Slurry replacement device for construction
By designing a mud replacement device including a base, telescopic support and a driving motor, the problem of low mud replacement efficiency in foundation pit construction is solved, rapid and effective mud replacement is achieved, and construction efficiency and quality are improved.
Patent Information
- Application Number
- CN202421418376.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-12-13
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During foundation pit construction, it is difficult to remove sand and mud clumps during the replacement of existing mud during the convection and mixing of new and old mud. The old mud pollutes new mud, and the replacement effect is poor and the speed is slow, and a large amount of new mud is required, resulting in low construction efficiency.
A mud replacement device including a base, telescopic support, grouting tube, swing rod, barrier film, central sliding sleeve and driving motor are designed. By driving the motor, the side arm and upper sliding sleeve are driven to rise to block the The membrane unfolds the original mud and quickly injects new mud to achieve mud replacement.
It improves the efficiency and effect of mud replacement, reduces the use of new mud, avoids old mud contamination of new mud, and significantly improves construction speed and quality.
Smart Images

Figure CN222161282U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a mud replacement device used for construction. Background Art
[0002] In engineering construction, foundation pits are very common facilities. In foundation pit construction, mud quality is very important. If its quality control is not good, it is easy to have problems such as pouring difficulties, hole collapse, and floating of steel cages. In severe cases, it will lead to broken piles, mud jams, and quality and safety accidents. The mud in the drilling process and the mud in concrete pouring have different functions and index parameters. Therefore, mud replacement is a necessary process when pouring underground concrete. Since mud must be used as a wall protection in the foundation pit to prevent hole collapse, the existing mud replacement process is to inject new mud with better indicators into the hole, and use a mud pump to extract the original mud from the hole. That is, the injection of new mud and the extraction of old mud in the foundation pit are carried out at the same time to replace the mud.
[0003] When replacing mud in the traditional way, the new and old muds will produce convection and mixing in the hole, and it is often difficult to replace sand and mud lumps. The old mud will contaminate the new mud, resulting in poor replacement effect. Moreover, a large amount of new mud needs to be injected to replace the old mud, and the speed is slow, which needs to be improved. Utility Model Content
[0004] The purpose of the utility model is to provide a mud replacement device for construction to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a mud replacement device for construction, comprising a base, a plurality of telescopic pillars are arranged on the base, the top of the telescopic pillars is connected to a top plate, a grouting pipe is arranged in the middle of the top plate, a plurality of rocker arms are arranged on the bottom side wall of the grouting pipe, a blocking film is arranged at the bottom of the rocker arm, a center sleeve is arranged above the rocker arm, the center sleeve is movably sleeved on the grouting pipe, a connecting rod is connected between the center sleeve and the rocker arm, a plurality of vertical poles are connected to the top of the vertical poles, an upper sleeve is connected to the top of the upper sleeve, the upper sleeve is movably sleeved on the grouting pipe, a side arm is arranged on the side wall of the upper sleeve, a driving motor is installed on the base, and a screw is connected to the output end of the driving motor.
[0006] Preferably, the base is used to be installed around a foundation pit, and the base is fixed to the ground on the side of the foundation pit by a plurality of fixing nails.
[0007] Preferably, the swing arm and the grouting pipe are hingedly connected, and the barrier membrane is a flexible structure and is fixed on the bottom surface of the swing arm.
[0008] Preferably, both ends of the connecting rod are movably connected to the rocker arm and the center sliding sleeve respectively.
[0009] Preferably, a collar is provided on the side arm, and the telescopic support passes through the collar.
[0010] Preferably, a threaded barrel is provided at the end of the side arm, the screw rod and the threaded barrel are cooperatively connected, the top of the screw rod is rotatably connected to a plate, and the plate and the edge of the base are connected through a support rod.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] The mud replacement device for construction proposed by the utility model, when replacing mud in the foundation pit, is first hoisted and installed above the foundation pit, and when the base is installed on the ground, due to the effect of gravity, the bottom of the grouting pipe will be directly inserted into the bottom of the foundation pit, at this time the swing arm is in a retracted state, and then the driving motor is started to drive the screw rod to rotate, so that the side arm drives the upper sliding sleeve, the vertical rod and the center sliding sleeve to rise, thereby making the connecting rod rise and making the swing arm swing outward, and the blocking membrane is unfolded to separate the original mud at the top, and then new mud is injected from the top of the grouting pipe, at this time the upper sliding sleeve is against the top plate, when the driving motor continues to start, the upper sliding sleeve pushes the top plate upward until the mud replacement is completed, the mud replacement effect of the device is good, the speed is faster, and it is beneficial to improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the structure of the utility model device.
[0014] Figure 2 This is a bottom structural diagram of the grouting pipe of the utility model.
[0015] In the figure: base 1, telescopic support 2, top plate 3, grouting pipe 4, swing rod 5, barrier membrane 6, center sliding sleeve 7, connecting rod 8, vertical rod 9, upper sliding sleeve 10, side arm 11, drive motor 12, screw rod 13. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0017] It should be noted that the construction involved in the present utility model application can be used for pile construction, and the foundation pit described in the present application mainly refers to the construction scope used for building piles. Of course, it can also be used in different projects. No limitation is made here, and all should be within the protection scope of the present application.
[0018] See also Figure 1 to Figure 2 The utility model provides a technical solution: a mud replacement device for construction, including a base 1, the base 1 is used to be installed around the foundation pit, and the base 1 is fixed to the ground on the side of the foundation pit by a number of fixing nails. A number of telescopic pillars 2 are arranged on the base 1, and the top of the telescopic pillars 2 is connected to a top plate 3. When not in use, under the action of gravity, the top plate 3 will compress the telescopic pillars 2 to the shortest state, and a grouting pipe 4 is arranged in the middle of the top plate 3. A number of swing rods 5 are arranged on the bottom side wall of the grouting pipe 4, and a blocking film 6 is arranged at the bottom of the swing rod 5. The swing rod 5 and the grouting pipe 4 are hingedly connected, and the blocking film 6 is a flexible structure and is fixed on the bottom surface of the swing rod 5.
[0019] A center sleeve 7 is arranged above the swing arm 5, and the center sleeve 7 is movably connected to the grouting pipe 4. A connecting rod 8 is connected between the center sleeve 7 and the swing arm 5. The two ends of the connecting rod 8 are movably connected to the swing arm 5 and the center sleeve 7 respectively. A plurality of vertical poles 9 are connected to the top of the center sleeve 7, and an upper sleeve 10 is connected to the top of the vertical pole 9. The upper sleeve 10 is movably connected to the grouting pipe 4. A side arm 11 is arranged on the side wall of the upper sleeve 10, and a ring is arranged on the side arm 11, and the telescopic support 2 passes through the ring. A driving motor 12 is installed on the base 1, and a screw rod 13 is connected to the output end of the driving motor 12. A threaded barrel is provided at the end of the side arm 11, and the screw rod 13 and the threaded barrel are connected in cooperation. The top of the screw rod 13 is rotatably connected to a plate, and the plate is connected to the edge of the base 1 through a support rod. When not in use, the driving motor 12 will move the side arm 11 to the bottom. At this time, the center sleeve 7 is located at the bottom, and the rocker arm 5 can be pushed downward by the connecting rod 8 to make it close together, and the blocking film 6 can be folded up for easy use next time.
[0020] In actual use, the device is first hoisted and installed above the foundation pit. When the base 1 is installed on the ground, due to the effect of gravity, the bottom of the grouting pipe 4 will be directly inserted into the bottom of the foundation pit. At this time, the swing arm 5 is in a retracted state, and then the driving motor 12 is started to drive the screw rod 13 to rotate, so that the side arm 11 drives the upper sleeve 10, the vertical rod 9 and the center sleeve 7 to rise, thereby making the connecting rod 8 rise and making the swing arm 5 swing outward, and the blocking membrane 6 is then unfolded to separate the original mud on the top, and then new mud is injected from the top of the grouting pipe 4. At this time, the upper sleeve 10 is against the top plate 3. When the driving motor 12 continues to start, the upper sleeve 10 pushes the top plate 3 upward until the mud replacement is completed. The mud replacement effect of this device is good and the speed is faster, which is conducive to improving construction efficiency.
[0021] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A mud replacement device for construction, comprising a base (1), characterized in that: The base is provided with a plurality of telescopic pillars (2), the top of the telescopic pillars is connected to a top plate (3), a grouting pipe (4) is provided in the middle of the top plate, a plurality of swing rods (5) are provided on the bottom side wall of the grouting pipe, a blocking film (6) is provided at the bottom of the swing rod, a central sliding sleeve (7) is provided above the swing rod, the central sliding sleeve is movably sleeved on the grouting pipe, a connecting rod (8) is connected between the central sliding sleeve and the swing rod, a plurality of vertical poles (9) are connected to the top of the vertical poles, an upper sliding sleeve (10) is connected to the top of the upper sliding sleeve, the upper sliding sleeve is movably sleeved on the grouting pipe, a side arm (11) is provided on the side wall of the upper sliding sleeve, a driving motor (12) is installed on the base, and a screw rod (13) is connected to the output end of the driving motor.
2. The mud replacement device for construction according to claim 1, characterized in that: The base is used to be installed around a foundation pit, and the base is fixed to the ground at the side of the foundation pit by a plurality of fixing nails.
3. The mud replacement device for construction according to claim 1, characterized in that: The swing rod and the grouting pipe are hingedly connected, and the barrier film is a flexible structure and is fixed on the bottom surface of the swing rod.
4. The mud replacement device for construction according to claim 1, characterized in that: The two ends of the connecting rod are movably connected to the swing rod and the central sliding sleeve respectively.
5. The mud replacement device for construction according to claim 1, characterized in that: The side arm is provided with a collar, and the telescopic support passes through the collar.
6. The mud replacement device for construction according to claim 1, characterized in that: The end of the side arm is provided with a threaded barrel, the screw rod and the threaded barrel are connected in cooperation, the top of the screw rod is rotatably connected to a plate, and the plate is connected to the edge of the base through a supporting rod.