By fixing the support components with threaded sleeves and bolt rods, setting up scaffolding and netting components, the problems of low construction efficiency and poor flexibility of traditional anti-fall devices are solved, rapid installation and disassembly and flexible arrangement are achieved, and construction safety and efficiency are improved. , reduces costs.
Patent Information
- Application Number
- CN202420297266.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-02-19
AI Technical Summary
The anti-fall device for traditional water conservancy dams has low construction efficiency and poor flexibility, which leads to safety hazards and high costs during the construction of the side wall of the dam.
Threaded sleeves and bolt rods are used to fix the support assembly on the side wall of the dam body, and scaffolding and netting components are equipped to provide quick installation and disassembly and flexible arrangement of anti-fall devices, including angle iron structures, wire grating panels and stainless steel wire rope braids Prevent the net from falling to ensure the safety of workers.
It significantly improves construction efficiency and flexibility, reduces installation and dismantling time, reduces labor and material use, reduces costs, and enhances construction safety.
Smart Images

Figure CN222161130U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy dam safety protection, in particular to an anti-falling device for water conservancy dam construction. Background Art
[0002] During the construction of a hydropower dam, the width of the dam is relatively small, and a large amount of work needs to be done on the side wall edges on both sides of the dam. If the protective measures during the construction phase are not perfect, construction workers may easily fall in the construction area if they are not careful. The falling workers themselves are very likely to suffer serious injuries. In addition, falling objects are prone to occur in the construction area, which poses a certain safety hazard to the construction workers at the bottom of the dam. Therefore, it is necessary to set up anti-fall protection devices for hydropower dam construction to protect workers and prevent them from being injured.
[0003] The traditional construction method is to embed steel pipes during the dam construction process, connect the crossbars and columns with special scaffolding fasteners, and then set up anti-fall devices. The use of scaffolding consumes a lot of materials and labor, and the cost is high. However, this method still has the following problems: the anti-fall device needs to be installed and removed many times as the construction progresses, and the use of scaffolding has low construction efficiency and poor flexibility.
[0004] In view of this, how to change the current situation of low construction efficiency and poor flexibility of traditional anti-fall devices has become a technical problem that technical personnel in this field urgently need to solve. Utility Model Content
[0005] In order to overcome the above-mentioned shortcomings, the utility model aims to provide an anti-falling device for water conservancy dam construction, so as to improve the current situation of low construction efficiency and poor flexibility of traditional anti-falling devices.
[0006] In order to achieve the above-mentioned purpose, the technical solution of the utility model is: a fall prevention device for water conservancy dam construction, comprising:
[0007] Threaded sleeves, multiple groups of threaded sleeves arranged at intervals are used to be embedded in the side wall of the dam body, and the threaded sleeves in the same group are arranged vertically at equal intervals;
[0008] Bolt rods are arranged one-to-one corresponding to the threaded sleeves, and the bolt rods penetrate the support assembly and are connected to the threaded sleeves;
[0009] A scaffolding board is laid on the supporting assembly, and a protective assembly is provided on the side of the scaffolding board facing the air to prevent people from falling; and
[0010] The net bag component is arranged below the support component, and the width of the net bag component is greater than the width of the support component.
[0011] Furthermore, the support assembly includes an angle iron cross brace, an angle iron vertical column and a reinforcing angle iron, one end of the angle iron cross brace is fixedly connected to the angle iron vertical column, the scaffolding board is laid above the angle iron cross brace, the angle iron vertical column is connected to a plurality of bolt rods, the reinforcing angle iron is arranged obliquely, one end of the reinforcing angle iron is fixedly connected to the angle iron cross brace, and the other end of the reinforcing angle iron is fixedly connected to the angle iron vertical column.
[0012] Furthermore, the protection component includes:
[0013] The columns are arranged one by one with the angle iron cross braces, the lower ends of the columns are fixedly connected to the other ends of the angle iron cross braces, and the side walls of the columns are symmetrically provided with a plurality of connecting ears;
[0014] A panel, the panel is arranged between two adjacent columns, and the panel and the connecting ears are detachably connected by connecting bolts;
[0015] A skirting board is connected to the lower end of the panel, and the height of the skirting board is not less than 15 cm.
[0016] Furthermore, the net assembly includes horizontal cross braces, hooks and anti-fall nets, one ends of the multiple horizontal cross braces are arranged one-to-one corresponding to the angle iron vertical columns, one end of the horizontal cross braces is fixedly connected to the lower end of the angle iron vertical column, and multiple hooks are arranged at intervals on the upper surface of the horizontal cross braces, and the hooks are connected to the anti-fall net in a lockable manner.
[0017] Furthermore, the hook includes a threaded buckle and a clamping block, one end of the threaded buckle is fixedly connected to the upper surface of the horizontal cross brace, and the other end of the threaded buckle is threadedly connected to the clamping block.
[0018] Furthermore, the panel is a steel wire grid plate.
[0019] Furthermore, the anti-fall net is a safety net woven from stainless steel wire ropes.
[0020] Compared with the prior art, the utility model has at least the following advantages: compared with the traditional construction method of erecting scaffolding through special fasteners, the utility model fixes the support assembly on the side wall of the dam body through the cooperation of threaded sleeves and bolt rods, and has fast installation and disassembly speed, convenient turnover, strong applicability, high construction efficiency and flexible layout. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0022] Figure 1 It is a schematic diagram of the overall structure of the utility model anti-fall device for water conservancy dam construction;
[0023] Figure 2 For this utility model Figure 1 A partial enlarged view of the middle A area;
[0024] Figure 3 This is a schematic diagram of the structure of the support assembly in the anti-fall device for water conservancy dam construction of the utility model;
[0025] Figure 4 For this utility model Figure 3 A partial enlarged view of the middle B area;
[0026] Figure 5 It is a schematic diagram of the structure of the protection component in the anti-fall device for water conservancy dam construction of the utility model.
[0027] Figure numerals: 1. threaded sleeve; 2. bolt rod; 3. support assembly; 4. protection assembly; 5. net assembly; 6. scaffolding board; 7. dam body; 31. angle iron cross brace; 32. angle iron vertical column; 33. stiffening angle iron; 41. column; 42. panel; 43. skirting board; 44. connecting ear; 51. horizontal cross brace; 52. hook; 53. anti-fall net; 521. threaded buckle; 522. block. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0030] Reference Figure 1-2The utility model provides an anti-fall device for water conservancy dam construction, including a threaded sleeve 1, a bolt rod 2, a support assembly 3, a protection assembly 4 and a net assembly 5. Multiple groups of threaded sleeves 1 arranged at intervals are used to be embedded in the side wall of the dam body 7. The threaded sleeves 1 of the same group are arranged vertically at equal intervals. The intervals between threaded sleeves 1 of different groups are determined comprehensively according to the construction load and the site conditions. The threaded sleeve 1 is fixed together with the steel bars of the dam body 7 in advance during the construction of the dam body 7. After being firmly fixed, the barrel mouth of the threaded sleeve 1 should be blocked to prevent concrete from flowing into the threaded sleeve 1 during pouring, thereby affecting the connection between the second bolt rod 2 and the threaded sleeve 1.
[0031] A plurality of bolt rods 2 are arranged one by one corresponding to the threaded sleeve 1, and the bolt rods 2 penetrate the support assembly 3 and are connected to the threaded sleeve 1. The bolt connection construction is fast, especially when the anti-drop device of the water conservancy dam is frequently disassembled and turned over, the bolt rods 2 and the anti-drop device can be easily disassembled and reassembled, which can significantly improve the construction efficiency. Except for the threaded sleeve 1, the other components can be recycled many times, and the threaded sleeve 1 cannot be recycled but the cost is very low, which has good economic efficiency.
[0032] Reference Figure 3 The support assembly 3 includes an angle iron cross brace 31, an angle iron vertical column 32 and a stiffening angle iron 33. One end of the angle iron cross brace 31 is fixedly connected to the angle iron vertical column 32. The stiffening angle iron 33 is inclined. One end of the stiffening angle iron 33 is fixedly connected to the angle iron cross brace 31, and the other end of the stiffening angle iron 33 is fixedly connected to the angle iron vertical column 32. The support assembly 3 is triangular in shape as a whole and is made of angle iron, which has good compression resistance and bending resistance.
[0033] Reference Figure 1 and Figure 5 A scaffolding board 6 is laid above two adjacent angle iron cross braces 31 to provide a temporary operating platform for workers. A protective component 4 is provided on the side of the scaffolding board 6 facing the air to prevent people from falling. The protective component 4 includes a column 41, a panel 42 and a skirting board 43. Multiple columns 41 are arranged in a one-to-one correspondence with the angle iron cross braces 31. The lower end of the column 41 is fixedly connected to the other end of the angle iron cross brace 31. A plurality of connecting ears 44 are symmetrically provided on the side wall of the column 41. The panel 42 is arranged between two adjacent columns 41. The height of the panel 42 is not less than 1.2 meters. The panel 42 and the connecting ear 44 are detachably connected by connecting bolts. The skirting board 43 is connected to the lower end of the panel 42. The height of the skirting board 43 is not less than 15 centimeters.
[0034] Preferably, the panel 42 is a steel wire grating plate, which can not only meet the protection needs, but also reduce the deadweight of the structure and facilitate installation and disassembly.
[0035] The net assembly 5 is arranged below the support assembly 3, and the width of the net assembly 5 is greater than the width of the support assembly 3. The net assembly 5 includes a horizontal cross brace 51, a hook 52 and an anti-falling net 53. One end of a plurality of horizontal cross braces 51 is arranged one-to-one with the angle iron vertical column 32, one end of the horizontal cross brace 51 is fixedly connected to the lower end of the angle iron vertical column 32, and a plurality of hooks 52 are arranged at intervals on the upper surface of the horizontal cross brace 51, and the hooks 52 are connected to the anti-falling net 53 in a lockable manner.
[0036] Reference Figure 4 The hook 52 includes a threaded buckle 521 and a block 522. One end of the threaded buckle 521 is fixedly connected to the upper surface of the horizontal cross brace 51. The other end of the threaded buckle 521 is threadedly connected to the block 522. The block 522 can be rotated to move the block 522 closer to or farther from the upper surface of the horizontal cross brace 51, thereby hanging the anti-falling net 53. The anti-falling net 53 is preferably a safety net made of stainless steel wire rope, which has good flexibility, light weight, and can meet multiple turnover uses.
[0037] The working principle of the utility model is as follows: the angle iron column 32 is fixed on the side wall of the dam body 7 by matching the threaded sleeve 1 and the bolt rod 2, and the angle iron cross brace 31, the angle iron column 32 and the stiffening angle iron 33 are fixedly connected in sequence, which shortens the erection time and has the advantages of high construction efficiency and flexible layout. A panel 42 is installed on the air side to avoid the possibility of people falling, and an anti-fall net 53 is added to protect workers from falling.
[0038] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0039] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.
Claims
1. A fall prevention device for water conservancy dam construction, characterized in that: include: Threaded sleeves (1), wherein a plurality of groups of the threaded sleeves (1) are arranged at intervals and are used to be embedded in the side wall of the dam body (7), and the threaded sleeves (1) in the same group are arranged vertically at equal intervals; A bolt rod (2) is arranged in one-to-one correspondence with the threaded sleeve (1), and the bolt rod (2) penetrates the support assembly (3) and is connected to the threaded sleeve (1); A scaffolding board (6) is laid on the top of the supporting assembly (3), and a protective assembly (4) for preventing people from falling is provided on the side of the scaffolding board (6) facing the air; and A net bag component (5), wherein the net bag component (5) is arranged below the support component (3), and the width of the net bag component (5) is greater than the width of the support component (3).
2. The anti-fall device for water conservancy dam construction according to claim 1, characterized in that: The support assembly (3) comprises an angle iron cross brace (31), an angle iron vertical column (32) and a stiffening angle iron (33); one end of the angle iron cross brace (31) is fixedly connected to the angle iron vertical column (32); the scaffolding board (6) is laid above the angle iron cross brace (31); the angle iron vertical column (32) is connected to a plurality of bolt rods (2); the stiffening angle iron (33) is arranged obliquely; one end of the stiffening angle iron (33) is fixedly connected to the angle iron cross brace (31); and the other end of the stiffening angle iron (33) is fixedly connected to the angle iron vertical column (32).
3. The anti-fall device for water conservancy dam construction according to claim 2, characterized in that: The protection component (4) comprises: A column (41), wherein the column (41) and the angle iron cross brace (31) are arranged in a one-to-one correspondence, the lower end of the column (41) is fixedly connected to the other end of the angle iron cross brace (31), and the side wall of the column (41) is symmetrically provided with a plurality of connection ears (44); A panel (42), wherein the panel (42) is disposed between two adjacent columns (41), and the panel (42) and the connecting ears (44) are detachably connected via connecting bolts; and A skirting board (43), the skirting board (43) is connected to the lower end of the panel (42), and the height of the skirting board (43) is not less than 15 cm.
4. The anti-fall device for water conservancy dam construction according to claim 3, characterized in that: The net assembly (5) comprises a horizontal cross brace (51), a hook (52) and an anti-falling net (53); the horizontal cross brace (51) is arranged in one-to-one correspondence with the angle iron vertical column (32); one end of the horizontal cross brace (51) is fixedly connected to the lower end of the angle iron vertical column (32); a plurality of hooks (52) are arranged at intervals on the upper surface of the horizontal cross brace (51); and the hooks (52) are connected to the anti-falling net (53) in a lockable manner.
5. The anti-fall device for water conservancy dam construction according to claim 4, characterized in that: The hook (52) comprises a threaded buckle (521) and a clamping block (522); one end of the threaded buckle (521) is fixedly connected to the upper surface of the horizontal cross brace (51); and the other end of the threaded buckle (521) is threadedly connected to the clamping block (522).
6. The anti-fall device for water conservancy dam construction according to claim 5, characterized in that: The panel (42) is a steel wire grid plate.
7. The anti-fall device for water conservancy dam construction according to claim 6, characterized in that: The anti-falling net (53) is a safety net woven from stainless steel wire ropes.
Citation Information
Cited By
Anti-falling device for water conservancy dam construction
CN224244395U