Building construction wastewater recovery device
By designing building construction wastewater recycling devices for mobile components, recycling components and sedimented components, the problems of existing devices' recycling effects and inefficiency are solved, and more efficient wastewater collection and treatment are achieved.
Patent Information
- Application Number
- CN202421040605.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-14
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-05-14
AI Technical Summary
During the collection and recycling process of existing construction wastewater recycling devices, the sprayed water is widely distributed and the accumulation amount is small, resulting in low recycling effect and efficiency.
A device including a mobile component, a recycling component and a sedimentation component is designed. Through the mobile component, the recycling component collects wastewater from the ground and pools, and the sedimentation component precipitates wastewater to improve recycling efficiency.
It improves the convenience and work efficiency of construction wastewater recycling equipment, and ensures the effective collection and treatment of wastewater.
Smart Images

Figure CN222324558U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of wastewater recovery, in particular to a construction wastewater recovery device. Background Art
[0002] In construction projects, a large amount of water is needed to avoid dust, maintain equipment, and manufacture construction materials. Most of the water will remain on the ground or concentrate in pits after use. The retained water will accumulate a large amount of waste, causing pollution to the construction site environment and harm to the workers. Therefore, construction wastewater recovery equipment is needed. Most of the existing construction wastewater recovery equipment collects wastewater in accumulated pools, while water sprayed in the air for dust reduction is often widely distributed, and the accumulation amount at each location is small, which affects the recovery effect and efficiency. Utility Model Content
[0003] In order to overcome the problem in the process of wastewater recycling, most of the existing construction wastewater recovery devices collect wastewater in stored pools, and the water sprayed in the air for dust reduction is often widely distributed and has a small amount of accumulation, resulting in a decrease in the use effect and efficiency of the construction wastewater recovery device.
[0004] The technical solution of the utility model is: a construction wastewater recovery device, comprising a moving component, a recovery component and a sedimentation component; the recovery component is installed at the rear end of the moving component; and the sedimentation component is installed at the upper end of the moving component.
[0005] Preferably, a moving component is provided to drive the device to move so as to collect wastewater from different areas; a recovery component is provided to recover water scattered on the ground and accumulated in the pool; and a sedimentation component is provided to precipitate and treat the wastewater for subsequent treatment or use.
[0006] Preferably, the moving assembly includes a base body, a power motor, a power roller, a support roller, a track, a protective plate, a dual-axis motor, a transmission belt, a first cleaning roller and a second cleaning roller; a power motor is installed at the front end of the base body; a power roller is rotatably connected to the power motor shaft; a support roller is arranged on one side end of the power roller; tracks are installed on the outside of the power roller and the support roller; a protective plate is arranged on one side end of the power roller and the support roller; the power roller is driven to rotate by the power motor, and the track is driven to rotate by the support roller and the protective plate.
[0007] Preferably, a dual-axis motor is provided at the rear end of the power motor; a transmission belt is provided on the rotating shaft of the dual-axis motor; a first cleaning roller is provided on the inner side of the transmission belt; a second cleaning roller is provided at the rear end of the first cleaning roller; the transmission belt is driven by the dual-axis motor to drive the first cleaning roller and the second cleaning roller to rotate, so as to collect waste water on the ground.
[0008] Preferably, the recovery component includes a mounting frame, a diverter plate, a collecting trough, a mounting trough, a first liquid pump, a first collecting tube, a second liquid pump and a second collecting tube; a mounting frame is installed at the rear end of the base body; a diverter plate is fixedly connected to the lower end of the mounting frame; a collecting trough is provided at the rear end of the diverter plate; a mounting groove is provided at the upper end of the mounting frame; waste water is recovered through the diverter plate and the collecting trough to prevent leakage, and the first liquid pump is installed using the mounting groove.
[0009] Preferably, a first liquid pump is installed on the inner side of the installation tank; a first collecting tube is installed on the first liquid pump; a second liquid pump is arranged on the upper end of the first liquid pump; a second collecting tube is installed on the second liquid pump; the wastewater in the collecting tank is collected by the first liquid pump and the first collecting tube, and the wastewater in the water pool is collected by the second liquid pump and the second collecting tube, so as to send the wastewater into the sedimentation tank.
[0010] Preferably, the sedimentation assembly includes a sedimentation tank, a partition plate, a slide, a sliding frame, a filter plate, a first handle, a shielding plate, a second handle, a third liquid pump and a water outlet pipe; a sedimentation tank is arranged at the front end of the second liquid pump; a partition plate is fixedly connected to the inner side of the sedimentation tank; a slide is provided at the upper end of the partition plate; a sliding frame is slidably connected to the slide; a filter plate is slidably connected to the inner side of the sliding frame; a first handle is fixedly connected to one end of the filter plate; the wastewater in the sedimentation tank is separated by the partition plate, so that the filter plate can be used to filter the wastewater and improve the filtering effect, and the filter plate can be easily replaced by using the sliding frame and the first handle.
[0011] Preferably, a baffle is rotatably connected to one end of the sedimentation tank via a rotating shaft; a second handle is fixedly connected to the baffle; a third liquid pump is installed at the front end of the sedimentation tank; an outlet pipe is installed on the third liquid pump; the sedimentation tank is closed by the baffle to facilitate cleaning of waste deposited inside during maintenance, and the filtered water can be conveniently discharged using the third liquid pump and the outlet pipe.
[0012] Beneficial effects of the utility model:
[0013] 1. By setting a mobile platform and a connecting frame, the device is driven to move and recycle construction wastewater, and the water storage tank and the filter rack are used to filter the wastewater for subsequent treatment and use, so as to solve the problem that in the process of wastewater recycling, most of the existing construction wastewater recycling devices collect wastewater in the accumulated water tank, and the water sprayed in the air for dust reduction is often widely distributed and the accumulated amount is small, resulting in a decrease in the use effect and efficiency of the construction wastewater recycling device, thereby improving the convenience of use of the entire construction wastewater recycling device;
[0014] 2. By setting a base body and a mounting frame, the power motor is used to drive the power roller to rotate, and the support roller and the protection plate are used to drive the crawler to rotate, so as to drive the device to move in different areas, and the double-axis motor drives the transmission belt to drive the first cleaning roller and the second cleaning roller to rotate, so as to cooperate with the diversion plate and the collection tank to recover wastewater, and the first liquid pump and the second liquid pump are used to pump the construction wastewater, so as to send the wastewater to the sedimentation tank, thereby improving the convenience of use of the entire construction wastewater recovery device to a certain extent;
[0015] 3. By setting up a sedimentation tank and a partition plate, the wastewater in the sedimentation tank can be separated by the partition plate, the sliding frame and the filter plate, and the filter plate is used to filter the wastewater. At the same time, the sliding frame and the first handle can be used to conveniently replace the filter plate, so that the filtered water can be conveniently discharged by the third liquid pump and the outlet pipe. During maintenance, the sedimentation tank can be opened by rotating the baffle plate to clean the waste deposited inside, thereby improving the working efficiency of the entire construction wastewater recovery device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 What is shown is a three-dimensional structural schematic diagram of the construction wastewater recovery device of the utility model;
[0017] Figure 2 The present invention shows a partially cutaway three-dimensional structural schematic diagram of a mobile assembly of a construction wastewater recovery device of the present invention;
[0018] Figure 3 What is shown is a three-dimensional structural diagram of a recycling component of a construction wastewater recycling device of the utility model;
[0019] Figure 4 What is shown is a three-dimensional structural schematic diagram of the sedimentation component of the construction wastewater recovery device of the present utility model.
[0020] Explanation of the reference numerals: 1. Moving component; 2. Recovery component; 3. Sedimentation component; 101. Base body; 102. Power motor; 103. Power roller; 104. Support roller; 105. Track; 106. Protection plate; 107. Dual-axis motor; 108. Transmission belt; 109. First cleaning roller; 110. Second cleaning roller; 201. Mounting frame; 202. Diverter plate; 203. Collecting trough; 204. Mounting trough; 205. First liquid pump; 206. First collecting pipe; 207. Second liquid pump; 208. Second collecting pipe; 301. Sedimentation tank; 302. Partition plate; 303. Slide; 304. Sliding frame; 305. Filter plate; 306. First handle; 307. Shielding plate; 308. Second handle; 309. Third liquid pump; 310. Outlet pipe. DETAILED DESCRIPTION
[0021] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0022] See also Figure 1 The utility model provides an embodiment: a construction wastewater recovery device, comprising a moving component 1, a recovery component 2 and a sedimentation component 3; the recovery component 2 is installed at the rear end of the moving component 1; the sedimentation component 3 is installed at the upper end of the moving component 1.
[0023] See also Figure 2-3 In this embodiment, the moving assembly 1 includes a base body 101, a power motor 102, a power roller 103, a support roller 104, a crawler 105, a protection plate 106, a dual-axis motor 107, a transmission belt 108, a first cleaning roller 109 and a second cleaning roller 110; the power motor 102 is installed at the front end of the base body 101; the power roller 103 is rotatably connected to the rotating shaft of the power motor 102; a support roller 104 is provided at one side end of the power roller 103; crawlers 105 are installed on the outer sides of the power roller 103 and the support roller 104; A protective plate 106 is provided at one end of the power roller 103 and the support roller 104; a double-axis motor 107 is provided at the rear end of the power motor 102; a transmission belt 108 is provided on the rotating shaft of the double-axis motor 107; a first cleaning roller 109 is provided inside the transmission belt 108; a second cleaning roller 110 is provided at the rear end of the first cleaning roller 109; the recovery component 2 includes a mounting frame 201, a diverter plate 202, a collection tank 203, a mounting tank 204, a first liquid pump 205, a first collection pipe 206, a second liquid pump 207 and a second collection pipe 208; the base body 1 01 is provided with a mounting frame 201 at the rear end; a diverter plate 202 is fixedly connected to the lower end of the mounting frame 201; a collecting tank 203 is provided at the rear end of the diverter plate 202; a mounting tank 204 is provided at the upper end of the mounting frame 201; a first liquid pump 205 is provided inside the mounting tank 204; a first collecting tube 206 is provided on the first liquid pump 205; a second liquid pump 207 is provided at the upper end of the first liquid pump 205; a second collecting tube 208 is provided on the second liquid pump 207; the power roller 103 is driven to rotate by the power motor 102, and the support roller 104 and the protection plate 1 are used to support the power roller 103. 06 to drive the crawler 105 to rotate; the dual-axis motor 107 drives the transmission belt 108 to drive the first cleaning roller 109 and the second cleaning roller 110 to rotate, so as to collect the waste water on the ground; the diverter plate 202 and the collecting tank 203 are used to recover the waste water and prevent leakage, and the first liquid pump 205 is installed by the installation groove 204; the first liquid pump 205 and the first collecting pipe 206 are used to collect the waste water in the collecting tank 203, and the second liquid pump 207 and the second collecting pipe 208 are used to collect the waste water in the pool, so as to send the waste water to the sedimentation tank 301.
[0024] See also Figure 4In this embodiment, the sedimentation component 3 includes a sedimentation tank 301, a partition plate 302, a chute 303, a sliding frame 304, a filter plate 305, a first handle 306, a shielding plate 307, a second handle 308, a third liquid pump 309 and a water outlet pipe 310; the front end of the second liquid pump 207 is provided with a sedimentation tank 301; the inner side of the sedimentation tank 301 is fixedly connected with a partition plate 302; the upper end of the partition plate 302 is provided with a chute 303; the chute 303 is slidably connected with a sliding frame 304; the inner side of the sliding frame 304 is slidably connected with a filter plate 305; the first handle 306 is fixedly connected to one end of the filter plate 305; the sedimentation tank 301 is fixedly connected to one end of the first handle 306; The side end is rotatably connected to a baffle plate 307 via a rotating shaft; a second handle 308 is fixedly connected to the baffle plate 307; a third liquid pump 309 is installed at the front end of the sedimentation tank 301; an outlet pipe 310 is installed on the third liquid pump 309; the waste water in the sedimentation tank 301 is separated by a partition plate 302, so that the filter plate 305 can be used to filter the waste water and improve the filtering effect, and the sliding frame 304 and the first handle 306 are used to facilitate the replacement of the filter plate 305; the sedimentation tank 301 is closed by the baffle plate 307, so that the waste deposited inside can be cleaned during maintenance, and the filtered water can be conveniently discharged by the third liquid pump 309 and the outlet pipe 310.
[0025] During collection, first, the power roller 103 is driven to rotate by the power motor 102, and the crawler 105 is driven to rotate by the support roller 104 and the protection plate 106, so as to drive the device to move in different areas. Then, the transmission belt 108 is driven by the double-axis motor 107 to drive the first cleaning roller 109 and the second cleaning roller 110 to rotate, and the waste water is recovered and prevented from leaking through the diverter plate 202 and the collection tank 203. Then, the waste water in the collection tank 203 is collected by the first liquid pump 205 and the first collection pipe 206, and the waste water in the pool is collected by the second liquid pump 207 and the second collection pipe 208, so as to send the waste water to the sedimentation tank 301;
[0026] During filtering, the waste water in the sedimentation tank 301 is isolated by the partition plate 302, the sliding frame 304 and the filter plate 305. When the waste water accumulates in the first filtering area, the filter plate 305 is used to filter the waste water, and the third liquid pump 309 and the outlet pipe 310 are used to conveniently discharge the filtered water. During maintenance, the sedimentation tank 301 is opened by rotating the baffle plate 307 to facilitate cleaning of the waste deposited inside the sedimentation tank 301, and the filter plate 305 can be conveniently replaced by using the sliding frame 304 and the first handle 306.
[0027] Through the above steps, the base body 101, the power roller 103, the first cleaning roller 109 and the second cleaning roller 110 are set to drive the device to move so as to collect wastewater from different areas; the mounting frame 201, the first liquid pump 205 and the second liquid pump 207 are set to recover the water scattered on the ground and accumulated in the pool; the sedimentation tank 301 and the filter plate 305 are set to precipitate and treat the wastewater for subsequent treatment or use, so as to solve the problem in the process of wastewater recovery that most of the existing construction wastewater recovery devices collect wastewater in the accumulated pool, and the water sprayed in the air for dust reduction is often widely distributed and the accumulated amount is small, resulting in a decrease in the use effect and efficiency of the construction wastewater recovery device, thereby improving the convenience of use of the entire construction wastewater recovery device.
[0028] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.
Claims
1. A construction wastewater recovery device, comprising a mobile component (1); characterized in that: It also includes a recovery component (2) and a sedimentation component (3); the recovery component (2) is installed at the rear end of the moving component (1); and the sedimentation component (3) is installed at the upper end of the moving component (1).
2. A construction wastewater recovery device according to claim 1, characterized in that: The moving assembly (1) comprises a base body (101), a power motor (102), a power roller (103), a support roller (104), a crawler (105), a protective plate (106), a dual-axis motor (107), a transmission belt (108), a first cleaning roller (109) and a second cleaning roller (110); the power motor (102) is mounted on the front end of the base body (101); the power roller (103) is rotatably connected to the rotating shaft of the power motor (102); a support roller (104) is arranged at one side end of the power roller (103); crawlers (105) are mounted on the outer sides of the power roller (103) and the support roller (104); and a protective plate (106) is arranged at one side end of the power roller (103) and the support roller (104).
3. A construction wastewater recovery device according to claim 2, characterized in that: A double-shaft motor (107) is arranged at the rear end of the power motor (102); a transmission belt (108) is arranged on the rotating shaft of the double-shaft motor (107); a first cleaning roller (109) is arranged inside the transmission belt (108); and a second cleaning roller (110) is arranged at the rear end of the first cleaning roller (109).
4. A construction wastewater recovery device according to claim 2, characterized in that: The recovery component (2) comprises a mounting frame (201), a flow distribution plate (202), a collection tank (203), a mounting tank (204), a first liquid pump (205), a first collection tube (206), a second liquid pump (207) and a second collection tube (208); the mounting frame (201) is mounted on the rear end of the base body (101); the flow distribution plate (202) is fixedly connected to the lower end of the mounting frame (201); the collection tank (203) is provided at the rear end of the flow distribution plate (202); and the mounting tank (204) is provided on the upper end of the mounting frame (201).
5. A construction wastewater recovery device according to claim 4, characterized in that: A first liquid pump (205) is installed inside the installation groove (204); a first collecting tube (206) is installed on the first liquid pump (205); a second liquid pump (207) is provided at the upper end of the first liquid pump (205); and a second collecting tube (208) is installed on the second liquid pump (207).
6. A construction wastewater recovery device according to claim 5, characterized in that: The sedimentation assembly (3) comprises a sedimentation tank (301), a partition plate (302), a chute (303), a sliding frame (304), a filter plate (305), a first handle (306), a shielding plate (307), a second handle (308), a third liquid pump (309) and a water outlet pipe (310); the sedimentation tank (301) is arranged at the front end of the second liquid pump (207); the inner side of the sedimentation tank (301) is fixedly connected to the partition plate (302); the upper end of the partition plate (302) is provided with a chute (303); the chute (303) is slidably connected to the sliding frame (304); the inner side of the sliding frame (304) is slidably connected to the filter plate (305); and the first handle (306) is fixedly connected to one end of the filter plate (305).
7. A construction wastewater recovery device according to claim 6, characterized in that: A shielding plate (307) is rotatably connected to one end of the sedimentation tank (301) via a rotating shaft; a second handle (308) is fixedly connected to the shielding plate (307); a third liquid pump (309) is installed at the front end of the sedimentation tank (301); and a water outlet pipe (310) is installed on the third liquid pump (309).