Template device for pipeline plugging construction

By designing a template device for pipeline blocking, the problem of complexity and cost of construction in existing technologies has been solved, and the effect of rapid blocking and saving costs is achieved.

CN222392317UActive Publication Date: 2025-01-24THREE GORGES GREEN DEV CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421229564.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-01-24
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The existing pipeline sealing methods require water extraction and drainage and temporary sealing during construction, and water must be carried out after the concrete reaches the design strength, resulting in increased construction complexity and cost.

Method used

Design a template device, including the first steel mold and the second steel mold. It can be prepared in front of the processing plant through the screw connection. The site is quickly assembled. Water can be used, and the water level only needs to reduce the water level when the water level is higher than the template.

Benefits of technology

The rapid blocking construction has been achieved, the loss of blocking, inverted and stopping, and reducing the difficulty of investment and coordination of construction personnel, and saving costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222392317U_ABST
    Figure CN222392317U_ABST
Patent Text Reader

Abstract

The utility model discloses a formwork device for pipeline plugging construction, which comprises a first steel formwork, the first steel formwork comprises a back plate, and the side edge of the back plate is vertically connected with a plurality of side wing plates; a second steel die is connected to the surface of one side of the first steel die through a screw and extends into the pipeline to be matched with the pipeline. The utility model has the characteristics that the site construction speed is high, processing is carried out in a processing factory before plugging, a template does not need to be erected on site, and concrete side pressure can be supported by virtue of the rigidity of the template; when the water level in the pipeline is not higher than the template, water-carrying operation can be carried out without pumping drainage and temporary plugging; when the water level of the pipeline is higher than the template, the water level is lowered below the elevation line of the template by pumping drainage, and the original pipeline can still maintain operation; the washing surface of water is a steel plate surface without waiting the concrete strength to reach the design strength; and meanwhile, the cost can be saved, losses such as plugging, inverted drainage and shutdown compensation are reduced, the investment of constructors is reduced, and the difficulty in the aspect of coordination is also reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of municipal pipeline grooving construction, and more specifically relates to a template device used for pipeline plugging construction. Background Art

[0002] There are many existing methods for permanent pipe plugging, including brickwork plugging, cast-in-place concrete plugging, etc. During the plugging period, the water in the pipe needs to be pumped out and temporarily plugged with air bags, and water can only be passed after the brick wall and concrete reach the designed strength. When part of the pipeline network does not meet the conditions for temporary plugging and the pipeline still needs to be kept running during construction, the above methods will no longer be feasible. Therefore, it is necessary to design a template device for pipeline plugging construction to solve the above problems. Summary of the invention

[0003] The purpose of the utility model is to provide a template device for pipeline plugging construction, which has fast on-site construction speed and is processed in a processing plant before plugging. There is no need to set up the template on site, and the template's own rigidity can be relied on to support the lateral pressure of concrete; when the water level in the pipeline is not higher than the template, water can be used for operation without pumping and temporary plugging; when the water level in the pipeline is higher than the template, it only needs to be pumped down to below the template elevation line, and the original pipeline can still maintain operation; there is no need to wait for the concrete strength to reach the designed strength, and the water scouring surface is the steel plate surface; at the same time, it can save costs, reduce losses such as plugging, backflow, and shutdown compensation, reduce the investment of construction personnel, and reduce the difficulty of coordination.

[0004] In order to realize the above technical features, the technical solution adopted by the utility model is:

[0005] A template device for pipeline plugging construction includes a first steel mold, the first steel mold includes a back plate, and a plurality of side wing plates are vertically connected to the side of the back plate; a second steel mold is connected to a side surface of the first steel mold through a screw rod, and the second steel mold extends into the interior of the pipeline to cooperate with the pipeline.

[0006] Preferably, the back plate of the first steel mold is a rectangular structure, and the side length of the back plate is greater than the diameter of the pipe; the side wing plates are rectangular structures; and the side wing plates at the bottom are in contact with and cooperate with the bottom of the well chamber.

[0007] Preferably, an armpit corner brace is connected between the back panel and the side wing panels.

[0008] Preferably, a plurality of first bolt holes with oblong hole structures are provided on the surface of the back plate.

[0009] Preferably, the second steel mold is a circular structure with a diameter smaller than the diameter of the pipe.

[0010] Preferably, a plurality of second bolt holes with circular hole structures are opened on the surface of the second steel mold, and the second bolt holes are connected to the first bolt holes of the first steel mold through screw rods.

[0011] The beneficial effects of the utility model are:

[0012] The utility model has a fast on-site construction speed, and is processed in the processing plant before plugging. There is no need to set up templates on site, and the template's own rigidity can be relied on to support the concrete lateral pressure. When the water level in the pipeline is not higher than the template, it can be operated with water, without pumping and temporary plugging. When the water level in the pipeline is higher than the template, it only needs to be pumped down to below the template elevation line, and the original pipeline can still maintain operation. There is no need to wait for the concrete strength to reach the design strength, and the water flushing surface is the steel plate surface. It saves costs, reduces losses such as plugging, reverse discharge, and shutdown compensation, and reduces the investment of construction personnel; it also reduces the difficulty of coordination. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0014] Figure 1 It is a schematic diagram of the utility model when in use;

[0015] Figure 2 It is a main schematic diagram of the overall template of the utility model after being assembled;

[0016] Figure 3 It is a schematic diagram of the main view of the second steel mold in the utility model;

[0017] Figure 4 It is a schematic diagram of the main view of the first steel mold in the utility model;

[0018] Figure 5 It is a side view schematic diagram of the whole template after being assembled in the utility model;

[0019] In the figure: a first steel mold 1, a back plate 11, a side wing plate 12, an armpit angle brace 13, a second steel mold 2, a screw rod 3, a first bolt hole 4, a pipe 5, a well chamber 6, and a second bolt hole 7. DETAILED DESCRIPTION

[0020] Embodiment 1:

[0021] like Figure 1~Figure 5 A template device for pipeline plugging construction includes a first steel mold 1, the first steel mold 1 includes a back plate 11, and a plurality of side wing plates 12 are vertically connected to the side of the back plate 11; a second steel mold 2 is connected to a side surface of the first steel mold 1 through a screw 3, and the second steel mold 2 extends into a pipeline 5 and cooperates with the pipeline 5.

[0022] Preferably, the back plate 11 of the first steel mold 1 is a rectangular structure, and the side length of the back plate 11 is greater than the diameter of the pipe 5; the side wing plate 12 is a rectangular structure; and the side wing plate 12 at the bottom is in contact with the bottom of the well chamber 6.

[0023] Preferably, an armpit diagonal brace 13 is connected between the back plate 11 and the side wing plate 12 .

[0024] Preferably, a plurality of first bolt holes 4 with an oblong hole structure are formed on the surface of the back plate 11 .

[0025] Preferably, the second steel mold 2 is a circular structure with a diameter smaller than the diameter of the pipe 5 .

[0026] Preferably, a plurality of second bolt holes 7 with circular hole structures are opened on the surface of the second steel mold 2 , and the second bolt holes 7 are connected to the first bolt holes 4 of the first steel mold 1 through the screw rods 3 .

[0027] Preferably, a construction method of a pipeline 5 rapid permanent plugging structure comprises:

[0028] S1, the steel mold is processed and formed, and the first steel mold 1 and the second steel mold 2 are connected by screws 3 according to a predetermined structure to form an integral template;

[0029] S2, transporting the integral formwork to the construction site, and then breaking and excavating the road surface and earthwork above the well chamber 6;

[0030] S3, after the top of the well chamber 6 is excavated, the cover of the well chamber 6 is opened to measure the height difference between the bottom plate of the well chamber 6 and the pipe opening;

[0031] S4, hoisting the whole template to the bottom plate of the well chamber 6, and then adjusting the locking position between the screw rod 3 and the oblong hole of the first bolt hole 4 according to the measured height difference between the bottom plate of the well chamber 6 and the pipe mouth, thereby fine-tuning the height of the second steel mold 2 relative to the pipe 5, so that the second steel mold 2 can be aligned and extended into the inside of the pipe 5;

[0032] S5, according to the underwater concrete pouring process, the concrete conduit is extended into the integral formwork, and the conduit is lifted while pouring, thereby completing the concrete pouring;

[0033] S6, restore the well chamber 6 cover plate and manhole shaft dismantled in the early stage to complete the construction.

[0034] Preferably, in step S4, if the height difference exceeds the adjustable length of the first bolt hole 4 of the oblong hole, a steel plate is welded to the first steel mold 1 to lengthen it.

[0035] Furthermore, according to the underwater concrete pouring process, the concrete conduit must be extended into the formwork, 30 cm away from the bottom of the well. A soft conduit can be used, which can be lifted during pouring. The conduit should be no higher than 30 cm from the concrete surface. The underwater concrete should be one level higher than the design grade.

[0036] Embodiment 2:

[0037] This embodiment provides a processing method for a template device used for pipeline plugging construction:

[0038] 1: The first steel mold 1 is an 8mm thick steel plate, the side length of which is 200mm larger than the diameter of the pipe 5; the side wing plate 12 is an 8mm thick steel plate, with a width of 30cm; the side wing steel plate and the steel mold are fully welded into a whole;

[0039] 2: The second steel mold 2: 8mm thick steel plate, the diameter is 20mm smaller than the diameter of the pipe 5;

[0040] 3: Axillary angle brace 13: L50mm×50mm angle steel brace, the angle steel is welded with the main plate and side wing plate 12 of the steel mold B block;

[0041] 4: Second bolt hole 7: M12 screw rod 3 hole, round hole, the hole diameter is 2mm larger than the screw rod 3 diameter;

[0042] 5: First bolt hole 4: M12 screw rod 3 hole, an oblong hole that can move up and down, the hole diameter is 2mm larger than the screw rod 3 diameter, and the hole length is 50mm;

[0043] 6: Screw 3: M12 screw 3, 20cm long, connects steel mold block A and block B, and is fixed by tightening the nut or directly welded;

[0044] The steel mold block A and the steel mold block B are connected into a whole through screw rods 3 bolts or welding, and the welded steel mold is hoisted into the well chamber 6, embedded in the pipe mouth that needs to be blocked, and poured with concrete to complete permanent blocking.

[0045] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A template device for pipeline plugging construction, characterized in that: The first steel mold (1) comprises a first steel mold (1), the first steel mold (1) comprises a back plate (11), and a plurality of side wing plates (12) are vertically connected to the side of the back plate (11); a second steel mold (2) is connected to a surface of one side of the first steel mold (1) via a screw (3), and the second steel mold (2) extends into the interior of a pipe (5) and cooperates with the pipe (5); the back plate (11) of the first steel mold (1) is a rectangular structure, and the side length of the back plate (11) is greater than the diameter of the pipe (5); the side wing plates (12) are rectangular structures; and the side wing plates (12) at the bottom are in contact with and cooperate with the bottom of the well chamber (6).

2. A template device for pipeline plugging construction according to claim 1, characterized in that: An armpit diagonal brace (13) is connected between the back plate (11) and the side wing plate (12).

3. A template device for pipeline plugging construction according to claim 1, characterized in that: A plurality of first bolt holes (4) with an oblong hole structure are provided on the surface of the back plate (11).

4. A template device for pipeline plugging construction according to claim 1, characterized in that: The second steel mold (2) is a circular structure, and its diameter is smaller than the diameter of the pipe (5).

5. A template device for pipeline plugging construction according to claim 1, characterized in that: A plurality of second bolt holes (7) with a circular hole structure are provided on the surface of the second steel mould (2); the second bolt holes (7) are connected to the first bolt holes (4) of the first steel mould (1) via screw rods (3).