Engineering cost settlement material management device

By introducing adjustment and limiting components into the engineering cost settlement material management device, the problem of fixed installation of the placing plate is solved, flexible space adjustment and stable storage of data are achieved, and the practicality and space utilization of the device are improved.

CN222171614UActive Publication Date: 2024-12-17SHANDONG YONGSHENG ENGINEERING MANAGEMENT CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420716217.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-12-17
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

In the existing engineering cost settlement material management device, the placement plate is fixedly installed inside the storage box, which is inconvenient to move and adjust, resulting in limited space for the threaded rod to move up and down, reducing the practicality of the device and the utilization of the interior space of the cabinet.

Method used

A device including an adjustment assembly and a limit assembly is designed, through the slidingly connected components such as a placement plate, a moving block, a mounting column, a T-handle, a rotary rod and a ball, the distance between the placement plates and provides a limit. Block, improve space utilization and data stability.

Benefits of technology

The position of the placing plate is adjusted according to the data height, which improves the utilization rate of the space in the cabinet and the stability of the data, reduces the pouring and confusion of the data, and improves the practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222171614U_ABST
    Figure CN222171614U_ABST
Patent Text Reader

Abstract

The utility model relates to a project cost settlement material management device which comprises a cabinet body, an adjusting assembly is installed on the cabinet body, a limiting assembly is installed on the cabinet body, the adjusting assembly comprises three placing plates which are slidably connected with the interior of the cabinet body, two moving blocks are fixedly installed on each of the two sides of each placing plate, and the moving blocks are movably installed on the cabinet body. The interior of the cabinet body is fixedly provided with two mounting columns, and the interior of the cabinet body is fixedly provided with two connecting plates. According to the engineering cost settlement material management device, by installing the adjusting assembly, the distance between the placing plates can be adjusted according to the height of stored data, the space in the cabinet is reasonably utilized, the data storage quality is improved, and the utilization rate of the space in the cabinet body is improved; and the placed data can be limited and blocked, so that the data are placed more stably, the situation that the data are toppled and confused is reduced, and the practicability of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering cost, in particular to an engineering cost settlement material management device. Background Art

[0002] Project cost refers to the estimated or actual construction expenses of a project during the construction period. The process of forecasting, planning, controlling, calculating, analyzing and evaluating the project cost by comprehensively applying knowledge and skills in management, economics and engineering technology is called project cost management. In the process of construction project management, a large number of paper materials such as drawings and reports need to be preserved for a long time. At present, there are certain defects in material management.

[0003] Please refer to announcement number CN219970421U, a material management device for construction cost settlement, including a storage box, a sealed cover door is provided on one side wall of the storage box, a plurality of placement plates are fixedly connected to the inner side wall of the storage box, a plurality of placement plates are provided with sliding grooves on one side wall, a plurality of sliding blocks are slidably connected in the plurality of sliding grooves... a connecting plate is fixedly connected to one side wall of the partition close to the adjusting groove, a threaded rod is threadedly connected to one side wall of the connecting plate; the utility model can flatten and fix the stored materials to prevent the stored materials from scattering in the cabinet, and can adjust the storage space according to the size of the materials.

[0004] In the above patent, the materials placed on the placement plate are pressed down and clamped by the cooperation of the threaded rod, the bearing and the pressure plate. However, the placement plate is fixedly installed inside the storage box, which is not convenient for movement and adjustment. The space for the threaded rod to move up and down is limited, which is not convenient for users to operate, thereby reducing the practicality of the device and the utilization rate of the internal space of the cabinet. This application proposes another technical solution to solve this technical problem. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a material management device for engineering cost settlement, which has advantages such as adjustable limit, and solves the problem that the placement plate is fixedly installed inside the storage box, which is not convenient for movement and adjustment, resulting in limited space for the threaded rod to move up and down, which is inconvenient for users to operate, thereby reducing the practicability of the device and reducing the utilization rate of the internal space of the cabinet.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a material management device for project cost settlement, comprising a cabinet, an adjustment component is installed on the cabinet, and a limit position component is installed on the cabinet;

[0007] The adjustment assembly includes three placement plates slidably connected to the interior of the cabinet, two moving blocks are fixedly installed on both sides of the placement plates, and two installation columns are fixedly installed inside the cabinet;

[0008] Two fixed blocks are fixedly installed at the bottom of the placement plate, and mounting frames are fixedly installed at the bottom of the two fixed blocks. T-shaped handles are slidably installed inside the two mounting frames, and bearings are fixedly installed on the opposite sides of the two T-shaped handles, and rotating rods are rotatably installed inside the two bearings.

[0009] Furthermore, the limiting assembly includes a baffle plate slidably connected to the top of the placement plate, a ball bearing is fixedly installed on the bottom of the baffle plate, a cross plate is fixedly installed on one side of the baffle plate, and a plug-in assembly is connected to the internal thread of the cross plate.

[0010] Furthermore, four slide bars are fixedly installed inside the cabinet, two mounting plates are fixedly installed inside the cabinet, and an annular sliding block is fixedly installed on the outer side of the bearing.

[0011] Furthermore, a moving hole is opened inside the mounting plate, and the moving block extends to the outside of the mounting plate through the moving hole, and the moving block is slidably connected to the sliding rod.

[0012] Furthermore, through holes are provided on the opposite sides of the three groups of mounting frames and the inside of the mounting plate, and a plurality of first threaded holes are provided on the opposite sides of the two mounting posts. Threads are engraved on the outer side of the rotating rod, and the rotating rod is threadedly connected to the mounting post through the through holes and the first threaded holes.

[0013] Furthermore, the three groups of installation frames have opposite sides each having an extension hole, and the T-shaped handle extends to the outside of the installation frame through the extension hole.

[0014] Furthermore, an annular sliding groove is provided inside the three groups of the installation frames, and the annular sliding block is slidably connected to the installation frame through the annular sliding groove.

[0015] Furthermore, a moving groove is provided on the top of the placing plate, and the ball bearing is slidably connected to the placing plate through the moving groove.

[0016] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0017] The engineering cost settlement material management device, by installing an adjustment component, can adjust the distance between each placement plate according to the height of the stored materials, reasonably utilize the space in the cabinet, improve the quality of material storage, and improve the utilization rate of the internal space of the cabinet. By installing a limited position component, it can provide a limited position barrier for the placed materials, so that the placement of the materials is more stable, reduce the possibility of dumping and confusion of the materials, and improve the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a cross-sectional view of the structure of the utility model;

[0019] Figure 2 For this utility model Figure 1 A magnified view of the structure in the middle;

[0020] Figure 3 For this utility model Figure 1 Middle B is an enlarged view of the structure;

[0021] Figure 4 This is a three-dimensional diagram of the installation frame structure of the utility model.

[0022] In the figure: 1. cabinet; 2. placement plate; 3. moving block; 4. mounting column; 5. annular slider; 6. fixing block; 7. mounting frame; 8. T-shaped handle; 9. bearing; 10. rotating rod; 11. baffle; 12. ball bearing; 13. cross plate; 14. plug-in assembly; 15. sliding rod; 16. mounting plate. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1-4 In this embodiment, a material management device for project cost settlement includes a cabinet 1, an adjustment component is installed on the cabinet 1, and a limit position component is installed on the cabinet 1.

[0025] The adjustment assembly includes three placement plates 2 slidably connected to the inside of the cabinet 1 , two moving blocks 3 are fixedly installed on both sides of the placement plates 2 , and two installation columns 4 are fixedly installed inside the cabinet 1 .

[0026] Two fixing blocks 6 are fixedly installed at the bottom of the placement plate 2, and a mounting frame 7 is fixedly installed at the bottom of the two fixing blocks 6. T-shaped handles 8 are slidably installed inside the two mounting frames 7. Extension holes are opened on the opposite sides of the three groups of mounting frames 7. The T-shaped handles 8 extend to the outside of the mounting frames 7 through the extension holes, so that the user can turn the T-shaped handles 8 conveniently. Bearings 9 are fixedly installed on the opposite sides of the two T-shaped handles 8.

[0027] A rotating rod 10 is rotatably installed inside the two bearings 9, through holes are provided on the opposite sides of the three groups of mounting frames 7 and the inside of the mounting plate 16, and a plurality of first threaded holes are provided on the opposite sides of the two mounting columns 4. Threads are engraved on the outer side of the rotating rod 10, and the rotating rod 10 is threadedly connected to the mounting column 4 through the through holes and the first threaded holes, so as to fix the adjusted placement plate 2.

[0028] It should be noted that the construction cost settlement material management device, by installing an adjustment component, can adjust the distance between each placement board 2 according to the height of the stored data, reasonably utilize the space in the cabinet, improve the quality of data storage, and improve the utilization rate of the internal space of the cabinet 1.

[0029] Specifically, when the distance between each placement plate 2 needs to be adjusted in the construction cost settlement material management device, the user rotates the two T-shaped handles 8, and drives the rotating rod 10 to rotate through the bearing 9, so that the rotating rod 10 releases the threaded connection with the mounting column 4, and moves the placement plate 2 to make the moving block 3 slide on the slide rod 15, and then adjusts the position of the placement plate 2 according to the size of the stored data. After the adjustment is completed, the two T-shaped handles 8 are rotated in the opposite direction, so that the rotating rod 10 is threadedly connected to the mounting column 4, and the adjusted placement plate 2 is limited and fixed, so as to reasonably use the space in the cabinet, improve the quality of data storage, and improve the internal space utilization rate of the cabinet body 1.

[0030] The limiting assembly includes a baffle 11 slidably connected to the top of the placement plate 2, a ball 12 is fixedly installed at the bottom of the baffle 11, a movable groove is opened on the top of the placement plate 2, and the ball 12 is slidably connected to the placement plate 2 through the movable groove.

[0031] A horizontal plate 13 is fixedly installed on one side of the baffle 11, and a plug-in assembly 14 is connected to the internal thread of the horizontal plate 13. The plug-in assembly 14 is composed of a screw, a rotating block, a limit plate, a bushing and a plug-in block. The plug-in assembly 14 is an existing technical means. The top of the placement plate 2 is provided with a number of plug-in holes for the rods, and the plug-in holes are distributed on both sides of the movable groove.

[0032] Four slide bars 15 are fixedly installed inside the cabinet 1, the mounting column 4 is located between two slide bars 15, the moving block 3 is slidably connected to the slide bars 15, and two mounting plates 16 are fixedly installed inside the cabinet 1. Moving holes are opened inside the mounting plates 16, and the moving blocks 3 extend to the outside of the mounting plates 16 through the moving holes to facilitate the sliding of the moving blocks 3 on the slide bars 15.

[0033] An annular slider 5 is fixedly installed on the outside of the bearing 9, and an annular groove is opened inside the three groups of mounting frames 7. The annular slider 5 is slidably connected to the mounting frame 7 through the annular groove, providing guidance for the movement of the bearing 9, making the rotating rod 10 more convenient to move.

[0034] It should be noted that the construction cost settlement material management device can provide limit blocks for the placed materials by installing limit components, making the placement of the materials more stable, reducing the chances of dumping and confusion of the materials, and improving the practicability of the device.

[0035] Specifically, when the engineering cost settlement material management device is used, the data is placed vertically on the placement plate 2, the connection between the plug-in component 14 and the placement plate 2 is released, and the baffle 11 is pushed to move on the placement plate 2 by the ball 12, so that the baffle 11 is close to the data to provide support for the placed data. After the adjustment is completed, the baffle 11 is fixed to the placement plate 2 by the plug-in component 14, so that the baffle 11 is fixed, thereby making the placement of the data more stable, reducing the possibility of data tipping over and confusion, and improving the practicality of the device.

[0036] The working principle of the above embodiment is:

[0037] (1) When the distance between the placement plates 2 needs to be adjusted in the construction cost settlement material management device, the user rotates the two T-shaped handles 8 to drive the rotating rod 10 to rotate through the bearing 9, thereby releasing the threaded connection between the rotating rod 10 and the mounting column 4, and moving the placement plate 2 to make the moving block 3 slide on the slide bar 15, thereby adjusting the position of the placement plate 2 according to the size of the stored data. After the adjustment is completed, the two T-shaped handles 8 are rotated in the opposite direction to make the rotating rod 10 threadedly connected to the mounting column 4, and the adjusted placement plate 2 is fixed in a limited position, so as to reasonably utilize the space in the cabinet, improve the quality of data storage, and improve the utilization rate of the internal space of the cabinet body 1.

[0038] (2) When the construction cost settlement material management device is used, the data is placed vertically on the placement plate 2, the connection between the plug-in component 14 and the placement plate 2 is released, and the baffle 11 is pushed to move on the placement plate 2 by the ball 12, so that the baffle 11 is close to the data to provide support for the placed data. After the adjustment is completed, the baffle 11 is fixed to the placement plate 2 by the plug-in component 14, so that the baffle 11 is fixed, thereby making the placement of the data more stable, reducing the possibility of the data being tipped over and confused, and improving the practicality of the device.

[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction cost settlement material management device, comprising a cabinet (1), characterized in that: An adjusting component is installed on the cabinet (1), and a limiting component is installed on the cabinet (1); The adjustment assembly comprises three placement plates (2) slidably connected to the interior of the cabinet (1), two moving blocks (3) are fixedly mounted on both sides of the placement plates (2), and two mounting columns (4) are fixedly mounted inside the cabinet (1); Two fixing blocks (6) are fixedly installed at the bottom of the placement plate (2), and a mounting frame (7) is fixedly installed at the bottom of each of the two fixing blocks (6). T-shaped handles (8) are slidably installed inside the two mounting frames (7), and bearings (9) are fixedly installed on opposite sides of the two T-shaped handles (8), and rotating rods (10) are rotatably installed inside the two bearings (9).

2. The construction cost settlement material management device according to claim 1, characterized in that: The limiting assembly comprises a baffle (11) slidably connected to the top of the placement plate (2), a ball bearing (12) is fixedly mounted on the bottom of the baffle (11), a transverse plate (13) is fixedly mounted on one side of the baffle (11), and a plug-in assembly (14) is connected to the internal thread of the transverse plate (13).

3. The construction cost settlement material management device according to claim 1, characterized in that: Four slide bars (15) are fixedly installed inside the cabinet (1), two mounting plates (16) are fixedly installed inside the cabinet (1), and an annular slider (5) is fixedly installed on the outside of the bearing (9).

4. The construction cost settlement material management device according to claim 3, characterized in that: A moving hole is provided inside the mounting plate (16), and the moving block (3) extends to the outside of the mounting plate (16) through the moving hole. The moving block (3) is slidably connected to the slide rod (15).

5. The construction cost settlement material management device according to claim 1, characterized in that: Through holes are provided on opposite sides of the three groups of mounting frames (7) and inside the mounting plate (16), and a plurality of first threaded holes are provided on opposite sides of the two mounting posts (4). The outer side of the rotating rod (10) is engraved with threads, and the rotating rod (10) is threadedly connected to the mounting post (4) through the through holes and the first threaded holes.

6. The construction cost settlement material management device according to claim 1, characterized in that: An extension hole is provided on one opposite side of the three groups of mounting frames (7), and the T-shaped handle (8) extends to the outside of the mounting frame (7) through the extension hole.

7. The construction cost settlement material management device according to claim 3, characterized in that: The interiors of the three groups of installation frames (7) are all provided with an annular sliding groove, and the annular sliding block (5) is slidably connected to the installation frame (7) via the annular sliding groove.

8. The construction cost settlement material management device according to claim 2, characterized in that: A moving groove is provided on the top of the placement plate (2), and the ball (12) is slidably connected to the placement plate (2) through the moving groove.

Citation Information

Cited By

  • Engineering cost settlement material management device

    CN223873524U