Bridge construction drilling device
By designing mechanisms such as universal wheels, drive motors and cylinders in bridge construction, the height adjustment and automatic movement of the drilling device are achieved, and the manpower consumption and safety risks caused by drill bit vibration are solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202420829991.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-04-22
AI Technical Summary
During bridge construction, a large amount of vibration occurs during drilling, causing construction workers to hold on to the drilling bit tightly, consume a lot of manpower, reduce drilling efficiency and increase safety risks.
A bridge construction drilling device is designed, using universal wheels, drive motors, lead screws, cylinders and gear mechanisms to achieve height adjustment and stability of the drilling assembly, and automatically moves the drill bit through the cylinder to reduce manual operation.
It improves the convenience and safety of drilling equipment, frees up manpower, solves the problems of drilling position adjustment and stability, and improves construction efficiency and safety.
Smart Images

Figure CN222228460U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a drilling device for bridge construction. Background Art
[0002] Bridges generally refer to structures built on rivers, lakes, and seas to allow vehicles and pedestrians to pass smoothly. In order to adapt to the modern high-speed development of the transportation industry, bridges are also extended to buildings that cross mountain streams, poor geology, or meet other transportation needs to make passage more convenient. Bridges are generally composed of superstructures, substructures, supports, and auxiliary structures, and drilling devices are required in the longitudinal construction process of bridges.
[0003] Generally, the drilling machine used in the drilling process is mainly a drill bit, which is usually manually operated for drilling operations. A lot of vibrations will be generated when the drill bit is working, and the construction workers need to hold the drill bit tightly to ensure the integrity of the drill hole. Such operations will consume more manpower. After several drilling operations, the construction workers will become tired, and the drilling efficiency of the entire bridge construction will be greatly reduced. In addition, the locations of some drill holes are more biased, which will increase the difficulty of construction. The construction workers will be more tired during operation, and the drill bit may not be held, which may easily lead to safety problems. Utility Model Content
[0004] The technical problem to be solved by the utility model is that a large amount of vibration will be generated when the drill bit is working, and the construction personnel need to hold the drill bit tightly to ensure the integrity of the drill hole. Such operation will consume more manpower, time and effort.
[0005] In order to solve the above technical problems, a technical solution adopted by the utility model is: a bridge construction drilling device, comprising a base, the four lower ends of the base are fixedly connected with universal wheels, the interior of the base is fixedly connected with a second drive motor, the output end of the second drive motor passes through the base and is fixedly connected with a lead screw upward, the lead screw is threadedly connected with a thread block, the outer end of the thread block is fixedly connected with a U-shaped frame, and under the action of the threaded connection, the thread block can drive the outer U-shaped frame and the drilling assembly to adjust the height;
[0006] One upper end of the base is fixedly connected to two sliding rods, and a first sliding block is slidably connected to the sliding rods. The stability of the U-shaped frame during height adjustment can be ensured by providing the first sliding block.
[0007] Preferably, the first slider is fixedly connected to the U-shaped frame, and the first cylinders are fixedly connected to the outer ends of the U-shaped frame. Activating the first cylinder can drive the third slider to slide inside the second slide groove, thereby driving the drilling assembly to move.
[0008] Preferably, the extended end of the first cylinder passes through the U-shaped frame and is provided with a third sliding block inwardly, and second sliding grooves are provided at both ends of the inner side of the U-shaped frame, and the third sliding block is slidably connected inside the second sliding groove.
[0009] Preferably, the third sliding block passes through the second sliding groove and is fixedly connected inwardly with a connecting plate, the inner end of the connecting plate is fixedly connected to the first driving motor, and the output end of the first driving motor passes through the connecting plate and is provided with a drill bit for bridge construction outwardly, and starting the first driving motor can drive the drill bit to rotate, thereby drilling holes in the end face of the bridge.
[0010] Preferably, the upper end of the sliding rod is fixedly connected to a top plate, and the outer ends of the top plate and the base are both fixedly connected to a second cylinder, and the movable column can be driven to move by the second cylinder.
[0011] Preferably, a second slider is provided inwardly through the extended end of the second cylinder, a first slide groove is provided on the base and the top plate, the second slider is slidably connected in the first slide groove, and a movable column is fixedly connected between the two second sliders, and two first gears are fixedly connected to the movable column.
[0012] Preferably, two second gears are fixedly connected to the lead screw, and the first gear is meshed with the second gear. After the height adjustment is completed, starting the second cylinder at the outer end can drive the second slider and the movable column to slide on the first slide groove. At this time, the first gear can move to mesh with the second gear to achieve the locking operation of the lead screw and ensure the stability of the drilling assembly after the height adjustment.
[0013] The beneficial effects of the utility model are as follows:
[0014] 1. The utility model can facilitate the staff to move the entire drilling equipment by arranging universal wheels, thereby improving its convenience. At the same time, the driving assembly and the lead screw can enable the threaded block to drive the drilling assembly to be raised and lowered, and the height of the drill bit can be adjusted, thereby solving the problem of drilling at a higher or lower position. It is very convenient to use and frees up manpower. At the same time, the cylinder is used to drive the drill bit to move forward and backward to perform drilling. Manual operation of the drill bit is not required, which is safer than manual operation.
[0015] 2. The utility model can drive the movable column to move by setting a second cylinder, so that the first gear on the movable column can mesh with the second gear on the screw, thereby achieving limit locking of the screw and ensuring the stability of the drilling assembly after height adjustment. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a three-dimensional diagram of a bridge construction drilling device of the utility model;
[0017] Figure 2 This is a partial structural schematic diagram of a bridge construction drilling device of the utility model;
[0018] Figure 3 This is a front view of a bridge construction drilling device of the utility model;
[0019] Figure 4 It is a stereoscopic diagram of a screw rod and a second gear of a bridge construction drilling device of the utility model.
[0020] In the figure: 1, top plate; 2, slide rod; 3, U-shaped frame; 4, drill bit; 5, first slider; 6, base; 7, first slide groove; 8, second slider; 9, movable column; 10, threaded block; 11, lead screw; 12, first cylinder; 13, first drive motor; 14, third slider; 15, second slide groove; 16, connecting plate; 17, first gear; 18, second drive motor; 19, second gear; 20, universal wheel; 21, second cylinder. DETAILED DESCRIPTION
[0021] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.
[0022] See also Figure 1 and Figure 2 A bridge construction drilling device includes a base 6, and four ends of the bottom of the base 6 are fixedly connected with universal wheels 20. By setting the universal wheels 20, it is convenient for workers to move the entire device and improve the stability of the device. The inside of the base 6 is fixedly connected with a second drive motor 18, and the output end of the second drive motor 18 passes through the base 6 and is fixedly connected with a lead screw 11 upward. By starting the second drive motor 18, the lead screw 11 can be driven to rotate. A threaded block 10 is threadedly connected to the lead screw 11, and the outer end of the threaded block 10 is fixedly connected with a U-shaped frame 3. Under the action of the threaded connection, the threaded block 10 can drive the outer U-shaped frame 3 and the drilling assembly to adjust the height;
[0023] One end of the upper side of the base 6 is fixedly connected to two slide bars 2, and a first slide block 5 is slidably connected to the slide bar 2. The first slide block 5 is fixedly connected to the U-shaped frame 3, and the two ends of the outer side of the U-shaped frame 3 are fixedly connected to the first cylinder 12. By providing the first slide block 5, the stability of the U-shaped frame 3 during height adjustment can be ensured;
[0024] The extended end of the first cylinder 12 passes through the U-shaped frame 3 and is provided with a third slider 14 inwardly. The inner two ends of the U-shaped frame 3 are provided with second slide grooves 15. The third slider 14 is slidably connected to the inside of the second slide groove 15. By starting the first cylinder 12, the third slider 14 can be driven to slide in the second slide groove 15, thereby driving the drilling assembly to move. The third slider 14 passes through the second slide groove 15 and is fixedly connected to a connecting plate 16 inwardly. The inner end of the connecting plate 16 is fixedly connected to a first driving motor 13. The output end of the first driving motor 13 passes through the connecting plate 16 and is provided with a drill bit 4 for bridge construction outwardly. By starting the first driving motor 13, the drill bit 4 can be driven to rotate, thereby drilling holes on the end face of the bridge.
[0025] See also Figure 3 and Figure 4 The upper end of the slide rod 2 is fixedly connected to the top plate 1, and the outer ends of the top plate 1 and the base 6 are fixedly connected to the second cylinder 21. The extending end of the second cylinder 21 penetrates and is inwardly provided with a second slider 8. The base 6 and the top plate 1 are provided with a first slide groove 7. The second slider 8 is slidably connected to the first slide groove 7, and a movable column 9 is fixedly connected between the two second sliders 8. Two first gears 17 are fixedly connected to the movable column 9, and two second gears 19 are fixedly connected to the lead screw 11. The first gear 17 is meshed with the second gear 19. After the height adjustment is completed, starting the second cylinder 21 at the outer end can drive the second slider 8 and the movable column 9 to slide on the first slide groove 7. At this time, the first gear 17 can move to mesh with the second gear 19, thereby realizing the locking operation of the lead screw 11 and ensuring the stability of the drilling assembly after the height adjustment.
[0026] When the utility model is in use, the staff moves the entire device to a suitable position through the universal wheel 20 at the bottom, and then aligns the direction of the drill bit 4 with the end face of the bridge. At this time, starting the second driving motor 18 at the bottom can drive the lead screw 11 to rotate. Under the action of the threaded connection, the threaded block 10 can drive the U-shaped frame 3 and the drill bit 4 to adjust the height, ensuring that the drill bit 4 can be consistent with the drilling position on the end face of the bridge. After determining the height, starting the first cylinder 12 can drive the connecting plate 16 and the drill bit 4 to move horizontally, so that the drill bit 4 can contact the end face of the bridge. Subsequently, starting the internal first driving motor 13 can drive the drill bit 4 to rotate. Under the action of the drill bit 4, the drilling operation on the end face of the bridge can be achieved. The device can adjust the height of the drill bit 4, thereby solving the problem of drilling holes when the position is higher or lower. It is very convenient to use and liberates manpower. At the same time, the first cylinder 12 is used to drive the drill bit 4 to move forward and backward to drill holes. There is no need to manually operate the drill bit 4, which is safer than manual operation.
[0027] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A drilling device for bridge construction, comprising a base (6), characterized in that: The four lower ends of the base (6) are fixedly connected with universal wheels (20); the interior of the base (6) is fixedly connected with a second drive motor (18); the output end of the second drive motor (18) passes through the base (6) and is fixedly connected with a lead screw (11) upward; a threaded block (10) is threadedly connected to the lead screw (11); and the outer end of the threaded block (10) is fixedly connected with a U-shaped frame (3); Two sliding rods (2) are fixedly connected to one upper end of the base (6), and a first sliding block (5) is slidably connected to the sliding rod (2).
2. A bridge construction drilling device according to claim 1, characterized in that: The first sliding block (5) is fixedly connected to the U-shaped frame (3), and the first cylinder (12) is fixedly connected to both ends of the outer side of the U-shaped frame (3).
3. A bridge construction drilling device according to claim 2, characterized in that: The extended end of the first cylinder (12) passes through the U-shaped frame (3) and is provided with a third sliding block (14) inwardly, and the inner two ends of the U-shaped frame (3) are provided with second sliding grooves (15), and the third sliding block (14) is slidably connected inside the second sliding grooves (15).
4. A bridge construction drilling device according to claim 3, characterized in that: The third sliding block (14) passes through the second sliding groove (15) and is fixedly connected inwardly with a connecting plate (16); the inner end of the connecting plate (16) is fixedly connected with a first driving motor (13); and the output end of the first driving motor (13) passes through the connecting plate (16) and is provided with a drill bit (4) for bridge construction outwardly.
5. A bridge construction drilling device according to claim 1, characterized in that: The upper end of the sliding rod (2) is fixedly connected to a top plate (1), and the outer ends of the top plate (1) and the base (6) are both fixedly connected to a second cylinder (21).
6. A bridge construction drilling device according to claim 5, characterized in that: A second sliding block (8) is provided inwardly through the extended end of the second cylinder (21), and a first sliding groove (7) is provided on the base (6) and the top plate (1), the second sliding block (8) is slidably connected in the first sliding groove (7), and a movable column (9) is fixedly connected between the two second sliding blocks (8), and two first gears (17) are fixedly connected to the movable column (9).
7. A bridge construction drilling device according to claim 6, characterized in that: Two second gears (19) are fixedly connected to the lead screw (11), and the first gear (17) is meshed with the second gear (19).