Electromagnetic flowmeter convenient to install
By introducing lifting components, leveling components and clamping components into the electromagnetic flowmeter, the complex installation problem of traditional electromagnetic flowmeters is solved, convenient height and angle adjustment is achieved, and installation efficiency and practicality are improved.
Patent Information
- Application Number
- CN202420206034.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-01-29
AI Technical Summary
Traditional electromagnetic flowmeters are complicated to operate and inconvenient to install, especially in the case of inclined installation, and lack convenient height and angle adjustment mechanisms.
An electromagnetic flowmeter structure including lifting components, leveling components and clamping components is designed. The height is adjusted by lifting components, the angle is adjusted by leveling components, and the clamping components are conveniently clamped the instrument, simplifying the installation process.
It realizes simple installation of electromagnetic flowmeters, improves installation efficiency and practicality, adapts to different installation environments, and reduces operational complexity.
Smart Images

Figure CN222144239U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of electromagnetic flowmeters, and in particular relates to an electromagnetic flowmeter which is easy to install. Background Art
[0002] The electromagnetic flowmeter is a new type of flow measurement instrument that developed rapidly in the 1950s and 1960s with the development of electronic technology. The electromagnetic flowmeter uses the principle of electromagnetic induction to measure the flow rate of conductive fluid based on the induced electromotive force when the conductive fluid passes through an external magnetic field. Its structure is mainly composed of a magnetic circuit system, a measuring conduit, electrodes, a casing, a lining and a converter.
[0003] Traditional electromagnetic flowmeters do not have a lifting mechanism during use. During installation, they need to be lifted using a lifting mechanism and lifted to a height parallel to the water pipe for docking. The lifting process requires manual support of the electromagnetic flowmeter, which is complicated to operate, inconvenient to install, and has poor overall practicality, especially for inclined installation conditions, which is more time-consuming and labor-intensive.
[0004] Therefore, it is urgent to design an electromagnetic flowmeter that is easy to install to solve the problems of complex operation, inconvenient installation, time-consuming and labor-intensive installation of the electromagnetic flowmeter in the prior art mentioned above. Utility Model Content
[0005] In order to solve the technical problems of complicated operation, inconvenient installation, time-consuming and labor-intensive installation of electromagnetic flowmeters in the prior art mentioned in the background technology, an electromagnetic flowmeter that is easy to install is provided to solve the above problems.
[0006] To achieve the above purpose, the specific technical solution of the electromagnetic flowmeter that is easy to install in the utility model is as follows:
[0007] An electromagnetic flowmeter that is easy to install includes a first base, a lifting assembly is arranged on the first base, a second base is arranged on a side of the lifting assembly away from the first base, a leveling assembly is arranged on the second base, a third base is arranged on a side of the leveling assembly away from the second base, a clamping assembly is slidably arranged on the third base, and the clamping assembly is used to clamp the electromagnetic flowmeter.
[0008] Furthermore, the lifting assembly includes a first lifting tube, one end of which is fixedly arranged on the first base, a second lifting tube is slidably arranged inside the first lifting tube, and one end of the second lifting tube away from the first lifting tube is connected to the second base.
[0009] Furthermore, the leveling assembly includes an adjusting ball, which is arranged between the second base and the third base so that the angle of the third base can be adjusted relative to the second base.
[0010] Furthermore, it also includes a connecting seat, which is arranged on the second base, and an adjusting ball is arranged on the second base, and the adjusting ball is hinged to the third base.
[0011] Furthermore, the adjusting ball is arranged in the middle part of the second base.
[0012] Furthermore, the leveling assembly further includes a plurality of adjustment rods, which are respectively arranged around the adjustment ball between the second base and the third base.
[0013] Furthermore, the adjusting rod includes a first threaded rod, a second threaded rod and an adjusting piece. The first threaded rod is arranged on the second base, and the second threaded rod is arranged on the third base. One end of the adjusting piece is connected to the first threaded rod, and the other end of the adjusting piece is connected to the second threaded rod. By rotating the adjusting piece, the first threaded rod and the second threaded rod move away from or approach each other, so that the angle of the third base can be adjusted relative to the second base.
[0014] Furthermore, a sliding rod is provided on a surface of the third base away from the second base, a sliding seat is provided on the sliding rod, a clamping assembly is provided on the sliding seat, and the clamping assembly is used to clamp the electromagnetic flowmeter.
[0015] Furthermore, the sliding seat includes a first sliding seat and a second sliding seat, both of which are slidably set on the sliding rod, the clamping assembly includes a first clamping member and a second clamping member, the first clamping member is set on the first sliding seat, and the second clamping member is set on the second sliding seat, and the electromagnetic flowmeter is clamped between the first clamping member and the second clamping member.
[0016] Furthermore, it also includes a buffer component, which is arranged between the first base and the second base, and is used to buffer the second base.
[0017] The electromagnetic flowmeter of the utility model which is easy to install has the following advantages:
[0018] A lifting component is arranged on the first base, a second base is arranged on a side of the lifting component away from the first base, a leveling component is arranged on the second base, a third base is arranged on a side of the leveling component away from the second base, a clamping component is slidably arranged on the third base, and the clamping component is used to clamp the electromagnetic flowmeter. When installing the electromagnetic flowmeter, the height of the electromagnetic flowmeter can be adjusted through the lifting component to adapt to installation requirements at different heights, and the angle of the electromagnetic flowmeter can be leveled through the leveling component. The operation is simple, the installation is convenient, the practicability is strong, and the installation efficiency of the electromagnetic flowmeter is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The structure of the electromagnetic flowmeter that is easy to install is shown in the following figure Figure 1 ;
[0020] Figure 2 The structure of the electromagnetic flowmeter that is easy to install is shown in the following figure Figure 2 ;
[0021] Figure 3 The structure of the electromagnetic flowmeter that is easy to install is shown in the following figure Figure 3 ;
[0022] Figure 4 It is a schematic diagram of the cross-sectional structure of the adjusting rod of the utility model;
[0023] Figure 5 It is a schematic diagram of the cross-sectional structure of the buffer component of the utility model.
[0024] Description of the markings in the figure:
[0025] 100. Electromagnetic flowmeter; 1. First base; 2. Second base; 3. Third base; 4. Lifting assembly; 41. First lifting tube; 42. Second lifting tube; 5. Leveling assembly; 51. Adjusting ball; 52. Connecting seat; 53. Adjusting rod; 531. First threaded rod; 532. Second threaded rod; 533. Adjusting member; 6. Sliding rod; 7. Sliding seat; 71. First sliding seat; 72. Second sliding seat; 8. Clamping assembly; 81. First clamping member; 82. Second clamping member; 9. Buffering assembly; 91. Sleeve; 92. Buffering rod; 93. Spring. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0027] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.
[0028] Please refer to the attached Figure 1 To Attachment Figure 5 The utility model describes an electromagnetic flowmeter which is easy to install.
[0029] like Figures 1 to 3As shown, the electromagnetic flowmeter that is easy to install in the utility model includes a first base 1, a lifting assembly 4 is arranged on the first base 1, a second base 2 is arranged on the side of the lifting assembly 4 away from the first base 1, a leveling assembly 5 is arranged on the second base 2, a third base 3 is arranged on the side of the leveling assembly 5 away from the second base 2, a clamping assembly 8 is slidably arranged on the third base 3, and the clamping assembly 8 is used to clamp the electromagnetic flowmeter 100.
[0030] A lifting component 4 is arranged on the first base 1, a second base 2 is arranged on a side of the lifting component 4 away from the first base 1, a leveling component 5 is arranged on the second base 2, a third base 3 is arranged on a side of the leveling component 5 away from the second base 2, a clamping component 8 is slidably arranged on the third base 3, the clamping component 8 is used to clamp the electromagnetic flowmeter 100, when installing the electromagnetic flowmeter 100, the height of the electromagnetic flowmeter 100 can be adjusted by the lifting component 4 to adapt to installation requirements at different heights, and the angle of the electromagnetic flowmeter 100 can be leveled by the leveling component 5, the operation is simple, the installation is convenient, the practicability is strong, and the installation efficiency of the electromagnetic flowmeter 100 is improved.
[0031] Further, if Figures 1 to 3 As shown, the lifting assembly 4 includes a first lifting tube 41, one end of the first lifting tube 41 is fixedly arranged on the first base 1, a second lifting tube 42 is slidably arranged in the first lifting tube 41, and one end of the second lifting tube 42 away from the first lifting tube 41 is connected to the second base 2. By setting the lifting assembly 4, the height of the electromagnetic flowmeter 100 can be adjusted to meet different installation height requirements. In this embodiment, the lifting assembly 4 can be a lifting cylinder, a push rod or other lifting structures, as long as it can achieve the lifting of the electromagnetic flowmeter 100 to different heights.
[0032] Further, if Figures 1 to 3 As shown, during the installation of the electromagnetic flowmeter 100, due to different placement positions or installation conditions, it is necessary to level or adjust the angle of the electromagnetic flowmeter 100. Therefore, a leveling component 5 is also provided in this embodiment, and the leveling component 5 includes an adjusting ball 51, and the adjusting ball 51 is arranged between the second base 2 and the third base 3, so that the third base 3 can adjust the angle relative to the second base 2. In order to facilitate the fixing of the adjusting ball 51 on the second base 2, the electromagnetic flowmeter that is easy to install in the utility model also includes a connecting seat 52, and the connecting seat 52 is arranged on the second base 2, and the adjusting ball 51 is arranged on the second base 2, and the adjusting ball 51 is hinged to the third base 3. In other embodiments, the adjusting ball 51 can also be fixed on the third base 3, and the adjusting ball 51 is hinged to the second base 2. In this embodiment, the adjusting ball 51 is arranged in the middle part of the second base 2, which is convenient for realizing the angle leveling of the electromagnetic flowmeter 100.
[0033] Further, if Figures 1 to 3 As shown, the leveling assembly 5 further includes a plurality of adjustment rods 53, which are respectively arranged around the adjustment ball 51 between the second base 2 and the third base 3. When the angle of the electromagnetic flowmeter 100 needs to be adjusted, the height of one adjustment rod 53 or the heights of two or more of the adjustment rods 53 can be adjusted according to the situation to adjust the angle of the electromagnetic flowmeter 100 to adapt to different installation environments.
[0034] Specifically, Figure 4 As shown, the adjusting rod 53 includes a first threaded rod 531, a second threaded rod 532 and an adjusting member 533. The first threaded rod 531 is arranged on the second base 2, and the second threaded rod 532 is arranged on the third base 3. One end of the adjusting member 533 is connected to the first threaded rod 531, and the other end of the adjusting member 533 is connected to the second threaded rod 532. By rotating the adjusting member 533, the first threaded rod 531 and the second threaded rod 532 are moved away from or approached to each other, so that the angle of the third base 3 is adjusted relative to the second base 2. In this embodiment, the thread directions of the first threaded rod 531 and the second threaded rod 532 are opposite, and a thread is also arranged in the adjusting member 533, so that when the adjusting member 533 is rotated, the first threaded rod 531 and the second threaded rod 532 can be adjusted to move closer to or away from each other, and at the same time, the angle of the electromagnetic flowmeter 100 is adjusted with the adjusting ball 51 as the adjustment base point.
[0035] Further, if Figures 1 to 3 As shown, a sliding rod 6 is provided on the side of the third base 3 away from the second base 2, a sliding seat 7 is provided on the sliding rod 6, a clamping assembly 8 is provided on the sliding seat 7, and the clamping assembly 8 is used to clamp the electromagnetic flowmeter 100. The sliding seat 7 includes a first sliding seat 71 and a second sliding seat 72, both of which are slidably provided on the sliding rod 6, and the clamping assembly 8 includes a first clamping member 81 and a second clamping member 82, the first clamping member 81 is provided on the first sliding seat 71, and the second clamping member 82 is provided on the second sliding seat 72, and the electromagnetic flowmeter 100 is clamped between the first clamping member 81 and the second clamping member 82. The first sliding seat 71 and the second sliding seat 72 are moved away from or close to each other, thereby making the first clamping member 81 and the second clamping member 82 move away from or close to each other, so as to facilitate clamping different electromagnetic flowmeters 100.
[0036] Further, if Figures 1 to 5As shown, the electromagnetic flowmeter easy to install in the utility model also includes a buffer assembly 9, which is arranged between the first base 1 and the second base 2, and the buffer assembly 9 is used to buffer the second base 2. Specifically, the buffer assembly 9 includes a sleeve 91, a buffer rod 92 and a spring 93, the sleeve 91 is arranged on the first base 1, the buffer rod 92 is slidably arranged in the sleeve 91, the end of the buffer rod 92 away from the sleeve 91 is connected to the second base 2, the spring 93 is arranged in the sleeve 91, one end of the spring 93 abuts against the bottom wall of the sleeve 91, and the other end of the spring 93 is connected to the end of the buffer rod 92 close to the sleeve 91. The spring 93 plays a buffering role on the buffer rod 92, so that when the second base 2 is raised and lowered relative to the first base 1, the second base 2 can be raised and lowered smoothly.
[0037] The installation distance of the electromagnetic flowmeter which is easy to install in the utility model is as follows:
[0038] The electromagnetic flowmeter 100 to be installed is clamped between the first clamping member 81 and the second clamping member 82 by relative movement of the first sliding seat 71 and the second sliding seat 72, and the second lifting tube 42 moves relative to the first lifting tube 41 to adjust the height of the electromagnetic flowmeter 100 in the vertical direction, so that the electromagnetic flowmeter 100 rises to the height of the docking pipe, and then the first threaded rod 531 and the second threaded rod 532 are moved closer to or farther from each other by adjusting the adjusting member 533, so as to adjust the adjusting ball 51 as the base point, thereby realizing the angle adjustment of the electromagnetic flowmeter 100.
[0039] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the claims of the present invention.
Claims
1. An electromagnetic flowmeter that is easy to install, characterized in that: It includes a first base, a lifting assembly is arranged on the first base, a second base is arranged on the side of the lifting assembly away from the first base, a leveling assembly is arranged on the second base, a third base is arranged on the side of the leveling assembly away from the second base, a clamping assembly is slidably arranged on the third base, and the clamping assembly is used to clamp the electromagnetic flowmeter.
2. The electromagnetic flowmeter that is easy to install according to claim 1, characterized in that: The lifting assembly comprises a first lifting tube, one end of which is fixedly arranged on the first base, a second lifting tube is slidably arranged inside the first lifting tube, and one end of the second lifting tube away from the first lifting tube is connected to the second base.
3. The electromagnetic flowmeter that is easy to install according to claim 1, characterized in that: The leveling assembly comprises an adjusting ball, which is arranged between the second base and the third base so as to adjust the angle of the third base relative to the second base.
4. The electromagnetic flowmeter that is easy to install according to claim 3, characterized in that: It also includes a connecting seat, which is arranged on the second base, and an adjusting ball is arranged on the second base, and the adjusting ball is hinged to the third base.
5. The electromagnetic flowmeter that is easy to install according to claim 3, characterized in that: The adjusting ball is arranged in the middle part of the second base.
6. The electromagnetic flowmeter that is easy to install according to claim 3, characterized in that: The leveling assembly also includes a plurality of adjustment rods, which are respectively arranged around the adjustment balls between the second base and the third base.
7. The electromagnetic flowmeter that is easy to install according to claim 6, characterized in that: The adjusting rod includes a first threaded rod, a second threaded rod and an adjusting piece. The first threaded rod is arranged on the second base, the second threaded rod is arranged on the third base, one end of the adjusting piece is connected to the first threaded rod, and the other end of the adjusting piece is connected to the second threaded rod. By rotating the adjusting piece, the first threaded rod and the second threaded rod move away from or approach each other.
8. The electromagnetic flowmeter that is easy to install according to claim 1, characterized in that: A sliding rod is arranged on a surface of the third base away from the second base, a sliding seat is arranged on the sliding rod, and the clamping assembly is arranged on the sliding seat.
9. The electromagnetic flowmeter that is easy to install according to claim 8, characterized in that: The sliding seat includes a first sliding seat and a second sliding seat, both of which are slidably arranged on the sliding rod, the clamping assembly includes a first clamping member and a second clamping member, the first clamping member is arranged on the first sliding seat, the second clamping member is arranged on the second sliding seat, and the electromagnetic flowmeter is clamped between the first clamping member and the second clamping member.
10. The electromagnetic flowmeter that is easy to install according to claim 1, characterized in that: It also includes a buffer component, which is arranged between the first base and the second base and is used to buffer the second base.