems, the utility model provides a DC charger testing device, which can complete the charger's voltage stabilization, current stabilization accuracy detection, simulated insulation fault detection, simulated output overvoltage detection, simulated battery reverse connection detection, and simulated output short circuit detection by connecting to different test circuits.

[0005] The technical solution adopted by the utility model to solve its technical problems is: a DC charger test device, which includes a test switching unit, a simulated insulation fault unit, a simulated battery unit, a main control unit, a human-computer interaction unit, a simulated battery management system unit and a gun holder; the charger under test is connected to the DC charger test device through the gun holder; the main control unit is respectively connected to the human-computer interaction unit, the simulated battery unit, the test switching unit, the simulated insulation fault unit and the gun holder; the main control unit obtains test items and parameters from the human-computer interaction unit, controls the test switching unit, the simulated insulation fault unit and the simulated battery unit to work according to the test information, and connects with the charger under test through the gun holder to exchange data, and displays the test data in real time on the human-computer interaction unit, and the simulated battery management system unit communicates with the charger under test through the gun holder.

[0006] Furthermore, the test switching unit can switch different test circuits to complete voltage stabilization, current stabilization accuracy detection, simulated insulation fault detection, simulated output overvoltage detection, simulated battery reverse connection detection, and simulated output short circuit detection.

[0007] Further, the test switching unit includes a first relay, a second relay, a third relay, a fourth relay, a fifth relay, a sixth relay, a seventh relay, and an eighth relay, the normally closed terminal of the first relay is connected to the positive and negative outputs of the gun seat, the normally open terminal of the first relay is connected to the positive and negative outputs of the DC charger test device, the normally closed terminal of the second relay is connected to the positive and negative outputs of the gun seat, the normally open terminal of the second relay's positive output is connected to the normally closed terminals of the fifth relay and the seventh relay, the normally open terminal of the second relay's negative output is connected to the normally closed terminals of the third relay and the sixth relay, the normally open terminal of the third relay is connected to the normally open terminal of the fifth relay and the normally closed terminal of the fourth relay, the normally open terminal of the seventh relay is connected to the normally open terminal of the sixth relay and the normally closed terminal of the eighth relay, the normally open terminal of the fourth relay is connected to the positive pole of the simulated battery cell, and the normally open terminal of the eighth relay is connected to the negative pole of the simulated battery cell.

[0008] Furthermore, the insulation fault simulation unit can simulate symmetrical insulation detection faults and asymmetrical insulation detection faults.

[0009] Further, the simulated insulation fault unit includes a ninth relay, a tenth relay, an eleventh relay, a twelfth relay, a thirteenth relay, a fourteenth relay, a first resistor, a second resistor, a third resistor, a fourth resistor, a fifth resistor, a sixth resistor, a seventh resistor, and an eighth resistor. The normally closed end of the ninth relay is connected to the positive and negative outputs of the gun seat, the normally open end of the ninth relay is connected to the first resistor and the second resistor respectively, and the other ends of the first resistor and the second resistor are connected to the ground. The normally closed end of the tenth relay is connected to the positive and negative outputs of the gun seat, the normally open end of the tenth relay is connected to the third resistor and the fourth resistor respectively, and the other ends of the third resistor and the fourth resistor are connected to the ground. One end of the fifth resistor and the sixth resistor is connected to the positive output of the gun seat, the other ends of the fifth resistor and the sixth resistor are connected to the normally closed end of the eleventh relay and the twelfth relay, and the normally open ends of the eleventh relay and the twelfth relay are connected to the ground. One end of the seventh resistor and the eighth resistor is connected to the negative output of the gun seat, the other ends of the seventh resistor and the eighth resistor are connected to the normally closed end of the thirteenth relay and the fourteenth relay, and the normally open ends of the thirteenth relay and the fourteenth relay are connected to the ground.

[0010] Furthermore, control ends of the first relay, the second relay, the third relay, the fourth relay, the fifth relay, the sixth relay, the seventh relay, the eighth relay, the ninth relay, the tenth relay, the eleventh relay, the twelfth relay, the thirteenth relay, and the fourteenth relay are all controlled by the main control unit.

[0011] Furthermore, the human-computer interaction unit includes a touch screen, buttons, indicator lights, knob switches, and test terminals for displaying test information, setting test items and parameters, and the test terminals can be externally connected to standard test instruments and equipment.

[0012] The DC charger test device of the present invention has the following beneficial effects:

[0013] 1. It can simulate insulation fault detection, output overvoltage detection, battery reverse connection detection, output short circuit detection and other fault tests during charging;

[0014] 2. The testing process is easy to operate, safe and reliable, avoiding the complexity and safety hazards of manual testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The utility model is a principle block diagram of a DC charger testing device. DETAILED DESCRIPTION

[0016] The technical solution of the utility model is further explained below in conjunction with the accompanying drawings.

[0017] like Figure 1As shown, a DC charger test device comprises a test switching unit 1, a simulated insulation fault unit 2, a simulated battery unit 3, a main control unit 4, a human-machine interaction unit 5, a simulated battery management system unit 6 and a gun holder 7; the charger under test is connected to the charger test device through the gun holder 7; the main control unit 1 is respectively connected to the human-machine interaction unit 5, the simulated battery unit 3, the test switching unit 1, the simulated insulation fault unit 2 and the gun holder 7; the main control unit 1 obtains test items and parameters from the human-machine interaction unit 5, controls the test switching unit 1, the simulated insulation fault unit 2 and the simulated battery unit 3 to work according to the test information, and connects to the charger under test through the gun holder 7 for data exchange, and displays the test data in real time on the human-machine interaction unit 5, and the simulated battery management system unit communicates with the charger under test through the gun holder.

[0018] The test switching unit 1 can switch different test circuits to complete voltage stabilization, current stabilization accuracy detection, simulated insulation fault detection, simulated output overvoltage detection, simulated battery reverse connection detection, and simulated output short circuit detection.

[0019] The test switching unit 1 includes a first relay K1, a second relay K2, a third relay K3, a fourth relay K4, a fifth relay K5, a sixth relay K6, a seventh relay K7, and an eighth relay K8. The normally closed terminal of the first relay K1 is connected to the positive and negative outputs of the gun holder 7, the normally open terminal of the first relay K1 is connected to the positive and negative outputs of the DC charger test device, and the normally closed terminal of the second relay K2 is connected to the positive and negative outputs of the gun holder 7. The normally open terminal of the second relay K2 with a positive output is connected to the normally closed terminals of the fifth relay K5 and the seventh relay K7, the normally open terminal of the second relay K2 with a negative output is connected to the normally closed terminals of the third relay K3 and the sixth relay K6, the normally open terminal of the third relay K3 is connected to the normally open terminal of the fifth relay K5 and the normally closed terminal of the fourth relay K4, the normally open terminal of the seventh relay K7 is connected to the normally open terminal of the sixth relay K6 and the normally closed terminal of the eighth relay K8, the normally open terminal of the fourth relay K4 is connected to the positive electrode of the simulated battery cell 3, and the normally open terminal of the eighth relay K8 is connected to the negative electrode of the simulated battery cell 3.

[0020] When testing the voltage and current stabilization accuracy of the charger, select the corresponding test item on the touch screen of the human-machine interaction unit 5. The human-machine interaction unit 5 sends the test item data to the main control unit 4. The main control unit 4 controls the first relay K1 in the test switching unit 1 to close, and connects standard test instruments such as load and multimeter to the output terminal. Set the charger working mode and output voltage and current through the touch screen according to the test requirements, and perform the corresponding item test.

[0021] When testing the charger output short-circuit protection, select the corresponding test item on the touch screen of the human-machine interaction unit 5, and the human-machine interaction unit 5 sends the test item data to the main control unit 4. The main control unit 4 controls the second relay K2, the third relay K3, and the fifth relay K5 in the test switching unit 1 to close, which can simulate the short circuit of the charger DC output.

[0022] During the output reverse connection protection test, the corresponding test item is selected on the touch screen of the human-computer interaction unit 5, and the human-computer interaction unit 5 sends the test item data to the main control unit 4. The main control unit 4 controls the second relay K2, the third relay K3, the fourth relay K4, the seventh relay K7, and the eighth relay K8 in the test switching unit 1 to close, which can simulate the reverse connection of the battery at the charger output port.

[0023] During the output overvoltage protection test, the corresponding test item is selected on the touch screen of the human-computer interaction unit 5, and the human-computer interaction unit 5 sends the test item data to the main control unit 4. The main control unit 4 controls the second relay K2, the fourth relay K4, the fifth relay K5, the sixth relay K6, and the eighth relay K8 in the test switching unit 1 to close, and at the same time gradually increases the output voltage of the simulated battery unit 3 until the charger displays an output overvoltage alarm. At this time, the output voltage of the simulated battery unit 3 is the overvoltage protection value of the charger.

[0024] The simulated insulation fault unit 2 can simulate symmetrical insulation detection faults and asymmetrical insulation detection faults. The simulated insulation fault unit 2 includes a ninth relay K9, a tenth relay K10, an eleventh relay K11, a twelfth relay K12, a thirteenth relay K13, a fourteenth relay K14, a first resistor R1, a second resistor R2, a third resistor R3, a fourth resistor R4, a fifth resistor R5, a sixth resistor R6, a seventh resistor R7, and an eighth resistor R8. The normally closed end of the ninth relay K9 is connected to the positive and negative outputs of the gun holder 7. The normally open end of the ninth relay K9 is connected to the first resistor R1 and the second resistor R2 respectively. The other ends of the first resistor R1 and the second resistor R2 are connected to the ground. The normally closed end of the tenth relay K10 is connected to the positive and negative outputs of the gun holder 7. The normally closed end of the tenth relay K10 is connected to the positive and negative outputs of the gun holder 7. The starting ends are respectively connected to the third resistor R3 and the fourth resistor R4, the other ends of the third resistor R3 and the fourth resistor R4 are connected to the ground, one end of the fifth resistor R5 and the sixth resistor R6 is connected to the positive output of the gun holder 7, the other ends of the fifth resistor R5 and the sixth resistor R6 are connected to the normally closed ends of the eleventh relay K11 and the twelfth relay K12, the normally open ends of the eleventh relay K11 and the twelfth relay K12 are connected to the ground, one end of the seventh resistor R7 and the eighth resistor R8 is connected to the negative output of the gun holder 7, the other ends of the seventh resistor R7 and the eighth resistor R8 are connected to the normally closed ends of the thirteenth relay K13 and the fourteenth relay K14, and the normally open ends of the thirteenth relay K13 and the fourteenth relay K14 are connected to the ground.

[0025] When testing the charger to simulate insulation detection failure, select the corresponding test item on the touch screen of the human-machine interaction unit 5, and the human-machine interaction unit 5 sends the test item data to the main control unit 4. The main control unit 4 controls the ninth relay K9 or the tenth relay K10 in the test switching unit 1 to close, which can simulate the abnormal insulation resistance of the positive and negative poles to the ground at the same time. The main control unit 4 controls the eleventh relay K11 or the twelfth relay K12 in the test switching unit 1 to close, which can simulate the abnormal insulation resistance of the positive pole to the ground. The main control unit 4 controls the thirteenth relay K13 and the fourteenth relay K14 in the test switching unit 1 to close, which can simulate the abnormal insulation resistance of the negative pole to the ground.

[0026] The control ends of the first relay K1, the second relay K2, the third relay K3, the fourth relay K4, the fifth relay K5, the sixth relay K6, the seventh relay K7, the eighth relay K8, the ninth relay K9, the tenth relay K10, the eleventh relay K11, the twelfth relay K12, the thirteenth relay K13 and the fourteenth relay K14 are all controlled by the main control unit 4.

[0027] The human-machine interaction unit 5 includes a touch screen, buttons, indicator lights, knob switches, and test terminals, which are used to display test information, set test items and parameters, and the test terminals can be externally connected to standard test instruments and equipment.

[0028] Obviously, the above embodiments are merely examples for the purpose of clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the scope of protection of the present utility model.

Claims

1. A DC charger test device, comprising a test switching unit, a simulated insulation fault unit, a simulated battery unit, a main control unit, a human-computer interaction unit, a simulated battery management system unit and a gun mount, characterized in that: The charger under test is connected to the DC charger test device through the gun holder, and the main control unit is connected to the human-machine interaction unit, the simulated battery unit, the test switching unit, the simulated insulation fault unit, and the gun holder respectively. The main control unit obtains test items and parameters from the human-machine interaction unit, controls the test switching unit, the simulated insulation fault unit, and the simulated battery unit to work according to the test information, and connects with the charger under test through the gun holder to exchange data, and displays the test data in real time on the human-machine interaction unit. The simulated battery management system unit communicates with the charger under test through the gun holder.

2. A DC charger testing device according to claim 1, characterized in that: The test switching unit can switch different test circuits to complete voltage stabilization, current stabilization accuracy detection, simulated insulation fault detection, simulated output overvoltage detection, simulated battery reverse connection detection, and simulated output short circuit detection.

3. A DC charger testing device according to claim 1, characterized in that: The test switching unit includes a first relay, a second relay, a third relay, a fourth relay, a fifth relay, a sixth relay, a seventh relay, and an eighth relay. The normally closed terminal of the first relay is connected to the positive and negative outputs of the gun seat, the normally open terminal of the first relay is connected to the positive and negative outputs of the DC charger test device, the normally closed terminal of the second relay is connected to the positive and negative outputs of the gun seat, the normally open terminal of the second relay outputting positive is connected to the normally closed terminals of the fifth relay and the seventh relay, the normally open terminal of the second relay outputting negative is connected to the normally closed terminals of the third relay and the sixth relay, the normally open terminal of the third relay is connected to the normally open terminal of the fifth relay and the normally closed terminal of the fourth relay, the normally open terminal of the seventh relay is connected to the normally open terminal of the sixth relay and the normally closed terminal of the eighth relay, the normally open terminal of the fourth relay is connected to the positive pole of the simulated battery cell, and the normally open terminal of the eighth relay is connected to the negative pole of the simulated battery cell.

4. A DC charger testing device according to claim 1, characterized in that: The insulation fault simulation unit can simulate symmetrical insulation detection faults and asymmetrical insulation detection faults.

5. A DC charger testing device according to claim 1, characterized in that: The simulated insulation fault unit includes a ninth relay, a tenth relay, an eleventh relay, a twelfth relay, a thirteenth relay, a fourteenth relay, a first resistor, a second resistor, a third resistor, a fourth resistor, a fifth resistor, a sixth resistor, a seventh resistor, and an eighth resistor. The normally closed end of the ninth relay is connected to the positive and negative outputs of the gun seat, the normally open end of the ninth relay is connected to the first resistor and the second resistor respectively, and the other ends of the first resistor and the second resistor are connected to the ground. The normally closed end of the tenth relay is connected to the positive and negative outputs of the gun seat, the normally open end of the tenth relay is connected to the third resistor and the fourth resistor respectively, and the other ends of the third resistor and the fourth resistor are connected to the ground. One end of the fifth resistor and the sixth resistor is connected to the positive output of the gun seat, the other ends of the fifth resistor and the sixth resistor are connected to the normally closed end of the eleventh relay and the twelfth relay, and the normally open ends of the eleventh relay and the twelfth relay are connected to the ground. One end of the seventh resistor and the eighth resistor is connected to the negative output of the gun seat, the other ends of the seventh resistor and the eighth resistor are connected to the normally closed end of the thirteenth relay and the fourteenth relay, and the normally open ends of the thirteenth relay and the fourteenth relay are connected to the ground.

6. A DC charger testing device according to claim 1, characterized in that: The control ends of the first relay, the second relay, the third relay, the fourth relay, the fifth relay, the sixth relay, the seventh relay, the eighth relay, the ninth relay, the tenth relay, the eleventh relay, the twelfth relay, the thirteenth relay and the fourteenth relay are all controlled by the main control unit.

7. A DC charger testing device according to claim 1, characterized in that: The human-computer interaction unit includes a touch screen, buttons, indicator lights, knob switches, and test terminals, which are used to display test information, set test items and parameters, and the test terminals can be externally connected to standard test instruments and equipment.