Prefabricated and assembled integral type underground comprehensive pipe gallery structure

Through the prefabricated assembly of the structure of the underground underground comprehensive pipe corridor, the combination of the connection and the screw is used to solve the problem of difficulty in the assembly and assembly of the conventional pipe gallery, and realize the rapid, stable and sealing assembly of the pipe gallery.

CN222390500UActive Publication Date: 2025-01-24SHANDONG YONGSHENG CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323297211.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-05
Publication Date
2025-01-24
Estimated Expiration
2033-12-05

AI Technical Summary

Technical Problem

During the docking and assembly process, conventional pipe corridors are difficult to assemble due to their high self-weight and difficult to align, which makes assembly difficult.

Method used

The prefabricated assembly rectifier underground comprehensive pipeline structure is adopted, including the corridor, the connection and sealing frame. By tightening the pairing cover inside the gallery body, and using the screw to tighten the connection to make it clamp the gallery body, to realize the tightly sealed seal of the two device galleries, fill the gap to facilitate assembly.

Benefits of technology

The problem of difficulty in assembly and assembly of the conventional pipe gallery has been solved, and the rapid, stable and sealing assembly of the corridor has been realized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390500U_ABST
    Figure CN222390500U_ABST
Patent Text Reader

Abstract

The utility model discloses a prefabricated and assembled integral type underground comprehensive pipe gallery structure, which belongs to the technical field of pipe galleries and comprises a gallery body, a butt joint sleeve is sleeved in the gallery body, and a sealing frame is clamped at the side end of the gallery body. The corridor body comprises a frame-shaped shell frame, buckling blocks are evenly and fixedly connected to the outer end of the frame-shaped shell frame, binding piles are fixedly connected to the inner side end of the frame-shaped shell frame, and blocking pieces are fixedly connected to the outer ends of the binding piles. And a guide surface is arranged at the lower end of the frame-shaped shell frame. The corridor body further comprises a check block, the check block is located below the binding piles, and the check block is fixedly connected with the frame-shaped shell frame. After the corridor body is hoisted to a target position, the butt joint sleeve is arranged in the corridor body in a sleeved mode, then screws penetrate through the butt joint sleeves of the two devices and are tightened, the screws are tightened to act on the butt joint sleeves, the butt joint sleeves are tightened to act on the corridor body, the corridor bodies of the two devices clamp the sealing frame, and the gap between the corridor bodies of the two devices is sealed through the sealing frame. And the corridor body is convenient to assemble.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pipe gallery, and in particular relates to a prefabricated and assembled integral underground comprehensive pipe gallery structure. Background Art

[0002] A pipe gallery is a corridor for pipelines. In chemical and related factories, many pipelines are gathered together and arranged along the outside of the equipment or factory buildings. They are usually in the air and supported by brackets to form a corridor-like appearance. A few pipe galleries are also located underground.

[0003] After conventional pipe corridors are placed in the excavated trench, in order to avoid collisions, a certain gap is usually reserved and then they are slowly pushed together. However, conventional pipe corridors have a relatively large deadweight and are difficult to align, which makes it difficult to assemble conventional pipe corridors together.

[0004] To this end, we proposed a prefabricated and assembled integrated underground comprehensive pipeline corridor structure to solve the above problems. Utility Model Content

[0005] The utility model aims to solve the problem that conventional pipe gallery butt joint assembly is difficult, and proposes a prefabricated assembly integral underground comprehensive pipe gallery structure.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] The prefabricated integrated underground integrated pipe gallery structure includes a gallery body, the interior of the gallery body is covered with a butt joint sleeve, and the side end of the gallery body is clamped with a sealing frame. After the gallery body is hoisted to the target location, the butt joint sleeve is placed inside the gallery body, and then screws are passed through the butt joint sleeves of two devices, and then the screws are tightened, and the screws are tightened to act on the butt joint sleeves, so that the butt joint sleeves are tightened on the gallery body, so that the gallery bodies of the two devices clamp the sealing frame, and the sealing frame seals the gap between the gallery bodies of the two devices, so as to facilitate the assembly of the gallery body.

[0008] Preferably, the gallery comprises a frame frame, the outer ends of the frame frame are evenly fixedly connected with buckle blocks, the inner side ends of the frame frame are fixedly connected with binding piles, and the outer ends of the binding piles are fixedly connected with baffles. After the frame frames of the two gallery bodies are lowered, the frame frames of the two gallery bodies are aligned and close to each other, the docking sleeves are put on the binding piles, and the screws are passed through the docking sleeves and tightened, so as to facilitate the assembly of the gallery body.

[0009] Preferably, a guide surface is provided at the lower end of the frame-shaped shell frame, and the guide surface is used to guide soil into the lower part of the frame-shaped shell frame, thereby reducing the possibility that soil hinders the splicing of the frame-shaped shell frame.

[0010] Preferably, the gallery body further comprises a stopper, the stopper is located under the restraining pile, and the stopper is fixedly connected to the frame-shaped shell frame. The stopper is used to limit the rotation range of the docking sleeve, so as to facilitate maintaining the angle of the docking sleeve after installation.

[0011] Preferably, the butt joint sleeve further comprises a collar and a mounting seat, and the collar is fixedly connected to the mounting seat. Screws are passed through the mounting seats of the two butt joint sleeves, and then the screws are tightened, and the screws are used to act inwardly on the mounting seats of the two butt joint sleeves, so that the two mounting seats move toward each other, and the butt joint sleeve acts on the gallery body, so that the two gallery bodies are conveniently tightened and closed.

[0012] Preferably, the butt joint sleeve further comprises a reinforcement block, which is fixedly connected between the collar and the mounting seat, and the reinforcement block is used to increase the firmness between the collar and the mounting seat.

[0013] Preferably, the sealing frame comprises a leather frame, and a buckle groove is provided at the outer end of the leather frame, and a buckle block is inserted into the buckle groove to improve the stability of the sealing frame and the gallery body.

[0014] In summary, the technical effects and advantages of the utility model are as follows:

[0015] 1. After hoisting the gallery to the target location, put the docking sleeve inside the gallery, then pass the screws through the docking sleeves of the two devices, and then tighten the screws. Use the screws to tighten the docking sleeves, so that the docking sleeves tighten the gallery, so that the gallery of the two devices clamps the sealing frame, so that the sealing frame seals the gap between the gallery of the two devices, which is convenient for assembling the gallery.

[0016] 2. After lowering the frame frames of the two galleries, make the frame frames of the two galleries correspond and close to each other, put the docking sleeves on the restraining piles, and then pass the screws through the docking sleeves and tighten them to facilitate the assembly of the galleries.

[0017] 3. Use the guide surface to guide the soil into the lower part of the frame shell to reduce the possibility of soil obstructing the splicing of the frame shell.

[0018] 4. Pass the screws through the mounting seats of the two docking sleeves, then tighten the screws, use the screws to act inward on the mounting seats of the two docking sleeves to move the two mounting seats toward each other, and act on the corridor body through the docking sleeves to facilitate the two corridor bodies to be tightened and closed. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0020] Figure 2 This is a schematic diagram of the corridor structure of the utility model;

[0021] Figure 3 This is a schematic diagram of the docking sleeve structure of the utility model;

[0022] Figure 4 This is a schematic diagram of the sealing frame structure of the utility model.

[0023] In the figure: 2, gallery; 3, docking sleeve; 4, sealing frame; 21, frame-shaped shell; 22, restraining piles; 23, baffles; 24, blocks; 25, guide surfaces; 26, buckle blocks; 31, collars; 32, mounting seats; 33, reinforcement blocks; 41, leather frame; 42, buckle grooves. DETAILED DESCRIPTION

[0024] The technical solutions in the utility model embodiments will be described clearly and completely below in conjunction with the drawings in the utility model embodiments. Obviously, the described embodiments are only part of the utility model embodiments, rather than all of the embodiments.

[0025] Reference Figure 1 The prefabricated and assembled integral underground comprehensive pipe gallery structure includes a gallery body 2, a docking sleeve 3 is sleeved inside the gallery body 2, and a sealing frame 4 is clamped at the side end of the gallery body 2.

[0026] Reference Figure 1 and 2 The gallery body 2 includes a frame frame 21, the outer end of the frame frame 21 is evenly fixedly connected with a buckle block 26, the inner side end of the frame frame 21 is fixedly connected with a binding pile 22, and the outer end of the binding pile 22 is fixedly connected with a baffle 23. After the frame frames 21 of the two gallery bodies 2 are lowered, the frame frames 21 of the two gallery bodies 2 are aligned and close to each other, the docking sleeve 3 is put on the binding pile 22, and then the screws are passed through the docking sleeve 3 to tighten.

[0027] Reference Figure 2 The lower end of the frame-shaped shell frame 21 is provided with a guide surface 25. The guide surface 25 is utilized to guide the soil to enter the lower part of the frame-shaped shell frame 21.

[0028] Reference Figure 1 and 2 The gallery body 2 further comprises a stopper 24, which is located under the binding pile 22 and is fixedly connected to the frame frame 21. The stopper 24 is used to limit the rotation range of the docking sleeve 3.

[0029] Reference Figure 1 , 2 3, the docking sleeve 3 also includes a collar 31 and a mounting seat 32, the collar 31 is movably sleeved on the tie pile 22, the baffle 23 is movably blocked outside the collar 31, and the collar 31 is fixedly connected to the mounting seat 32. Screws are passed through the mounting seats 32 of the two docking sleeves 3, and then the screws are tightened, and the screws are used to act inward on the mounting seats 32 of the two docking sleeves 3, so that the two mounting seats 32 move toward each other, and act on the corridor 2 through the docking sleeve 3.

[0030] Reference Figure 1 and 3The butt joint sleeve 3 further comprises a reinforcing block 33, which is fixedly connected between the collar 31 and the mounting seat 32. The reinforcing block 33 is used to increase the firmness between the collar 31 and the mounting seat 32.

[0031] Reference Figure 1 , 2 4, the sealing frame 4 includes a leather frame 41, and a buckle groove 42 is provided at the outer end of the leather frame 41. The leather frame 41 contacts the frame-shaped shell frame 21, and the buckle block 26 is inserted in the buckle groove 42.

[0032] Working principle: After the gallery body 2 is hoisted into the target location, the docking sleeve 3 is put into the interior of the gallery body 2, and then the screws are passed through the docking sleeves 3 of the two devices, and then the screws are tightened. The screws are tightened to act on the docking sleeves 3, so that the docking sleeves 3 are tightened on the gallery body 2, so that the gallery bodies 2 of the two devices clamp the sealing frame 4, so that the sealing frame 4 seals the gap between the gallery bodies 2 of the two devices, and the gallery body 2 is assembled.

[0033] The above is only a preferred specific implementation method of the utility model, but the protection scope of the utility model is not limited to it. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the utility model according to the technical scheme and utility model concept of the utility model, which should be covered by the protection scope of the utility model.

[0034] The description briefly mentions the application direction of the utility model for the prior art that is known to those skilled in the art and has not been changed, and combines it with the utility model to form a complete technology; the description avoids over-popularizing the technology familiar to those skilled in the art, and is used to assist those skilled in the art to quickly understand the main content of the utility model.

Claims

1. Prefabricated integrated underground pipe gallery structure, characterized by: The invention comprises a gallery body (2), wherein a docking sleeve (3) is sleeved inside the gallery body (2), and a sealing frame (4) is clamped at the side end of the gallery body (2); the gallery body (2) comprises a frame-shaped shell frame (21), the outer end of the frame-shaped shell frame (21) is evenly fixedly connected with a buckle block (26), and the inner side end of the frame-shaped shell frame (21) is fixedly connected with a restraining pile (22); the docking sleeve (3) also comprises a collar (31) and a mounting seat (32), the collar (31) is fixedly connected with the mounting seat (32), and the collar (31) is movably sleeved on the restraining pile (22).

2. The prefabricated integrated underground utility corridor structure according to claim 1 is characterized in that: A blocking piece (23) is fixedly connected to the outer end of the restraining pile (22).

3. The prefabricated integrated underground utility corridor structure according to claim 2 is characterized in that: A guide surface (25) is provided at the lower end of the frame-shaped housing (21).

4. The prefabricated integrated underground utility corridor structure according to claim 2 is characterized in that: The gallery body (2) further comprises a stopper (24), wherein the stopper (24) is located under the restraining pile (22), and the stopper (24) is fixedly connected to the frame-shaped shell (21).

5. The prefabricated integrated underground utility corridor structure according to claim 1 is characterized in that: The docking sleeve (3) further comprises a reinforcement block (33), wherein the reinforcement block (33) is fixedly connected between the collar (31) and the mounting seat (32).

6. The prefabricated integrated underground utility corridor structure according to claim 1 is characterized in that: The sealing frame (4) comprises a leather frame (41), and a buckle groove (42) is provided at the outer end of the leather frame (41).