By designing movable cable trench concrete pouring tools, the lifting mechanism and support mechanism are used to achieve stable pouring of concrete in complex terrain, solving the construction difficulty of pouring side walls of cable trench in narrow terrain, and improving construction efficiency and stability sex.
Patent Information
- Application Number
- CN202420881343.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2025-01-17
- Estimated Expiration
- 2034-04-25
AI Technical Summary
The construction of the side wall casting of cable pipe trench is difficult due to the small wall thickness and narrow terrain. It is difficult to effectively cast existing concrete pump trucks, especially when the terrain on one side of the side wall trench is low, it is difficult to achieve stable and efficient concrete casting.
A movable cable trench concrete pouring tool is designed, including a lifting mechanism, a pouring mechanism and a support mechanism. The height of the pouring mechanism is adjusted through the lifting mechanism, and combined with the universal wheel and hydraulic cylinder support plate to achieve stability in complex terrain and Flexible pouring.
It reduces construction difficulty, improves pouring efficiency and stability in narrow terrain, ensures that concrete can be pumped into the side wall grooves smoothly, reduces the risk of offset, and improves the convenience and safety of construction.
Smart Images

Figure CN222362488U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cable trench construction, in particular to a movable cable trench concrete pouring tool. Background Art
[0002] The side wall of the cable trench is cast by digging a trench for casting the side wall of the cable duct on the ground, and then building a template in the trench to form a casting trough, and pouring concrete into the trough to form the side wall. Due to the small thickness of the wall, it is impossible to use a hopper for casting. Concrete pump trucks are generally used for casting at the construction site. The volume of concrete required per linear meter is small, and large equipment such as concrete pump trucks are prone to narrow terrain. The terrain at both ends of the side wall casting trough is lower than the terrain of the casting trough slot, resulting in greater construction difficulty and inconvenient casting of the side wall of the cable trench. Utility Model Content
[0003] In order to adapt to the narrow terrain of the construction site and reduce the difficulty of construction, the present application provides a movable cable trench concrete pouring tool.
[0004] The above invention objectives of the present application are achieved through the following technical solutions:
[0005] A movable cable trench concrete pouring tool comprises a lifting mechanism, a pouring mechanism, a supporting mechanism and a universal wheel, wherein the universal wheel is fixedly connected to the bottom of the lifting mechanism, the pouring mechanism is installed on the upper surface of the lifting mechanism, the pouring mechanism comprises a tank body for storing concrete, a material pump and a discharge pipe, the tank body is fixed to the upper surface of a lifting plate, a discharge hole is opened at the bottom of the tank body, the material pump is fixedly connected to the bottom of the tank body and the material pump is connected to the tank body through the discharge hole, and the discharge pipe is connected to an end of the material pump away from the tank body.
[0006] By adopting the above technical solution, a smaller lifting mechanism is used to carry the pouring mechanism. When pouring the side wall of the cable trench, the lifting mechanism is pushed to move to one side of the side wall to be poured, and the pump is started to pump the concrete in the tank to the discharge pipe. The staff stands on the lifting mechanism and aligns the discharge pipe with the pouring trough for pouring. When encountering more complex terrain, such as where the horizontal height of one side of the casting trough is lower than the notch of the casting trough, the height of the pouring mechanism and the staff relative to the ground is adjusted by adjusting the lifting mechanism, so that the staff can align the discharge port with the pouring trough of the side wall, thereby reducing the difficulty of construction.
[0007] Optionally, the lifting mechanism includes a bracket, a lifting plate, a fixed plate and a driving assembly, the lifting plate is stacked on the upper surface of the fixed plate, the bracket passes through the lifting plate and the fixed plate in sequence, the lifting plate is slidably connected to the bracket, the fixed plate is fixedly connected to the bracket, the watering mechanism is fixedly connected to the upper surface of the lifting plate, and the driving assembly is used to drive the lifting plate to slide back and forth in the vertical direction of the bracket.
[0008] By adopting the above technical solution, the lifting plate provides a working platform for the staff and a fixed plane for the pouring mechanism. The driving component drives the lifting plate to slide in the vertical direction, so that the lifting plate slides back and forth along the vertical direction of the bracket, thereby making it convenient for the staff to cope with different terrain heights when working.
[0009] Optionally, the driving assembly includes a threaded rod and a motor, the threaded rod vertically passes through the lifting plate and the fixed plate in sequence, the lifting plate is threadedly connected to the threaded rod, the fixed plate is slidingly connected to the threaded rod, and the motor is coaxially fixed to one end of the threaded rod close to the ground.
[0010] By adopting the above technical solution, the motor drives the threaded rod to rotate, and the lifting plate slides along the vertical direction of the threaded rod, thereby realizing the adjustment of the height of the lifting plate.
[0011] Optionally, the bracket includes a plurality of cross bars and a plurality of vertical bars, the vertical bars sequentially passing through the lifting plate and the fixed plate in the vertical direction, the lifting plate is slidably connected to the vertical bars, the fixed plate is fixedly connected to the vertical bars, the cross bar is fixedly connected to one end of the vertical bar away from the fixed plate, and the cross bar is horizontally arranged between two adjacent vertical bars.
[0012] By adopting the above technical solution, the vertical rod realizes the sliding of the lifting plate, and the horizontal rod and the vertical rod form a guardrail to protect the watering mechanism and operators fixed on the surface of the lifting platform.
[0013] Optionally, the pouring mechanism further includes a support rod and a fixing rod, wherein the fixing rod is fixedly connected to both sides of the tank body, the support rod is vertically fixed to the surface of the lifting plate, and the discharge pipe is detachably connected to the top of the support rod.
[0014] By adopting the above technical solution, the fixing rod fixes the tank body on the upper surface of the lifting plate to protect and support the tank body.
[0015] Optionally, one end of the support rod away from the lifting platform is fixedly connected with a U-shaped placement groove.
[0016] By adopting the above technical solution, after the operator has used the discharge pipe, the discharge pipe is placed in the U-shaped groove at the top of the support rod to limit the discharge pipe and support the discharge pipe for the convenience of the operator to take, place and store it.
[0017] Optionally, the supporting mechanism includes a hydraulic cylinder and a supporting plate, the hydraulic cylinder is fixedly connected to a side of the fixing plate facing the ground, the supporting plate is fixedly connected to the bottom of the hydraulic cylinder, and when the hydraulic cylinder is extended to an extreme position, the universal wheel and the motor are both suspended in the air.
[0018] By adopting the above technical solution, the hydraulic cylinder presses down so that the support plate can be close to the ground, thereby increasing the stability of the casting tool and avoiding the deviation of the device during operation.
[0019] Optionally, a side of the support plate away from the hydraulic cylinder is provided with evenly distributed anti-skid spikes.
[0020] By adopting the above technical solution, when the support plate is pressed down, the spikes penetrate into the ground to increase the friction between the support plate and the ground, thereby increasing the gripping force of the support mechanism.
[0021] In summary, the present application includes at least one of the following beneficial technical effects:
[0022] 1. Use a smaller lifting mechanism to carry the pouring mechanism. When pouring the side wall of the cable trench, push the lifting mechanism to move to one side of the side wall to be poured, start the pump to pump the concrete in the tank to the discharge pipe, and the staff stand on the lifting mechanism and align the discharge pipe with the pouring trough for pouring. When encountering more complex terrain, such as where the horizontal height of one side of the casting trough is lower than the notch of the casting trough, the height of the pouring mechanism and the staff relative to the ground is adjusted by adjusting the lifting mechanism, which makes it easier for the staff to align the discharge port with the pouring trough of the side wall, reducing the difficulty of construction.
[0023] 2. The lifting plate provides a working platform for the staff and a fixed plane for the irrigation mechanism. The driving assembly drives the lifting plate to slide in the vertical direction, so that the lifting plate slides back and forth along the vertical direction of the bracket, so that the staff can cope with different terrain heights when working.
[0024] 3. After the pouring tool is moved to the designated position, the support mechanism is adjusted so that the support plate can be in close contact with the ground. When the support plate is pressed down, the spikes penetrate into the ground to increase the friction between the support plate and the ground, thereby increasing the stability of the device and avoiding the device from deviating during operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;
[0026] Figure 2 Schematic diagram of the lifting mechanism in the embodiment of the present application in the rising state;
[0027] Figure 3 is a schematic diagram of the structure of the support rod in an embodiment of the present application;
[0028] Figure 4 is a bottom view of an embodiment of the present application;
[0029] Figure 5 yes Figure 2 Enlarged view of part A.
[0030] Explanation of the reference numerals: 100, lifting mechanism; 110, bracket; 111, horizontal bar; 112, vertical bar; 120, lifting plate; 130, fixing plate; 140, driving assembly; 141, threaded rod; 142, motor; 200, pouring mechanism; 210, tank body; 211, discharge hole; 220, suction pump; 230, discharge pipe; 231, discharge port; 240, support rod; 250, U-shaped placement groove; 260, fixing rod; 300, universal wheel; 400, support mechanism; 410, hydraulic cylinder; 420, support plate; 421, anti-slip spikes; 500, handle. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-5 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0032] The present application embodiment discloses a movable cable trench concrete pouring tool. Figure 1 The movable cable trench concrete pouring tool comprises a pouring mechanism 200, a lifting mechanism 100 and a supporting mechanism 400. The lifting mechanism 100 is fixed with a handle 500 and a universal wheel 300, the handle 500 is located at one side of the lifting mechanism 100, the universal wheel 300 is located at the bottom of the lifting mechanism 100, the lifting mechanism 100 is placed on the ground, the pouring mechanism 200 is fixed to the upper surface of the lifting mechanism 100, the supporting mechanism 400 is fixed to the side of the lifting mechanism 100 facing the ground, and the supporting mechanism 400 is used to support the ground and hold up the lifting mechanism 100 and the pouring mechanism 200 when the pouring mechanism 200 is working.
[0033] Reference Figure 1 and Figure 2The lifting mechanism 100 includes a bracket 110, a lifting plate 120, a fixed plate 130 and a driving assembly 140. The bracket 110 includes four horizontal bars 111 and six vertical bars 112. The horizontal bar 111 is fixed to one end of the vertical bar 112 away from the fixed plate 130. The horizontal bar 111 is horizontally fixed between two adjacent vertical bars 112. The lifting plate 120 is stacked on the upper surface of the fixed plate 130. The vertical bars 112 pass through the lifting plate 120 and the fixed plate 130 in sequence. The lifting plate 120 is slidably connected to the vertical bars 112, and the fixed plate 130 is fixedly connected to the vertical bars 112. The horizontal bars 111 and the vertical bars 112 form a rectangular guardrail shape for protecting the watering mechanism 200 and the operator fixed on the surface of the lifting platform.
[0034] Reference Figure 1 and Figure 2 The driving assembly 140 includes a threaded rod 141, a motor 142 and a controller (not shown in the figure). The threaded rod 141 passes through the lifting plate 120 and the fixed plate 130 in sequence. The threaded rod 141 vertically passes through the lifting plate 120 and the fixed plate 130. The lifting plate 120 is threadedly connected with the threaded rod 141, and the fixed plate 130 is slidably connected with the threaded rod 141. The motor 142 is coaxially connected with the threaded rod 141. The motor 142 is fixed to one end of the threaded rod 141 close to the ground. The motor 142 drives the threaded rod 141 to rotate, so that the lifting plate 120 slides back and forth in the vertical direction. The controller is used to control the start and stop of the motor 142 and the forward and reverse rotation of the motor 142 to adjust the height of the lifting plate 120, so as to facilitate the staff to deal with different terrain heights during operation.
[0035] Reference Figure 1 and Figure 3 The pouring mechanism 200 includes a tank body 210, a pump 220, a support rod 240, a discharge pipe 230 and a discharge port 231. The tank body 210 is fixed to the upper surface of the lifting plate 120. The tank body 210 is used to store concrete. The tank body 210 is fixedly connected with fixed rods 260 on both sides. A discharge hole 211 is opened at the bottom of the tank body 210. The pump 220 is fixedly connected to the tank body 210 and the pump 220 is connected to the tank body 210 through the discharge hole 211. The discharge pipe 230 is connected to the end of the pump 220 away from the tank body 210. The discharge pipe 230 is detachably connected to the top of the support rod 240. The pump 220 pumps the concrete in the tank body 210 to the discharge pipe 230, and the discharge port 231 is aligned with the pouring trough of the side wall of the cable trench for pouring.
[0036] Reference Figure 4 and Figure 5The support mechanism 400 includes a hydraulic cylinder 410 and a support plate 420. The hydraulic cylinder 410 is fixedly connected to the side of the fixed plate 130 facing the ground, and the support plate 420 is fixedly connected to the bottom of the hydraulic cylinder 410. The side of the support plate away from the hydraulic cylinder 410 is provided with evenly distributed anti-slip spikes 421. When the casting tool reaches the specified position, the hydraulic cylinder 410 is started to press the support plate 420 downward, and the anti-slip spikes pierce the ground. When the hydraulic cylinder 410 is extended to the extreme position, the universal wheel 300 and the motor 142 are both suspended, and the operation is more stable.
[0037] The implementation principle of a movable cable trench concrete pouring tool in an embodiment of the present application is as follows: when the pouring tool arrives at the designated construction site, the hydraulic cylinder 410 is first started to press the support plate 420 downward to fix the pouring vehicle on the ground, and then the lifting plate 120 is adjusted according to the terrain to make the lifting plate 120 reach a suitable working height, and finally the pouring mechanism 200 fixed on the lifting plate 120 is started to operate.
[0038] After the pouring tool is fixed at the designated location, the motor 142 is started to drive the threaded rod 141 to rotate, so that the lifting plate 120 moves back and forth in the vertical direction. When the lifting plate 120 rises to a suitable working height, the motor 142 is paused through the controller, and the pump 220 pumps the concrete in the tank body 210 to the discharge pipe 230, and the discharge port 231 is aligned with the pouring trough of the side wall of the cable trench for pouring. This pouring method can greatly reduce the construction difficulty caused by narrow terrain.
[0039] The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Any feature disclosed in this specification (including the abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
Claims
1. A movable cable trench concrete pouring tool, characterized in that: The invention comprises a lifting mechanism (100), a pouring mechanism (200), a supporting mechanism (400) and a universal wheel (300), wherein the universal wheel (300) is fixedly connected to the bottom of the lifting mechanism (100), the pouring mechanism (200) is installed on the upper surface of the lifting mechanism (100), the pouring mechanism (200) comprises a tank body (210) for storing concrete, a material extraction pump (220) and a discharge pipe (230), the tank body (210) is fixed to the upper surface of a lifting plate (120), a discharge hole (211) is opened at the bottom of the tank body (210), the material extraction pump (220) is fixedly connected to the bottom of the tank body (210) and the material extraction pump (220) is connected to the tank body (210) through the discharge hole (211), and the discharge pipe (230) is connected to an end of the material extraction pump (220) away from the tank body (210).
2. A movable cable trench concrete pouring tool according to claim 1, characterized in that: The lifting mechanism (100) comprises a bracket (110), a lifting plate (120), a fixed plate (130) and a driving assembly (140); the lifting plate (120) is stacked on the upper surface of the fixed plate (130); the bracket (110) passes through the lifting plate (120) and the fixed plate (130) in sequence; the lifting plate (120) is slidably connected to the bracket (110); the fixed plate (130) is fixedly connected to the bracket (110); the watering mechanism (200) is fixedly connected to the upper surface of the lifting plate (120); and the driving assembly (140) is used to drive the lifting plate (120) to slide back and forth in the vertical direction of the bracket (110).
3. A movable cable trench concrete pouring tool according to claim 2, characterized in that: The driving assembly (140) comprises a threaded rod (141) and a motor (142); the threaded rod (141) vertically passes through the lifting plate (120) and the fixed plate (130) in sequence; the lifting plate (120) is threadedly connected to the threaded rod (141); the fixed plate (130) is slidably connected to the threaded rod (141); and the motor (142) is coaxially fixed to one end of the threaded rod (141) close to the ground.
4. A movable cable trench concrete pouring tool according to claim 2, characterized in that: The bracket (110) comprises a plurality of cross bars (111) and a plurality of vertical bars (112); the vertical bars (112) sequentially pass through the lifting plate (120) and the fixed plate (130) in a vertical direction; the lifting plate (120) is slidably connected to the vertical bars (112); the fixed plate (130) is fixedly connected to the vertical bars (112); the cross bar (111) is fixedly connected to one end of the vertical bar (112) away from the fixed plate (130); and the cross bar (111) is horizontally arranged between two adjacent vertical bars (112).
5. The movable cable trench concrete pouring tool according to claim 1, characterized in that: The watering mechanism (200) further comprises a support rod (240) and a fixing rod (260), wherein the fixing rod (260) is fixedly connected to both sides of the tank body (210), the support rod (240) is vertically fixed to the surface of the lifting plate (120), and the discharge pipe (230) is detachably connected to the top of the support rod (240).
6. A movable cable trench concrete pouring tool according to claim 5, characterized in that: One end of the support rod (240) away from the lifting platform is fixedly connected to a U-shaped placement groove (250).
7. A movable cable trench concrete pouring tool according to claim 2, characterized in that: The support mechanism (400) comprises a hydraulic cylinder (410) and a support plate (420); the hydraulic cylinder (410) is fixedly connected to a side of the fixed plate (130) facing the ground; the support plate (420) is fixedly connected to the bottom of the hydraulic cylinder (410); when the hydraulic cylinder (410) is extended to an extreme position, the universal wheel (300) and the motor (142) are both suspended in the air.
8. A movable cable trench concrete pouring tool according to claim 7, characterized in that: The side of the support plate away from the hydraulic cylinder (410) is provided with evenly distributed anti-skid spikes (421).