Coating and rolling combined type polymer waterproof roll

By introducing protective layer, waterproof layer, fixing strip and double bonding layer into the polymer waterproof roll, the overlapping problem during roll laying is solved, and better neat and waterproofing effect is achieved, and the roll is enhanced. Stability and waterproofing.

CN222205108UActive Publication Date: 2024-12-20HEFEI ZHONGTONG WATERPROOF ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420333698.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-12-20
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

When laying, existing polymer waterproof coils are prone to overlap due to their long length and high softness, which leads to difficulty in neat and flat laying.

Method used

The coating-coil-bonded polymer waterproof coil design is designed, including a protective layer, a waterproof layer, a fixing strip, a first adhesive layer, a first isolation film and a dip coating layer. Through the interaction force of the fixing strip and the double protection mechanism, the Risk of stacking and damage, and improves water resistance and ease of cutting through hollow and partition grooves.

Benefits of technology

Effectively reduce the possibility of polymer waterproof coils overlapping during laying, improve the neat laying capacity, enhance the protection and waterproof performance of the waterproof layer, reduce the risk of separation under the influence of external factors, and facilitate cutting and transportation .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222205108U_ABST
    Figure CN222205108U_ABST
Patent Text Reader

Abstract

The utility model discloses a coating and rolling combined type polymer waterproof roll, which belongs to the technical field of building waterproofing and comprises a protective layer, a waterproof layer is arranged below the protective layer, a plurality of fixing strips are uniformly arranged between the waterproof layer and the protective layer, a first bonding layer is arranged below the waterproof layer, and a second bonding layer is arranged below the first bonding layer. And a first isolating membrane is arranged below the first bonding layer. According to the utility model, the macromolecule waterproof coiled material can be tidily paved conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building waterproofing, in particular to a coating-roll combined polymer waterproofing coiled material. Background Art

[0002] Waterproof membrane is mainly used in building walls, roofs, tunnels, roads, landfills, etc. It is a kind of flexible building material product that can be rolled into a roll to resist the leakage of external rainwater and groundwater. Waterproof membrane includes asphalt waterproof membrane and polymer waterproof membrane.

[0003] The polymer waterproofing membrane in the prior art is based on synthetic rubber, synthetic resin or a blend of the two, with appropriate amounts of chemical additives and fillers added, and processed through different processes to form a rollable sheet waterproofing material, including polyethylene waterproofing membrane, chloroprene rubber membrane, etc.

[0004] However, when laying the polymer waterproofing membrane, the middle part of the membrane is prone to overlap due to its long length and high softness, making it inconvenient to lay the polymer waterproofing membrane neatly and flatly. Utility Model Content

[0005] The present application provides a coating-rolled combined polymer waterproofing coiled material, which can facilitate the neat and flat laying of the polymer waterproofing coiled material.

[0006] The present application provides a coating-coiled polymer waterproofing membrane, which adopts the following technical solution:

[0007] A coated and rolled polymer waterproofing membrane comprises a protective layer, a waterproof layer is arranged below the protective layer, a plurality of fixing strips are evenly arranged between the waterproof layer and the protective layer, a first adhesive layer is arranged below the waterproof layer, and a first isolation film is arranged below the first adhesive layer.

[0008] By adopting the above technical solution, when it is necessary to lay the polymer waterproof membrane, the operator first separates the first isolation film from the first adhesive layer, and then bonds the first adhesive layer to the base layer. By setting the fixing strips, when the operator is laying the membrane flat, adjacent fixing strips can provide interaction force, which can facilitate flattening the membrane between two adjacent fixing strips, thereby reducing the possibility of overlapping the membrane, and then facilitating the neat laying of the polymer waterproof membrane. By setting the protective layer, the waterproof layer can be protected, thereby reducing the possibility of damage to the waterproof layer when working on the waterproof layer.

[0009] Preferably, the fixing strip is arranged along the width direction of the protective layer.

[0010] By adopting the above technical solution, it is possible to facilitate laying the coiled material along the length direction of the protective layer.

[0011] Preferably, a coating layer is provided between the first adhesive layer and the waterproof layer.

[0012] By adopting the above technical solution, when the base layer needs to be waterproofed, the requirements of engineering waterproofing can be easily met through the double protection of the coating layer and the waterproof layer.

[0013] Preferably, a second adhesive layer is provided between the protective layer and the waterproof layer, and the fixing strip is provided in the second adhesive layer.

[0014] By adopting the above technical solution, when the operator lays the roll material, the provision of the second adhesive layer can reduce the possibility of movement of the fixing strip, and at the same time, the protective layer and the waterproof layer are bonded together, thereby reducing the possibility of separation of the protective layer and the waterproof layer under the influence of external factors.

[0015] Preferably, a plurality of empty grooves are evenly formed on the first adhesive layer.

[0016] By adopting the above technical solution, after the coil material is laid, the area where the coating layer and the base layer are in contact is reduced by setting the empty grooves. When the base layer breaks and cracks occur, the possibility of the coil material breaking under the action of the base layer stress can be reduced, thereby improving the waterproofness of the coil material.

[0017] Preferably, a plurality of partition grooves are evenly formed on the side wall of the protective layer.

[0018] By adopting the above technical solution, when an operator needs to cut a coil, the provision of the partition grooves can facilitate the operator to cut along the direction of adjacent partition grooves.

[0019] Preferably, the side wall of the protective layer is provided with a winding core tube.

[0020] By adopting the above technical solution, when the operator winds the coiled material on the winding core tube, the shape of the coiled material can be easily maintained, thereby facilitating transportation.

[0021] Preferably, a third adhesive layer is disposed on a side wall of the first isolation film close to the dipping coating layer, and a second isolation film is disposed on a side wall of the third adhesive layer.

[0022] By adopting the above technical solution, after the operator winds the coiled material onto the outer wall of the winding core tube, the second isolation film is torn off, and then the third adhesive layer is adhered to the side wall of the first isolation film, so that the coiled material can be easily fixed.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. When it is necessary to lay the polymer waterproofing membrane, the operator first separates the first isolation film from the first adhesive layer, and then adheres the first adhesive layer to the base surface. By setting the fixing strips, when the operator is laying the membrane flat, the adjacent fixing strips can provide mutual force, which can facilitate the flattening of the membrane between two adjacent fixing strips, thereby reducing the possibility of overlapping the membrane, and then facilitating the neat laying of the polymer waterproofing membrane. By setting the protective layer, the waterproof layer can be protected, thereby reducing the possibility of damage to the waterproof layer when working on the waterproof layer;

[0025] 2. When the base surface needs to be waterproofed, the double protection of the coating layer and the waterproof layer can easily meet the requirements of engineering waterproofing;

[0026] 3. When the operator lays the coiled material, the second adhesive layer can reduce the possibility of movement of the fixing strip, and at the same time, the protective layer and the waterproof layer are bonded together, thereby reducing the possibility of separation of the protective layer and the waterproof layer under the influence of external factors. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of this embodiment;

[0028] Figure 2 is a cross-sectional view showing an empty slot in this embodiment;

[0029] Figure 3 yes Figure 2 A partial enlarged view of point A in the middle.

[0030] Explanation of the accompanying drawings: 1. Protective layer; 11. Waterproof layer; 12. Fixing strip; 13. First adhesive layer; 14. First isolation membrane; 15. Coating layer; 16. Second adhesive layer; 17. Empty groove; 18. Partition groove; 19. Third adhesive layer; 20. Second isolation membrane; 21. Roll core tube. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-Figure 3 This application is described in further detail.

[0032] The utility model discloses a coating-rolling combined polymer waterproofing coiled material, such as Figure 1 and Figure 2As shown, it includes a protective layer 1, which is a wear-resistant rubber layer. A waterproof layer 11 is bonded below the protective layer 1, and the waterproof layer 11 is a polyethylene film. A plurality of fixing strips 12 are evenly arranged between the waterproof layer 11 and the protective layer 1. The cross-section of the fixing strips 12 is square and is arranged along the width direction of the waterproof layer 11. A first adhesive layer 13 is arranged below the waterproof layer 11, and the first adhesive layer 13 is a non-asphalt pressure-sensitive adhesive layer. A first isolation film 14 is bonded below the first adhesive layer 13, and the length of the first isolation film 14 is longer than that of the waterproof layer 11, and the first isolation film 14 is a polyolefin film.

[0033] When it is necessary to lay the polymer waterproof membrane, the operator first separates the first isolation film 14 from the first adhesive layer 13, and then bonds the first adhesive layer 13 to the base surface. Through the setting of the fixing strips 12, when the operator is laying the membrane flat, adjacent fixing strips 12 can provide interaction force, which can facilitate the flattening of the membrane between two adjacent fixing strips 12, thereby reducing the possibility of overlapping of the membrane, and then facilitating the neat laying of the polymer waterproof membrane. Through the setting of the protective layer 1, the waterproof layer 11 can be protected, thereby reducing the possibility of damaging the waterproof layer 11 when working on the waterproof layer 11.

[0034] like Figure 2 and Figure 3 As shown, a coating layer 15 is provided between the first adhesive layer 13 and the waterproof layer 11, and the polypropylene waterproof coiled material is immersed in the waterproof coating, and the waterproof coating particles are adsorbed on the surface of the polypropylene waterproof coiled material, thereby obtaining the coating layer 15. When the base surface needs to be waterproofed, the requirements of engineering waterproofing can be easily met under the dual protection of the coating layer 15 and the waterproof layer 11.

[0035] like Figure 2 and Figure 3 As shown, a second adhesive layer 16 is provided between the protective layer 1 and the waterproof layer 11. The second adhesive layer 16 is a non-asphalt pressure-sensitive adhesive layer, and the fixing strip 12 is provided inside the second adhesive layer 16. When the operator lays the coiled material, the second adhesive layer 16 can reduce the possibility of the fixing strip 12 moving, and at the same time, the protective layer 1 and the waterproof layer 11 are bonded together, so as to reduce the possibility of the protective layer 1 and the waterproof layer 11 being separated under the influence of external factors.

[0036] like Figure 2As shown, a plurality of slots 17 are evenly provided along the length direction on the first adhesive layer 13, and the cross section of the slots 17 is square and extends along the vertical direction. After the coiled material is laid, the slots 17 are provided to reduce the area where the coating layer 15 is attached to the base layer, so that when the base layer breaks and cracks occur, the possibility of the coiled material breaking under the stress of the base layer can be reduced, thereby improving the waterproofness of the coiled material.

[0037] like Figure 2 and Figure 3 As shown, the side wall of the protective layer 1 is evenly provided with a plurality of partition grooves 18 along the length direction and the width direction, and the partition grooves 18 extend along the vertical direction and penetrate the protective layer 1. When the operator needs to cut the coil, the provision of the partition grooves 18 facilitates the operator to cut along the direction of adjacent partition grooves 18.

[0038] like Figure 1 and Figure 2 As shown, the side wall of the protective layer 1 is provided with a winding core tube 21, the cross section of the winding core tube 21 is circular and is arranged along the width direction of the protective layer 1. When the operator winds the coil on the winding core tube 21, the shape of the coil can be easily maintained, and then it can be easily transported.

[0039] like Figure 2 As shown, the side wall of the first isolation film 14 close to the coating layer 15 is provided with a third adhesive layer 19, the third adhesive layer 19 is square, the third adhesive layer 19 is a non-asphalt pressure-sensitive adhesive layer, and the side wall of the third adhesive layer 19 is bonded with a second isolation film 20, which is a polyolefin film. After the operator winds the coiled material onto the outer wall of the winding core tube 21, the second isolation film 20 is torn off, and then the third adhesive layer 19 is bonded to the side wall of the first isolation film 14, so that the coiled material can be easily fixed.

[0040] The implementation principle of a coating-coil-combined polymer waterproofing membrane in the present application embodiment is as follows:

[0041] When it is necessary to lay the polymer waterproof membrane, the operator first separates the first isolation film 14 from the first adhesive layer 13, and then bonds the first adhesive layer 13 to the base surface. Through the setting of the fixing strips 12, when the operator is laying the membrane flat, adjacent fixing strips 12 can provide interaction force, so that the membrane between two adjacent fixing strips 12 can be flattened, thereby reducing the possibility of overlapping of the membrane, and then facilitating the neat laying of the polymer waterproof membrane. Through the setting of the protective layer 1, the waterproof layer 11 can be protected, thereby reducing the possibility of damaging the waterproof layer 11 when working on the waterproof layer 11.

[0042] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A coating-coated polymer waterproofing membrane, characterized in that: The invention comprises a protective layer (1), a waterproof layer (11) is arranged below the protective layer (1), a plurality of fixing strips (12) are evenly arranged between the waterproof layer (11) and the protective layer (1), a first adhesive layer (13) is arranged below the waterproof layer (11), and a first isolation film (14) is arranged below the first adhesive layer (13).

2. The coating-coated polymer waterproofing membrane according to claim 1, characterized in that: The fixing strip (12) is arranged along the width direction of the protective layer (1).

3. The coating-coated polymer waterproofing membrane according to claim 1, characterized in that: A coating layer (15) is provided between the first adhesive layer (13) and the waterproof layer (11).

4. The coating-coated polymer waterproofing membrane according to claim 1, characterized in that: A second adhesive layer (16) is provided between the protective layer (1) and the waterproof layer (11), and the fixing strip (12) is provided in the second adhesive layer (16).

5. The coating-coated polymer waterproofing membrane according to claim 1, characterized in that: A plurality of empty grooves (17) are evenly arranged on the first adhesive layer (13).

6. The coating-coated polymer waterproofing membrane according to claim 1, characterized in that: The side wall of the protective layer (1) is evenly provided with a plurality of partition grooves (18).

7. The coating-coated polymer waterproofing membrane according to claim 1, characterized in that: The side wall of the protective layer (1) is provided with a winding core tube (21).

8. The coating-coiled polymer waterproofing membrane according to claim 3, characterized in that: A third adhesive layer (19) is provided on the side wall of the first isolation film (14) close to the dip coating layer (15), and a second isolation film (20) is provided on the side wall of the third adhesive layer (19).