Steel structure hoisting device for on-site lifting by using existing structural column

By using existing structural columns to install lifting devices and control systems in construction, steel structure lifting is realized under space limitations, solving the problem of lifting difficulties of giant steel structures, ensuring construction safety and quality, and improving Construction flexibility and progress.

CN222204560UActive Publication Date: 2024-12-20CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421127288.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-12-20
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

During construction, especially in the underground sites where space is limited, it is difficult to lift giant steel structures and existing large lifting equipment cannot enter, making it difficult to carry out lifting work.

Method used

Design a steel structure lifting device that uses existing structural columns to lift on site, including a sling, a lifting device, a fixed bracket and a mounting bracket. By installing a lifting device on the existing structural columns, multiple lifting devices are connected to the control system. , achieve multi-point joint improvement, avoiding equipment waste and deformation.

Benefits of technology

It realizes the rapid completion of the lifting of large-span steel structure brackets under space limitations, ensuring construction safety and quality, avoiding equipment waste and deformation, and improving construction flexibility and progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222204560U_ABST
    Figure CN222204560U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel structure hoisting device capable of realizing on-site hoisting by utilizing an existing structural column. The steel structure hoisting device comprises a hoisting tool, a hoisting device, a fixed bracket and a mounting bracket, the lifting appliance is mounted on a steel structure frame body needing to be lifted; the lifting device is arranged right above the lifting appliance, and the lifting device is mounted on the fixed bracket; the fixed bracket is fixedly connected with the mounting bracket; and the mounting bracket is mounted on the existing structural column. By means of the existing structural column which is already constructed, the lifting device is installed on the existing structural column, hoisting can be completed without large hoisting equipment through the on-site hoisting mode, and hoisting of the large-span steel structure support can be rapidly completed under the condition that the space is limited. A plurality of steel structure hoisting devices are used in cooperation and connected through the same control system, it can be guaranteed that multiple points of the steel structure support are jointly hoisted in the hoisting process, deformation of the steel structure support in the hoisting process can be reduced, and the final forming quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a steel structure hoisting device which utilizes existing structural columns to lift on-site. Background Art

[0002] In construction, steel structure is a very important type of building structure, with many advantages such as high strength, light weight, good rigidity, strong toughness, etc., so it is widely used. Some large steel structures often weigh tens or hundreds of tons, and the lifting of these steel structures is mainly completed by large hoisting equipment. However, under some special difficult conditions, such as the small space around the site, the influence of obstacles or the inability to be removed, large hoisting equipment cannot enter the work area. Under such space-limited working conditions, hoisting work is very difficult to carry out. Utility Model Content

[0003] In view of the shortcomings of the prior art, the utility model designs a steel structure lifting device for on-site lifting using existing structural columns, comprising: a lifting device, a lifting device, a fixed bracket and an installation bracket; the lifting device is installed on the steel structure frame to be lifted; the lifting device is arranged directly above the lifting device, and the lifting device is installed on the fixed bracket; the fixed bracket is fixedly connected to the installation bracket; the installation bracket is installed on the existing structural column.

[0004] Preferably, there is one lifting device, which is installed on one side of the fixed bracket.

[0005] Preferably, the steel structure hoisting device is installed on a structural column at an edge position.

[0006] Preferably, there are two lifting devices, which are respectively installed on both sides of the fixed bracket.

[0007] Preferably, the steel structure hoisting device is installed on a structural column at a middle position.

[0008] Preferably, the lifting is carried out by using a plurality of steel structure lifting devices in cooperation with each other, and the plurality of steel structure lifting devices are all connected to the control system.

[0009] Preferably, a control unit is provided in the lifting device, and the control unit is connected to the control system.

[0010] Preferably, the mounting bracket is installed on the top or side of the existing structural column; the structure of the mounting bracket is determined according to the construction site.

[0011] Compared with the closest prior art, the beneficial effects of the utility model are:

[0012] 1. The utility model utilizes the existing structural columns that have been constructed and installs the lifting device on the existing structural columns. This on-site lifting method does not require large-scale lifting equipment to complete the lifting. When the space is limited, the large-span steel structure bracket can be quickly lifted.

[0013] 2. The utility model sets different numbers of lifting devices according to the positions of the existing structural columns, which can avoid the situation where there are too few lifting devices and the lifting force is insufficient, and can also avoid the situation where there are too many lifting devices and the waste is caused. It not only ensures the safety of construction, but also avoids the waste of financial and material resources.

[0014] 3. The utility model can be used in conjunction with multiple steel structure hoisting devices, which are connected through the same control system. This can ensure that the steel structure support is lifted at multiple points during the lifting process, reduce the deformation of the steel structure support during the lifting process, and ensure the quality of the final forming.

[0015] 4. The installation bracket of the utility model is adjusted according to the situation on site. The principle of adjustment is to ensure the strength of the installation bracket without collision with the steel structure bracket during the hoisting process, which increases the flexibility of construction and ensures the progress and safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the steel structure lifting device of the utility model.

[0017] Figure 2 It is a structural schematic diagram of the steel structure frame and the hanger of the utility model.

[0018] Figure 3 It is a structural schematic diagram of the fixing bracket of the utility model.

[0019] Reference numerals:

[0020] 1-Steel structure frame, 2-Lifting device, 3-Lifting device, 4-Fixed bracket, 5-Installation bracket. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0022] Example 1

[0023] like Figure 1-Figure 3As shown, the utility model provides a steel structure hoisting device for on-site lifting using existing structural columns, comprising: a hoist 2, a lifting device 3, a fixed bracket 4 and a mounting bracket 5; the hoist 2 is installed on the steel structure frame to be lifted; the lifting device 3 is arranged directly above the hoist 2, and the lifting device 3 is installed on the fixed bracket 4; the fixed bracket 4 is fixedly connected to the mounting bracket 5; the mounting bracket 5 is installed on the existing structural column. By using the existing structural column that has been constructed, the lifting device is installed on the existing structural column. This on-site lifting method does not require large-scale lifting equipment to complete the lifting, and can quickly complete the lifting of large-span steel structure brackets under limited space.

[0024] In a preferred embodiment, the steel structure hoisting device installed on the structural column at the edge position includes a lifting device 3, and the lifting device 3 is installed on one side of the fixed bracket 4. The steel structure hoisting device installed on the structural column at the middle position includes two lifting devices 3, and the two lifting devices 3 are respectively installed on both sides of the fixed bracket 4. Different numbers of lifting devices are set according to the position of the existing structural column, which can avoid the situation where there are too few lifting devices and the lifting force is insufficient, and can also avoid the situation where there are too many lifting devices and the waste is caused, which not only ensures the safety of construction, but also avoids the waste of financial and material resources.

[0025] In a preferred embodiment, the lifting is carried out by using a plurality of steel structure lifting devices in cooperation, and the plurality of steel structure lifting devices are all connected to the control system. A control unit is provided in the lifting device 3, and the control unit is connected to the control system. The plurality of steel structure lifting devices are used in cooperation and connected through the same control system, so that the steel structure support can be lifted at multiple points during the lifting process, and the deformation of the steel structure support during the lifting process can be reduced, thereby ensuring the quality of the final forming.

[0026] In a preferred embodiment, the mounting bracket 5 is installed on the top or side of the existing structural column; the structure of the mounting bracket 5 is determined according to the construction site. The mounting bracket is adjusted according to the conditions on site, and the principle of adjustment is to ensure that the mounting bracket does not collide with the steel structure bracket during the hoisting process while ensuring the strength of the mounting bracket, thereby increasing the flexibility of the construction and ensuring the progress and safety of the construction.

[0027] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention to be approved.

Claims

1. A steel structure hoisting device for on-site lifting using existing structural columns, characterized in that: include: A sling (2), a lifting device (3), a fixing bracket (4) and a mounting bracket (5); The lifting device (2) is installed on the steel structure frame to be lifted; The lifting device (3) is arranged directly above the lifting device (2), and the lifting device (3) is mounted on the fixed bracket (4); The fixing bracket (4) is fixedly connected to the mounting bracket (5); The mounting bracket (5) is mounted on an existing structural column.

2. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 1, characterized in that: The number of the lifting device (3) is one, and the lifting device (3) is installed on one side of the fixed bracket (4).

3. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 2, characterized in that: The steel structure hoisting device is installed on the structural column at the edge position.

4. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 1, characterized in that: The number of the lifting devices (3) is two, and the two lifting devices (3) are respectively installed on both sides of the fixed bracket (4).

5. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 4, characterized in that: The steel structure hoisting device is installed on the structural column at the middle position.

6. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 1, characterized in that: The lifting is carried out by using a plurality of the steel structure lifting devices in cooperation with each other, and the plurality of the steel structure lifting devices are all connected to the control system.

7. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 6, characterized in that: A control unit is provided in the lifting device (3), and the control unit is connected to the control system.

8. The steel structure hoisting device for on-site lifting using existing structural columns as claimed in claim 1, characterized in that: The mounting bracket (5) is mounted on the top or side of an existing structural column; The structure of the mounting bracket (5) is determined according to the construction site.