Climbing frame pressure spring protection device

By designing the climbing frame compression spring protection device, the combined structure of the protective box and clamping plate is used to solve the problems of concrete leakage and rainwater erosion, and effective protection of the climbing frame equipment is achieved to avoid equipment damage and rust, and the structure is simple. , low cost.

CN222227913UActive Publication Date: 2024-12-24GANSU SIXTH CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420742613.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-11
Publication Date
2024-12-24
Estimated Expiration
2034-04-11

AI Technical Summary

Technical Problem

The existing adhesion climbing frames in the construction industry are prone to concrete leakage during construction, especially when pouring concrete, resulting in equipment damage. The compression springs on the electric hoist are prone to rust in rainy and snowy weather, and the existing protective measures are not effective. .

Method used

A climbing frame compression spring protection device is designed, including a hanger, support plate, adjustment screw, press plate, protection box and clamping plate. The protective box sleeve is installed on the adjustment screw, and screws are provided on the side wall and bottom of the protective box. Holes and screws, clamping plates are used to fix the protective box, folding edges increase the protective area, and the handle is easy to install and disassemble.

Benefits of technology

Effectively prevent concrete and rainwater from eroding the compression spring, increasing protection against chains and electric hoists, simple structure, low cost, quick and convenient installation and disassembly, and prevent equipment damage and rust.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227913U_ABST
    Figure CN222227913U_ABST
Patent Text Reader

Abstract

The utility model provides a climbing frame pressure spring protection device which is characterized in that a supporting plate is installed on a hanging bracket, a first through hole is formed in the supporting plate, an adjusting lead screw is arranged in the first through hole, a pressing plate is arranged above the supporting plate, a second through hole is formed in the pressing plate, the adjusting lead screw penetrates through the second through hole, and the adjusting lead screw is arranged in the second through hole. The adjusting lead screw is sleeved with a compressed spring, the compressed spring is located between the supporting plate and the pressing plate, the adjusting lead screw is sleeved with a nut, the nut is located on the upper side of the pressing plate, the bottom end of the adjusting lead screw is connected with a chain, and a protection box with the bottom of an open structure is arranged on the supporting plate. The protection box is arranged on the adjusting lead screw in a sleeving mode, and the pressing plate is located in the protection box. The protective box is arranged, the protective box is arranged on the pressure spring of the adjusting lead screw in a sleeved mode for protection, and concrete and rainwater can be effectively prevented from eroding the pressure spring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction equipment and relates to a climbing frame compression spring protection device. Background Art

[0002] The attached climbing frames currently used in the construction industry mainly rely on supports, guide rails, electric hoists, and chains to drive the frame for lifting. In the actual construction process, especially when pouring concrete, concrete leakage often occurs. The leaked concrete can fall on the lifting system of the climbing frame and wrap the chain, electric hoist, and the compression spring on the electric hoist. After solidification, the above-mentioned devices cannot be used normally or even the above-mentioned equipment is damaged. In addition, in rainy and snowy weather, the compression spring on the electric hoist is prone to rust after being exposed to rain. Currently, most of them use simple protective measures, such as using plastic sheets to cover, but the protective effect is not good. Utility Model Content

[0003] The utility model aims to provide a climbing frame compression spring protection device to solve the problem that the protection effect of the electric hoist and compression spring of the lifting system of the climbing frame in the background technology is not good.

[0004] To this end, the utility model adopts the following technical solutions:

[0005] A climbing frame compression spring protection device comprises a hanger, a support plate is installed on the hanger, a first through hole is provided on the support plate, an adjusting screw is provided in the first through hole, a pressure plate is provided above the support plate, a second through hole is provided on the pressure plate, the adjusting screw passes through the second through hole, a compression spring is sleeved on the adjusting screw, the compression spring is located between the support plate and the pressure plate, a nut is sleeved on the adjusting screw, the nut is located on the upper side of the pressure plate, a chain is connected to the bottom end of the adjusting screw, a protection box with an open bottom is provided on the support plate, the protection box is sleeved on the adjusting screw and the compression spring is located inside the protection box.

[0006] Furthermore, a first screw hole is provided on the side wall of the protective box, a first screw is provided in the first screw hole, a first clamping plate is provided at the inner end of the first screw, the first clamping plate is abutted against the edge of the pressure plate, a second screw hole is provided on the side wall of the protective box away from the first screw hole, a second screw is provided in the second screw hole, a second clamping plate is provided at the inner end of the second screw, and the second clamping plate is abutted against the edge of the pressure plate.

[0007] Furthermore, an inclined folded edge is provided at the bottom edge of the protective box.

[0008] Furthermore, the support plate is arranged horizontally.

[0009] Furthermore, the adjusting screw rod is arranged vertically.

[0010] Furthermore, the pressing plate is arranged horizontally.

[0011] Furthermore, a handle is provided on the top of the protective box.

[0012] The beneficial effects of the utility model are: a protective box is set, and the protective box is sleeved on the compression spring of the adjusting screw rod for protection, which can effectively prevent the compression spring from being corroded by concrete and rainwater; a folded edge is set on the bottom edge of the protective box to increase the protection area and protect the chain or electric hoist; the protective box is fixed and installed by a clamping plate, and the installation and disassembly method is fast and convenient; the structure is simple and the manufacturing cost is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic front view of the structure of the utility model;

[0014] Figure 2 It is a schematic side view of the structure of the utility model;

[0015] In the figure, 1- hanger, 2- support plate, 3- first through hole, 4- adjusting screw rod, 5- pressure plate, 6- second through hole, 7- compression spring, 8- nut, 9- chain, 10- protection box, 11- first screw hole, 12- first screw, 13- first clamping plate, 14- second screw hole, 15- second screw, 16- second clamping plate, 17- folded edge, 18- handle. DETAILED DESCRIPTION

[0016] The utility model is described in detail below with reference to the accompanying drawings:

[0017] like Figure 1 and 2As shown, a climbing frame compression spring protection device includes a hanger 1, which is a conventional structure in an existing climbing frame. The hanger 1 is used to fix a connection chain and an electric hoist so that the frame of the climbing frame can be pulled up or lowered by the electric hoist and the chain. A horizontally arranged support plate 2 is installed on the hanger 1, and a first through hole 3 is provided on the support plate 2. A vertically arranged adjusting screw rod 4 is provided in the first through hole 3. The adjusting screw rod 4 can move up and down in the first through hole 3 in a vertical direction. A horizontally arranged pressure plate 5 is provided above the support plate 2, and a pressure plate 5 is provided on the pressure plate 5. A second through hole 6 is provided, and the adjusting screw rod 4 passes through the second through hole 6. A compression spring 7 is sleeved on the adjusting screw rod 4, and the compression spring 7 is located between the support plate 2 and the pressure plate 5. A nut 8 is sleeved on the adjusting screw rod 4, and the nut 8 is located on the upper side of the pressure plate 5. The adjusting screw rod 4 can transfer the tension to the pressure plate 5 through the nut 8, so that the pressure plate 5 moves downward to apply pressure to the compression spring 7, and compresses the compression spring 7. The bottom end of the adjusting screw rod 4 is connected to a chain 9, and an electric hoist is provided at the bottom end of the chain 9. The chain 9 and the electric hoist adopt the conventional setting method of the existing climbing frame, and the electric hoist is used. The reed and chain 9 pull the frame of the climbing frame to move, and a protective box 10 with an open bottom structure is provided on the support plate 2. The protective box 10 is sleeved on the adjusting screw rod 4 and the compression spring 7 is located inside the protective box 10. The protective box 10 can protect the compression spring 7 on the adjusting screw rod 4, which can effectively prevent the leaked cement from falling on the compression spring 7 during cement pouring, and can also prevent the compression spring 7 from rusting due to rain falling on the compression spring 7 when it rains. In order to fix the protective box 10, a first screw hole 11 is provided on the side wall of the protective box 10, and a first screw hole 11 is provided inside the first screw hole 11. Nail 12, the inner end of the first screw 12 is provided with a first clamping plate 13, the first clamping plate 13 abuts against the edge of the pressure plate 5, and at the same time, the side wall of the protective box 10 away from the first screw hole 11 is provided with a second screw hole 14, and the second screw hole 14 is provided with a second screw 15, and the inner end of the second screw 15 is provided with a second clamping plate 16, the second clamping plate 16 abuts against the edge of the pressure plate 5, the protective box 10 is supported on the pressure plate 5 by the first clamping plate 13 and the second clamping plate 16, and at the same time, it is convenient to remove the protective box 10 to repair or replace the compression spring 7.

[0018] The bottom edge of the protection box 10 is provided with an inclined folding edge 17, which can increase the protection area, and can protect the chain 9 connected to the bottom end of the adjusting screw rod 4 and the electric hoist arranged on the chain 9.

[0019] In order to facilitate installation and removal of the protection box 10 , a handle 18 is provided on the top of the protection box 10 .

[0020] The usage of the utility model is as follows:

[0021] When in use, it is only necessary to put the protective box 10 on the adjusting screw rod 4 from top to bottom, and then tighten the first screw 12 and the second screw 15, so that the first clamping plate 13 and the second clamping plate 16 are against the edge of the pressure plate 5 to support the protective box 10 on the pressure plate 5 to complete the installation of the protective box 10. When the concrete pouring operation is carried out, if concrete leakage occurs, the leaked concrete can be blocked by the protective box 10, effectively preventing the concrete from sticking to the compression spring 7 and damaging the compression spring 7. At the same time, the folded edge 17 can also protect the chain 9 and the electric hoist, effectively preventing the leaked concrete from falling on the chain 9. When the adjusting screw rod 4 needs to be adjusted or the compression spring 7 needs to be repaired, it is only necessary to loosen the first screw 12 and the second screw 15 to remove the protective box 10, and then perform the corresponding operation, which is convenient and quick.

[0022] In addition, when the compression spring 7 breaks accidentally, the splashes generated are confined in the sealed space in the protection box 10 to prevent injuries.

Claims

1. A climbing frame compression spring protection device, comprising a hanger (1), characterized in that: A support plate (2) is mounted on the hanger (1), the support plate (2) being provided with a first through hole (3), an adjusting screw rod (4) being arranged in the first through hole (3), a pressure plate (5) being arranged above the support plate (2), a second through hole (6) being arranged on the pressure plate (5), the adjusting screw rod (4) passing through the second through hole (6), a compression spring (7) being sleeved on the adjusting screw rod (4), the compression spring (7) being located between the support plate (2) and the pressure plate (5), a nut (8) being sleeved on the adjusting screw rod (4), the nut (8) being located on the upper side of the pressure plate (5), a chain (9) being connected to the bottom end of the adjusting screw rod (4), a protective box (10) having an open bottom structure being arranged on the support plate (2), the protective box (10) being sleeved on the adjusting screw rod (4) and the compression spring (7) being located inside the protective box (10).

2. A climbing frame compression spring protection device according to claim 1, characterized in that: A first screw hole (11) is provided on the side wall of the protection box (10), a first screw (12) is provided in the first screw hole (11), a first clamping plate (13) is provided at the inner end of the first screw (12), the first clamping plate (13) is pressed against the edge of the pressure plate (5), a second screw hole (14) is provided on the side wall of the protection box (10) away from the first screw hole (11), a second screw (15) is provided in the second screw hole (14), a second clamping plate (16) is provided at the inner end of the second screw (15), the second clamping plate (16) is pressed against the edge of the pressure plate (5).

3. A climbing frame compression spring protection device according to claim 1, characterized in that: The bottom edge of the protective box (10) is provided with an inclined folded edge (17).

4. A climbing frame compression spring protection device according to claim 1, characterized in that: The support plate (2) is arranged horizontally.

5. A climbing frame compression spring protection device according to claim 1, characterized in that: The adjusting screw rod (4) is arranged vertically.

6. A climbing frame compression spring protection device according to claim 1, characterized in that: The pressing plate (5) is arranged horizontally.

7. A climbing frame compression spring protection device according to claim 1, characterized in that: A handle (18) is provided on the top of the protection box (10).