Semi-automatic foundation pit filling and leveling device

Through the semi-automatic foundation pit filling and leveling device, the use of push shovel, drive and soil storage transfer devices, combined with laser and remote control technology, the problems of low excavation accuracy and manual leveling efficiency are solved, achieving high efficiency and no environmental limitations foundation pit leveling effect.

CN222183494UActive Publication Date: 2024-12-17SHANDONG UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420469170.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-12-17
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

During the excavation of traditional foundation pits, it is difficult for mechanical equipment to achieve extremely high accuracy. The later manual leveling efficiency is low and labor intensity is high. It is limited by weather and environmental conditions, which affects the progress, cost and quality of the project.

Method used

A semi-automatic foundation pit filling and leveling device is designed, including a push shovel device, a drive device and a milling wheel. It can achieve precise filling through an electric telescopic rod and a laser emitter. The soil storage and transport device uses remote control and pressure sensor to improve efficiency. The milling wheel is Adjustable height and compaction, lighting ensures night construction.

Benefits of technology

The one-time leveling of foundation pits has been achieved, construction efficiency has been improved, dependence on weather and environmental conditions has been reduced, labor intensity and skill requirements have been reduced, and project quality and progress have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222183494U_ABST
    Figure CN222183494U_ABST
Patent Text Reader

Abstract

The utility model provides a semi-automatic foundation pit filling and leveling device, and particularly relates to the technical field of foundation construction equipment. The filling and leveling device comprises a push shovel device, a driving device and a grinding wheel, and the push shovel device is connected with the front end of the driving device through an electric telescopic rod; the runner wheel is arranged at the rear end of the driving device, and the two ends of a wheel shaft of the runner wheel are connected with the driving device through connecting rods; and a soil storing and transferring device is arranged under the driving device in a sliding manner. The foundation pit leveling device can effectively replace the mode that a large machine is used for leveling a foundation pit and then manual excavation is used for later refined operation, the foundation pit can be leveled at a time after the designed elevation of the foundation pit is determined by adjusting the height of the runner wheel, the leveling effect is good, the leveling device is not limited by the influence of construction environment light or weather conditions, and the construction efficiency is improved. And the construction efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation construction equipment, in particular to a semi-automatic foundation pit filling and leveling device. Background Art

[0002] At present, mechanical excavation is often used in foundation pit excavation to roughly dig to the design elevation. However, after the large-scale construction machinery is deployed, the excavated foundation is often of different depths and difficult to achieve extremely high precision. In the later stage, when manual work is carried out with the help of shovels to accurately level the foundation, manual work is usually inefficient, labor-intensive, and requires high skills and experience of workers. These factors may affect the progress, cost and quality of the project. In addition, manual work is often limited by weather and night environment, and the leveling efficiency and effect are not ideal. The progress is often slow and inefficient. Utility Model Content

[0003] In order to overcome the shortcomings of the above-mentioned existing technologies, the traditional foundation pit excavation using large-scale machinery often has uneven depths and is difficult to achieve extremely high precision. In the later stage, manual precise leveling with the help of shovels has low construction efficiency, high labor intensity, and requires high skills and experience of workers. At the same time, manual work is often limited by weather and night environment. The utility model provides a semi-automatic foundation pit filling and leveling device, and the specific technical solution is as follows:

[0004] A semi-automatic foundation pit filling and leveling device comprises a dozer device, a driving device and a rolling wheel, wherein the dozer device is connected to the front end of the driving device via an electric telescopic rod; the rolling wheel is arranged at the rear end of the driving device, and both ends of the wheel axle of the rolling wheel are connected to the driving device via connecting rods; a soil storage and transfer device is slidably arranged directly below the driving device.

[0005] Preferably, the shoveling device comprises a front shovel plate and a connecting plate; a screen is also provided at the rear end of the front shovel plate.

[0006] Preferably, the driving device comprises a chassis, driving wheels are arranged on both sides of the bottom of the chassis, and tracks are arranged on the surface of the driving wheels; a first motor, a second motor and a roller are arranged in the chassis; the driving wheel is controlled by the first motor; the output shaft sleeve of the second motor is provided with a transmission gear, and the transmission gear is meshed with the teeth on the surface of the roller; the two ends of the roller are respectively connected to connecting rods; a positioning slide rail is arranged on the side of the front end of the roller close to the dozing device, and two laser emitters are slidably arranged on the top of the positioning slide rail; two slide grooves are symmetrically arranged on the bottom plate of the chassis, and a limit stop block is also arranged at the bottom of the chassis, and the stop block is arranged at one end of the slide groove close to the dozing device.

[0007] Preferably, one end of the electric telescopic rod is fixed to the connecting plate of the shovel device, and the other end is fixed to the front end of the driving device.

[0008] Also preferably, the soil storage and transfer device includes a storage box with an open front end, and the storage box includes a rear shovel plate, remote-controlled wheels and a slider; the rear shovel plate is arranged at the front end of the bottom plate of the storage box; the remote-controlled wheels are symmetrically arranged on the bottom plate of the storage box; the slider is arranged at the top of the storage box, corresponding to the position of the slide groove; and a remote control signal receiver and a pressure sensor are also arranged on the top of the bottom plate of the storage box.

[0009] Also preferably, lighting lamps are provided on both sides of the connecting plate.

[0010] Also preferably, the connecting plate is made of steel.

[0011] Further preferably, the screen is in contact with the ground.

[0012] More preferably, the standard load capacity of the soil storage and transfer device is selected according to the actual conditions of the foundation.

[0013] The beneficial effects of the utility model are:

[0014] The utility model can effectively replace the method of using large-scale machinery to level the foundation pit and then use manual excavation for later fine work. By adjusting the height of the roller, the foundation pit can be leveled at one time after the design elevation of the foundation pit is determined. The leveling effect is good and is not limited by the light or weather conditions of the construction environment, which greatly improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The drawings constituting the specification of this application are used to provide further understanding of this application and do not constitute improper limitations on this application.

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a side view of the utility model;

[0018] Figure 3 It is a structural schematic diagram of the driving device in the utility model;

[0019] Figure 4 is a schematic diagram of the position of the slideway in the drive device;

[0020] Figure 5 It is a structural schematic diagram of the soil storage and transportation device in the utility model;

[0021] Figure 6 It is the working roadmap of this utility model;

[0022] In the figure, 1-pushing device; 11-front shovel plate; 12-screen; 13-connecting plate; 131-lighting lamp; 2-driving device; 21-chassis; 22-first motor; 23-track; 24-driving wheel; 25-positioning slide rail; 251-laser transmitter; 26-second motor; 27-transmission gear; 28-roller; 29-connecting rod; 30-slide; 31-limiting block; 3-rolling wheel; 4-soil storage and transportation device; 41-rear shovel plate; 42-pressure sensor; 43-remote control signal receiver; 44-remote control wheel; 45-slider; 5-electric telescopic rod. DETAILED DESCRIPTION

[0023] The specific implementation manner of a semi-automatic foundation pit filling and leveling device provided by the utility model is further described in conjunction with the accompanying drawings and embodiments.

[0024] like Figure 1-2 As shown, a semi-automatic foundation pit filling and leveling device comprises a bulldozer device 1, a driving device 2 and a roller 3. Preferably, the bulldozer device 1 comprises a front bulldozer plate 11, a screen 12 and a connecting plate 3, the connecting plate 3 of the bulldozer device 1 is connected to the front end of the driving device 2 through an electric telescopic rod 5; the roller 3 is arranged at the rear end of the driving device 2; both ends of the axle of the roller 3 are connected to the driving device 2 through a connecting rod 29; and a soil storage and transfer device 4 is slidably arranged directly below the driving device 2.

[0025] like Figure 3 As shown, the driving device 2 includes a chassis 21, and driving wheels 24 are arranged on both sides of the bottom of the chassis. The surface of the driving wheel 24 is provided with a track 23, wherein the driving wheel and the track belong to the prior art, and any driving wheel and track that can achieve movement or steering can be used, and no further details are given here. The chassis 21 is provided with a first motor 22, a second motor 26 and a roller 28; wherein the driving wheel 24 is controlled by the first motor 22; the output shaft sleeve of the second motor 26 is provided with a transmission gear 27, and the transmission gear 27 is meshed with the tooth pattern on the surface of the roller 28; the two ends of the roller 28 are respectively connected to the connecting rod 29; it is worth noting that the forward and reverse directions of the roller can be rotated by controlling the forward and reverse rotation of the second motor 26, thereby driving the connecting rods at both ends of the roller to flip, thereby realizing the lifting and lowering adjustment of the roller 3, and realizing the compaction requirements of foundation pits with different elevations, and the roller 3 can improve the compaction degree through its own transmission.

[0026] Preferably, a positioning rail 25 is provided at the front end of the roller 28 near the side of the shovel device 1, and two laser emitters 251 are slidably provided on the top of the positioning rail 25. By adjusting the position of the laser emitter 251, the running track of the device can be controlled so that it does not deviate, thereby ensuring the filling and leveling effect; Figure 4As shown, the bottom plate of the chassis 21 is symmetrically provided with two slide grooves 30, and a limit stopper 31 is also provided at the bottom of the chassis 21. The stopper 31 is arranged at one end of the slide groove 30 close to the shovel device 1, in order to limit its card-in position when the soil storage and transfer device 4 moves to the bottom of the driving device 2.

[0027] like Figure 5 As shown, the soil storage and transfer device 4 includes a storage box with an opening at the front end, and the storage box includes a rear shovel plate 41, a remote control wheel 44 and a slider 45; wherein the rear shovel plate 41 is arranged at the front end of the storage box bottom plate; the remote control wheel 44 is symmetrically arranged on the storage box bottom plate; the slider 45 is arranged at the top of the storage box, corresponding to the position of the slide 30, and it is worth noting that the size of the slider 45 is adapted to the size of the slide 30 to ensure the fit between the two; the top of the storage box bottom plate is also provided with a pressure sensor 42 and a remote control signal receiver 43. The soil storage and transfer device 4 controls the movement of the remote control wheel 44 through the remote control handle through the remote control signal receiver 43, so as to realize the movement of the soil storage and transfer device 4 from directly below the driving device 2 in or out, and the pressure sensor 42 is mainly used to detect the weight of the soil stored in the storage box of the soil storage and transfer device 4. When the soil reaches 95% of the actual load, the pressure sensor 42 sends a signal indication, and at this time, the staff can control the soil storage and transfer device 4 to move out and empty or replace the empty soil storage and transfer device 4 through the remote control handle.

[0028] Preferably, the standard load of the soil storage and transfer device 4 is selected according to the actual conditions of the foundation, and a storage box with a standard load of 100KG, 300KG or 500KG can be selected.

[0029] Also preferably, in order to ensure that the construction is not restricted by night or light conditions, lighting lamps 131 are provided on both sides of the connecting plate 13 .

[0030] Further preferably, in order to ensure the overall connection strength of the device, the connection plate 13 is made of steel.

[0031] It is worth noting that in order to ensure the filling effect, the screen 12 needs to fit the ground.

[0032] When in use, first turn on the second motor 26 to drive the transmission gear 27 to rotate, and then control the roller 28 to rotate, so that the connecting rod 29 connected to the two ends of the roller 28 is flipped up, and the roller 3 is lifted off the ground. When there is sufficient space between the roller 3 and the ground, the remote control handle is controlled to control the soil storage and transfer device 4 to slide along the slide groove 30 to the bottom of the drive device 2 until the front end stops against the limit block 31; then control the second motor 26 to rotate in the opposite direction, and lower the roller 3 to fit the ground.

[0033] Working principle: When the foundation pit needs to be filled, first put the accumulated soil into the push shovel device 1, turn on the device and move it forward. During the movement, the accumulated soil will fall into the area to be filled through the screen 12. If the area is large or deep, the movement speed of the device is reduced by controlling the rotation rate of the first motor 22 until it is filled and compacted by the roller 3. The excess accumulated soil is recovered by the rear soil storage and transfer device 4. When the foundation pit needs to be leveled, first empty the push shovel device 1. When the device moves to the raised area in the foundation pit, the soil in the raised part will be shoveled into the push shovel device 1 by the front shovel plate 11. As the device continues to move forward, the excess soil will leak out through the screen 2 and be recycled into the storage box of the soil storage and transfer device 4 through the rear shovel plate 41. When the soil in the storage box reaches 95% of the actual load, the pressure sensor device 42 sends a signal indication. At this time, the staff can control the soil storage and transfer device 4 to move out and empty or replace the empty soil storage and transfer device 4 through the remote control handle, and then continue to work.

[0034] The main operation route of the device is as follows: Figure 6 As shown, when working, first start from point A, aim the laser emitter 251 at point 1 and point 2 at point B in sequence, and then aim at point 3 and point 4 at point C when arriving at point B, and then aim at point 5 and point 6 at point D..., and work repeatedly in a clockwise direction in a U-shaped direction to ensure the overall flatness and design elevation of the foundation pit.

[0035] The utility model can effectively replace the method of using large-scale machinery to level the foundation pit and then use manual excavation for later fine work. By adjusting the height of the roller, the foundation pit can be leveled at one time after the design elevation of the foundation pit is determined. The leveling effect is good and is not limited by the light or weather conditions of the construction environment, which greatly improves the construction efficiency.

[0036] In the present utility model, the directions or positional relationships indicated by terms such as "upper", "lower", "bottom", "top", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or components of the present utility model. They do not specifically refer to the parts or components of the present utility model and cannot be understood as limitations on the present utility model. Terms such as "connected" and "connected" should be understood in a broad sense, indicating that they can be fixedly connected, integrally connected, or detachably connected; they can be directly connected or indirectly connected through an intermediate medium. For relevant scientific research or technical personnel in this field, the specific meanings of the above terms in the present utility model can be determined according to specific circumstances, and they cannot be understood as limitations on the present utility model.

[0037] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. A semi-automatic foundation pit filling and leveling device, characterized in that: It includes a push-shovel device, a driving device and a rolling wheel. The push-shovel device is connected to the front end of the driving device through an electric telescopic rod; the rolling wheel is arranged at the rear end of the driving device, and both ends of the wheel axle of the rolling wheel are connected to the driving device through connecting rods; a soil storage and transfer device is slidably arranged directly below the driving device.

2. The semi-automatic foundation pit filling and leveling device according to claim 1 is characterized in that: The shoveling device comprises a front shoveling plate and a connecting plate; a screen is also arranged at the rear end of the front shoveling plate.

3. The semi-automatic foundation pit filling and leveling device according to claim 2 is characterized in that: The driving device includes a chassis, driving wheels are arranged on both sides of the bottom of the chassis, and tracks are arranged on the surface of the driving wheels; a first motor, a second motor and a roller are arranged in the chassis; the driving wheel is controlled by the first motor; the output shaft sleeve of the second motor is provided with a transmission gear, and the transmission gear is meshed with the teeth on the surface of the roller; the two ends of the roller are respectively connected to connecting rods; a positioning slide rail is arranged on the side of the front end of the roller close to the dozing device, and two laser transmitters are slidably arranged on the top of the positioning slide rail; two slide grooves are symmetrically arranged on the bottom plate of the chassis, and a limit stop block is also arranged at the bottom of the chassis, and the stop block is arranged at one end of the slide groove close to the dozing device.

4. The semi-automatic foundation pit filling and leveling device according to claim 3 is characterized in that: One end of the electric telescopic rod is fixed to the connecting plate of the shovel device, and the other end is fixed to the front end of the driving device.

5. The semi-automatic foundation pit filling and leveling device according to claim 1 is characterized in that: The soil storage and transfer device includes a storage box with an open front end, and the storage box includes a rear shovel plate, remote-controlled wheels and a slider; the rear shovel plate is arranged at the front end of the bottom plate of the storage box; the remote-controlled wheels are symmetrically arranged on the bottom plate of the storage box; the slider is arranged at the top of the storage box, corresponding to the position of the slide groove; a remote control signal receiver and a pressure sensor are also arranged on the top of the bottom plate of the storage box.

6. The semi-automatic foundation pit filling and leveling device according to claim 2 is characterized in that: Illuminating lamps are arranged on both sides of the connecting plate.

7. The semi-automatic foundation pit filling and leveling device according to claim 6 is characterized in that: The connecting plate is made of steel material.

8. The semi-automatic foundation pit filling and leveling device according to claim 2 is characterized in that , the screen is in contact with the ground.

9. The semi-automatic foundation pit filling and leveling device according to claim 5 is characterized in that: The standard load of the storage box is selected according to the actual situation of the foundation.