Gate machine for construction site
By setting up a ring array of 90-degree baffles and servo motors on the construction site gate, the problem that the gate cannot effectively block personnel is solved, and the continuity of the gate and the characteristics of easy installation and disassembly are improved.
Patent Information
- Application Number
- CN202420808191.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-04-18
AI Technical Summary
The existing construction site gate cannot effectively block personnel after opening, resulting in outsiders slipping into the construction site, and every time people enter and exit, they need to reset and register, resulting in poor continuity of the gate work.
A gate consisting of two control frames and positioning plates symmetrically arranged, by installing a ring array of ninety-degree baffles and servo motors between the control frames, the personnel identify the backboard rotation through the card to avoid blocking. Outsiders enter and keep the control frame fixed by positioning plates and bolts, simplifying installation and removal.
It realizes preventing outsiders from entering when the gate is not closed, improves the continuity of personnel passage, reduces the need for resetting and registration, and facilitates the disassembly and transportation of the gate.
Smart Images

Figure CN222161019U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of gate machines, and in particular, to a gate machine for a construction site. Background Art
[0002] The gate is a channel blocking device, which is often installed at the entrances and exits of shopping malls, residential areas, toll booths and other places to manage the vehicles or pedestrians entering and leaving. In the existing gate device, the barrier rod device on the gate is usually fixed above the gate and the height is fixed. When the barrier rod is closed, its firmness is usually low, and there are gaps between the barrier rods, which makes the gate device unable to effectively manage the entry and exit of personnel.
[0003] The patent with application number 202121677483.0 discloses a barrier gate device for construction sites, including a gate machine, a rotating baffle and a camera. A camera is provided above the gate machine, and the camera is connected to the top of the gate machine through a bracket. A display screen is provided on the side surface of the gate machine. The display screen and the camera are connected to the controller inside the gate machine through a signal line. A base is connected between the gate machines, and a rotating baffle is installed in the base. The rotating baffle is rotated and raised through a transmission structure; it effectively prevents outsiders from entering the construction site and ensures the safety of the site. At the same time, it standardizes the work vehicles entering the construction site, reduces the management difficulty, and is conducive to reducing safety hazards during the construction process.
[0004] In the above structure, since the gate cannot block subsequent personnel after it is opened, outsiders can still sneak into the construction site when the gate is not closed, and the gate needs to be reset each time after opening. When there are many people entering and leaving, it needs to be reset and the personnel information needs to be registered after each entry, resulting in poor continuity of the gate operation. Utility Model Content
[0005] The content of this application is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this application is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.
[0006] In order to solve the technical problems mentioned in the above background technology part, some embodiments of the present application provide a construction site gate, including: two symmetrically arranged control frames and a positioning plate fixed between the two control frames; a through groove is opened at the center position of the two positioning plates, and a support part and a motor mounting box are respectively fixed on both sides of the side faces of the two positioning plates, a rotating shaft is rotatably arranged between the supporting part and the motor mounting box, and the outer wall of the rotating shaft is installed with a plurality of baffles with a gap of ninety degrees in a circular array.
[0007] By installing a rotating shaft on the side walls of the two control frames, and installing multiple baffles with a gap of 90 degrees on the outer wall of the rotating shaft in a circular array, when the baffle blocks the gap between the two control frames, the other baffles will not affect the walking space between the two control frames. After the personnel are scanned by the card identifier, the servo motors arranged in the two motor mounting boxes respectively drive the two rotating shafts to rotate 90 degrees towards each other, so that the personnel pass through along the rotation of the baffle, and while passing through, the other baffle blocks the gap between the two control frames, preventing outsiders from sneaking into the construction site when the gate is not closed, and there is no need to reset after the personnel enter, thereby improving the continuity of the gate personnel passing through; by providing a positioning plate between the two control frames, a first screw hole is opened at both ends of the positioning plate, and the first bolt in the through groove passes through the through hole and is threadedly inserted into the first screw hole, so that the two controllers are kept fixed, and the first screw hole with a constant position makes the installation spacing of the two control frames the same each time, and after unscrewing the first bolt, it is convenient to disassemble and transport the gate after construction.
[0008] Furthermore, card identifiers are embedded in both ends of the control frame, and protective covers are fixed on the opposite sides of the two control frames.
[0009] Furthermore, both ends of the plurality of baffles are fixed with mounting rings, and the mounting rings are fixedly sleeved on the rotating shaft.
[0010] Furthermore, positioning grooves are provided on both sides of the top surfaces of the two control frames, the positioning plate is in a T-shaped structure, and both ends of the positioning plate are fitted and inserted in the positioning grooves.
[0011] Furthermore, second screw holes are provided at both ends of the positioning plate, and a positioning cover is sleeved on the positioning plate, and second bolts threadedly inserted into the second screw holes are installed on both sides of the top end surface of the positioning cover.
[0012] Furthermore, through holes communicating with the positioning grooves are provided on both sides of the inner wall of the through groove, and first bolts are embedded in the through holes.
[0013] Furthermore, first screw holes are provided at both ends of the positioning plate, and the bottom end of the first bolt extends into the positioning groove and is threadedly inserted into the first screw hole.
[0014] The beneficial effects of the present application are: 1. A rotating shaft is installed on the side walls of the two control frames, and a plurality of baffles with a gap of 90 degrees are installed in a circular array on the outer wall of the rotating shaft. When the baffle blocks the gap between the two control frames, the other baffles will not affect the walking space between the two control frames. After the personnel are scanned by the card reader, the servo motors arranged in the two motor mounting boxes respectively drive the two rotating shafts to rotate 90 degrees towards each other, so that the personnel pass through along the rotation of the baffle, and at the same time, another baffle blocks the gap between the two control frames, thereby preventing outsiders from sneaking into the construction site when the gate is not closed, and there is no need to reset the personnel after entering, thereby improving the continuity of the gate personnel passing.
[0015] 2. A positioning plate is arranged between the two control frames, and first screw holes are opened at both ends of the positioning plate. The first bolt in the through slot passes through the through hole and is threadedly inserted into the first screw hole, so that the two controllers are kept fixed. The first screw hole with a constant position makes the installation spacing of the two control frames the same each time, and after unscrewing the first bolt, it is convenient to disassemble and transport the gate machine after construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The illustrative embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application.
[0017] In addition, throughout the drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that the components and elements are not necessarily drawn to scale.
[0018] In the attached picture:
[0019] Figure 1 is an overall schematic diagram according to the present application;
[0020] Figure 2 This application Figure 1 A schematic diagram of the structure enlargement in the middle;
[0021] Figure 3 It is a schematic diagram of the control frame structure of the present application;
[0022] Figure 4 It is a schematic diagram of the positioning plate structure of the present application.
[0023] Reference numerals:
[0024] 1. Control frame; 2. Baffle; 3. Positioning cover; 4. Protective cover; 5. Card identifier; 6. Support part; 7. Mounting ring; 8. Rotating shaft; 9. Motor mounting box; 10. Through hole; 11. Through slot; 12. First bolt; 13. Positioning plate; 14. Positioning slot; 15. Second bolt; 16. Second screw hole; 17. First screw hole. DETAILED DESCRIPTION
[0025] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.
[0026] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.
[0027] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0028] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0029] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0030] Reference Figure 1, a construction site gate machine comprises: two symmetrically arranged control frames 1 and a positioning plate 13 fixed between the two control frames 1; a through slot 11 is opened at the center position of the two positioning plates 13, and a support part 6 and a motor mounting box 9 are respectively fixed on both sides of the side surfaces facing each other of the two positioning plates 13, a rotating shaft 8 is rotatably arranged between the supporting part 6 and the motor mounting box 9, and the outer wall of the rotating shaft 8 is provided with a plurality of baffles 2 with a gap of 90 degrees in a circular array. When the baffle 2 blocks the gap between the two control frames 1, the other baffles 2 will not affect the walking space between the two control frames 1. After the personnel are scanned by the card identifier 5, the servo motors arranged in the two motor mounting boxes 9 respectively drive the two rotating shafts 8 to rotate 90 degrees towards each other, so that the personnel pass through along the rotation of the baffle 2, and at the same time, the other baffle 2 blocks the gap between the two control frames 1, preventing outsiders from slipping into the construction site when the gate machine is not closed, and there is no need to reset after the personnel enter.
[0031] Reference Figure 1 and Figure 2 Card identifiers 5 are embedded at both ends of the control frame 1, and protective covers 4 are fixed on the opposite sides of the two control frames 1. The protective covers 4 shield and protect the baffles 2 on the side walls of the control frame 1, thereby preventing the baffles 2 from being affected by foreign objects at the construction site during rotation. Mounting rings 7 are fixed at both ends of the multiple baffles 2, and the mounting rings 7 are fixedly sleeved on the rotating shaft 8. The mounting rings 7 keep the multiple baffles 2 axially fixed on the rotating shaft 8.
[0032] Reference Figure 3 and Figure 4 , positioning grooves 14 are provided on both sides of the top surfaces of the two control frames 1, the positioning plate 13 is in a T-shaped structure, and both ends of the positioning plate 13 are fitted and inserted in the positioning grooves 14, and second screw holes 16 are provided on both ends of the positioning plate 13, and a positioning cover 3 is sleeved on the positioning plate 13, and second bolts 15 threadedly inserted in the second screw holes 16 are installed on both sides of the top surface of the positioning cover 3. The second bolts 15 keep the positioning cover 3 fixed on the top of the positioning plate 13 and protect the top of the positioning plate 13. At the same time, the positioning cover 3 with an arc structure can also play the role of a speed bump, and the through groove 1 Both sides of the inner wall of the positioning plate 13 are provided with through holes 10 connected to the positioning groove 14, and the first bolts 12 are embedded in the through holes 10. Both ends of the positioning plate 13 are provided with first screw holes 17. The bottom end of the first bolt 12 extends into the positioning groove 14 and is threadedly inserted into the first screw hole 17. The first bolt 12 in the through groove 11 passes through the through hole 10 and is threadedly inserted into the first screw hole 17, so that the two controllers are fixed. The first screw hole 17 with a constant position makes the installation spacing of the two control frames 1 the same each time, and after the first bolt 12 is unscrewed, it is convenient to disassemble and transport the gate after construction.
[0033] Working principle: A plurality of baffles 2 with a gap of ninety degrees are installed in a circular array on the outer wall of the rotating shaft 8. When the baffle 2 blocks the gap between the two control frames 1, the other baffles 2 will not affect the walking space between the two control frames 1. After the personnel are scanned by the card identifier 5, the servo motors arranged in the two motor mounting boxes 9 respectively drive the two rotating shafts 8 to rotate ninety degrees towards each other, so that the personnel pass through along the rotation of the baffle 2, and at the same time, another baffle 2 blocks the gap between the two control frames 1, preventing outsiders from sneaking into the construction site when the gate is not closed, and there is no need to reset the gate after the personnel enter, thereby improving the continuity of the personnel passing through the gate.
[0034] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.
Claims
1. A construction site gate, include: Two symmetrically arranged control frames (1) and a positioning plate (13) fixed between the two control frames (1); characterized in that: a through slot (11) is provided at the center position of the two positioning plates (13), and a support portion (6) and a motor mounting box (9) are fixed on both sides of the side surfaces facing each other of the two positioning plates (13), a rotating shaft (8) is rotatably arranged between the supporting portion (6) and the motor mounting box (9), and the outer wall of the rotating shaft (8) is provided with a plurality of baffles (2) with a gap of ninety degrees in a circular array.
2. The construction site gate according to claim 1, Features: Both ends of the control frame (1) are embedded with a card identifier (5), and protective covers (4) are fixed to the opposite sides of the two control frames (1).
3. The construction site gate according to claim 1, Features: Both ends of the plurality of baffles (2) are fixed with mounting rings (7), and the mounting rings (7) are fixedly sleeved on the rotating shaft (8).
4. The construction site gate according to claim 1, Features: Positioning grooves (14) are provided on both sides of the top surfaces of the two control frames (1); the positioning plate (13) is in a T-shaped structure, and both ends of the positioning plate (13) are fitted and inserted into the positioning grooves (14).
5. The construction site gate according to claim 4, Features: The two ends of the positioning plate (13) are provided with second screw holes (16), and a positioning cover (3) is sleeved on the positioning plate (13). Second bolts (15) threadedly inserted into the second screw holes (16) are installed on both sides of the top surface of the positioning cover (3).
6. The construction site gate according to claim 5, Features: Through holes (10) connected to the positioning groove (14) are provided on both sides of the inner wall of the through groove (11), and a first bolt (12) is embedded in the through hole (10).
7. The construction site gate according to claim 6, Features: Both ends of the positioning plate (13) are provided with first screw holes (17), and the bottom end of the first bolt (12) extends into the positioning groove (14) and is threadedly inserted into the first screw hole (17).