Purification tower for efficiently purifying acid gas in flue gas
By designing an efficient purification tower that contains the main body of the purification tower, the conveyor tube, the adjustment tube, and the squeezing installation shell, it solves the problem of timely the equipment operation of the equipment when the phenomenon of the inner wall of the conveyor pipe is tested. Improve the functionality of the purification tower.
Patent Information
- Application Number
- CN202421056499.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-15
AI Technical Summary
When using a purification tower to efficiently purify the acid gas in the flue gas, regularly checking whether there is agglomeration in the inner wall of the conveying pipe requires the equipment to be suspended, resulting in the purification tower being unable to continue to transport and purify the flue gas, affecting the gas treatment efficiency and production progress.
A purification tower with an efficient purification of acidic gas in the flue gas includes the main body of the purification tower, the first conveyor tube, the second conveyor tube, the first regulating pipe, the second regulating pipe, the squeezing installation shell and the connection rod. Through the design of these components, the purification tower can still purify the exhaust gas normally when the second adjustment pipe is inspected to ensure that the exhaust gas is transported stably.
The normal operation of the purification tower is not affected when checking the second adjustment pipe, the functionality of the purification tower is improved, the stable transportation and purification of the exhaust gas is ensured, and the impact of the production activities is reduced.
Smart Images

Figure CN222400927U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of purification towers, in particular to a purification tower for efficiently purifying acidic gases in flue gas. Background Art
[0002] The purification tower is a specially designed device that is equipped with corresponding agents for different types of waste gas. By adopting wet treatment technology, the purification tower can efficiently remove pollutants from a variety of toxic and harmful waste gases. When treating flue gas, the purification tower also plays an important role. It can effectively purify the acidic gas in the flue gas and ensure that the discharged flue gas meets environmental protection standards. Therefore, the purification tower has broad application prospects in the field of environmental protection.
[0003] When using a purification tower to efficiently purify acidic gases in flue gas, in order to ensure the normal operation and purification effect of the equipment, we will regularly inspect the inner wall of the delivery pipe to check for caking. However, this process requires the suspension of the operation of the purification tower. Therefore, during the inspection, the purification tower will not be able to continue to transport and purify the flue gas, which will undoubtedly reduce its functionality and may also affect the overall gas treatment efficiency and the production progress of the factory. In order to minimize this impact, we usually choose to conduct such inspections during the period when the factory production load is lower, so as to ensure that while ensuring equipment maintenance, the impact on production activities is minimized.
[0004] Therefore, it is necessary to provide a new purification tower for efficiently purifying acidic gases in flue gas to solve the above technical problems. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides a purification tower for efficiently purifying acidic gases in flue gas.
[0006] The utility model provides a purification tower for efficiently purifying acidic gases in flue gas, comprising: a purification tower body, a first delivery pipe, a second delivery pipe, a first regulating pipe, a second regulating pipe, an extruded mounting shell and a connecting rod, wherein the first delivery pipe is fixedly connected to one side of the purification tower body, the second delivery pipe is arranged on one side of the first delivery pipe, the first regulating pipe is fixedly connected to the upper surfaces of the first delivery pipe and the second delivery pipe, and the first delivery pipe, the second delivery pipe and the first regulating pipe are internally connected, the second regulating pipe is arranged between the first delivery pipe and the second delivery pipe, and the second regulating pipe is located below the first regulating pipe, the first delivery pipe and the second delivery pipe are symmetrically provided with extruded mounting shells at the bottom, and the two extruded mounting shells are fixedly connected to the bottoms of the connecting rods.
[0007] The first delivery pipe, the second delivery pipe and the second regulating pipe are connected to facilitate the exhaust gas to enter the interior of the purification tower body. When the second regulating pipe is moved away from the first delivery pipe and the second delivery pipe, the first delivery pipe and the second delivery pipe are blocked on one side close to the second regulating pipe. The exhaust gas enters the interior of the purification tower body through the first delivery pipe, the second delivery pipe and the first regulating pipe. When the second regulating pipe is inspected, the purification tower body can still purify the exhaust gas normally to ensure stable exhaust gas transportation.
[0008] Preferably, a limiting plate is symmetrically fixedly connected to a surface of one side of the second adjusting tube, and a sealing plate is symmetrically fixedly connected to a surface of a side of the second adjusting tube away from the limiting plate.
[0009] The extrusion mechanism on the inner wall of the extrusion installation shell enters the rectangular groove of the limiting plate, firmly connects the first delivery pipe, the second delivery pipe and the second regulating pipe, separates the second regulating pipe from the first delivery pipe and the second delivery pipe, and when the extrusion mechanism inside the extrusion installation shell enters the rectangular groove of the sealing plate, the first delivery pipe and the second delivery pipe are blocked on one side close to the second regulating pipe, so as to facilitate the exhaust gas to enter the main body of the purification tower through the first delivery pipe, the second delivery pipe and the first regulating pipe.
[0010] Preferably, a telescopic tube is symmetrically and slidably installed inside the second adjusting tube, and sliding grooves are symmetrically opened on the upper and lower surfaces of the second adjusting tube. Moving blocks are symmetrically and fixedly connected to the surfaces of the two telescopic tubes, and the moving blocks slide on the inner walls of the sliding grooves. A spring is fixedly connected to the surface of the moving block, and the side of the spring away from the moving block is fixedly connected to the inner wall of the sliding groove.
[0011] When the first conveying pipe, the second conveying pipe and the second adjusting pipe are firmly connected, the telescopic pipe enters the first conveying pipe and the second conveying pipe, blocks the two sides of the first adjusting pipe, pulls the moving block on the inner wall of the slide groove, and the moving block retracts the telescopic pipe into the second adjusting pipe. The moving block squeezes the spring to contract, making it convenient to move the second adjusting pipe away from the first conveying pipe and the second conveying pipe.
[0012] Preferably, a connecting seat is fixedly connected to the top of the two extruded mounting shells, and the upper surface of the connecting seat is fixedly connected to the bottom of the first conveying pipe and the second conveying pipe.
[0013] The extrusion installation shell firmly connects the first delivery pipe and the second delivery pipe. When the extrusion mechanism inside the extrusion installation shell firmly connects the first delivery pipe, the second delivery pipe and the second regulating pipe, it is convenient for the exhaust gas to enter the purification tower body through the first delivery pipe, the second delivery pipe and the second regulating pipe.
[0014] Preferably, the inner walls of the two rectangular grooves of the extrusion mounting shells are rotatably connected with a bidirectional screw rod, the inner walls of the two rectangular grooves of the extrusion mounting shells are slidably connected with an extrusion rod, a linkage groove is opened on the surface of the extrusion rod, the threaded surface of the bidirectional screw rod is meshed with the inner wall of the linkage groove, and the center surface of the bidirectional screw rod round rod is fixedly connected with a rotating block.
[0015] Rotate the rotating block to drive the bidirectional screw to rotate on the inner wall of the rectangular groove of the extrusion mounting shell. The threaded surface of the bidirectional screw contacts the inner wall of the linkage groove, driving the extrusion rods to approach each other. The extrusion rods enter the rectangular groove of the limiting plate or the sealing plate, making it convenient for the exhaust gas to enter the purification tower body through the first delivery pipe, the second delivery pipe and the first regulating pipe, or for the exhaust gas to enter the purification tower body through the first delivery pipe, the second delivery pipe and the second regulating pipe. When checking the second regulating pipe, the purification tower body can still purify the exhaust gas.
[0016] Preferably, the connecting rod is made of steel alloy material.
[0017] The steel alloy material has high physical strength and high bending resistance. When the connecting rod supports the extrusion mounting shell, the connecting rod will not be easily squeezed and deformed. When the surface of the connecting rod is collided, the surface of the connecting rod will not be easily worn or dented.
[0018] Compared with the related art, the purification tower for efficiently purifying acidic gases in flue gas provided by the utility model has the following beneficial effects:
[0019] The utility model provides a purification tower for efficiently purifying acidic gases in flue gas:
[0020] 1. By installing the purification tower body, the first delivery pipe, the second delivery pipe, the first regulating pipe, the second regulating pipe, the extrusion installation shell and the connecting rod, when the second regulating pipe is inspected, the purification tower body can still purify the exhaust gas, thereby improving the functionality of the purification tower body.
[0021] 2. A connection seat is fixedly connected to the top of two extrusion installation shells, and the upper surface of the connection seat is fixedly connected to the bottom of the first delivery pipe and the second delivery pipe. The extrusion installation shell firmly connects the first delivery pipe and the second delivery pipe, and the extrusion mechanism inside the extrusion installation shell firmly connects the first delivery pipe, the second delivery pipe and the second regulating pipe, so that the exhaust gas can enter the main body of the purification tower through the first delivery pipe, the second delivery pipe and the second regulating pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The overall structural diagram provided by the utility model;
[0023] Figure 2 A schematic cross-sectional view of a first delivery pipe, a second delivery pipe and a first regulating pipe provided by the utility model;
[0024] Figure 3 A schematic cross-sectional view of a second regulating tube provided by the utility model;
[0025] Figure 4 This is an enlarged schematic diagram of the extrusion installation shell provided by the utility model.
[0026] Numbers in the figure: 1. purification tower body; 2. first delivery pipe; 3. second delivery pipe; 4. first adjustment pipe; 5. second adjustment pipe; 6. extrusion mounting shell; 7. connecting rod; 8. limit plate; 9. sealing plate; 10. telescopic tube; 11. slide groove; 12. moving block; 13. spring; 14. connecting seat; 15. bidirectional screw rod; 16. extrusion rod; 17. linkage groove; 18. rotating block. DETAILED DESCRIPTION
[0027] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0028] Please refer to Figure 1 , Figure 2 , Figure 3 and Figure 4 A purification tower for efficiently purifying acidic gases in flue gas includes: a purification tower body 1, a first delivery pipe 2, a second delivery pipe 3, a first regulating pipe 4, a second regulating pipe 5, an extruded mounting shell 6 and a connecting rod 7. The first delivery pipe 2 is fixedly connected to one side of the purification tower body 1, and the second delivery pipe 3 is arranged on one side of the first delivery pipe 2. The first regulating pipe 4 is fixedly connected to the upper surface of the first delivery pipe 2 and the second delivery pipe 3, and the first delivery pipe 2, the second delivery pipe 3 and the first regulating pipe 4 are internally connected. A second regulating pipe 5 is arranged between the first delivery pipe 2 and the second delivery pipe 3, and the second regulating pipe 5 is located below the first regulating pipe 4. The first delivery pipe 2 and the second delivery pipe 3 are symmetrically provided with extruded mounting shells 6 at the bottom, and the two extruded mounting shells 6 are fixedly connected to the bottom of the connecting rod 7.
[0029] The first delivery pipe 2, the second delivery pipe 3 and the second regulating pipe 5 are connected to facilitate the exhaust gas to enter the purification tower body 1. When the second regulating pipe 5 is moved away from the first delivery pipe 2 and the second delivery pipe 3, the side of the first delivery pipe 2 and the second delivery pipe 3 close to the second regulating pipe 5 is blocked, and the exhaust gas enters the purification tower body 1 through the first delivery pipe 2, the second delivery pipe 3 and the first regulating pipe 4. When the second regulating pipe 5 is inspected, the purification tower body 1 can still purify the exhaust gas normally to ensure stable exhaust gas transportation.
[0030] Embodiment 1:
[0031] In the specific implementation process, Figure 1 and Figure 2As shown, a limiting plate 8 is symmetrically fixedly connected to one side surface of the second adjusting tube 5 , and a sealing plate 9 is symmetrically fixedly connected to one side surface of the second adjusting tube 5 away from the limiting plate 8 .
[0032] The extrusion mechanism on the inner wall of the extrusion installation shell 6 enters the rectangular groove of the limiting plate 8, firmly connects the first delivery pipe 2, the second delivery pipe 3 and the second regulating pipe 5, separates the second regulating pipe 5 from the first delivery pipe 2 and the second delivery pipe 3, and when the extrusion mechanism inside the extrusion installation shell 6 enters the rectangular groove of the sealing plate 9, the first delivery pipe 2 and the second delivery pipe 3 are blocked on one side close to the second regulating pipe 5, so as to facilitate the exhaust gas to enter the purification tower body 1 through the first delivery pipe 2, the second delivery pipe 3 and the first regulating pipe 4.
[0033] refer to Figure 2 and Figure 3 As shown, a telescopic tube 10 is symmetrically slidably installed inside the second adjusting tube 5, and sliding grooves 11 are symmetrically opened on the upper and lower surfaces of the second adjusting tube 5. Moving blocks 12 are symmetrically fixedly connected to the surfaces of the two telescopic tubes 10, and the moving blocks 12 slide on the inner walls of the sliding grooves 11. A spring 13 is fixedly connected to the surface of the moving block 12, and the side of the spring 13 away from the moving block 12 is fixedly connected to the inner wall of the sliding groove 11.
[0034] When the first conveying pipe 2, the second conveying pipe 3 and the second adjusting pipe 5 are firmly connected, the telescopic tube 10 enters the first conveying pipe 2 and the second conveying pipe 3, blocks the two sides of the first adjusting pipe 4, pulls the moving block 12 on the inner wall of the slide groove 11, and the moving block 12 retracts the telescopic tube 10 into the second adjusting pipe 5. The moving block 12 squeezes the spring 13 to contract, making it convenient to move the second adjusting pipe 5 away from the first conveying pipe 2 and the second conveying pipe 3.
[0035] refer to Figure 2 and Figure 4 As shown, a connecting seat 14 is fixedly connected to the top of the two extruded mounting shells 6 , and the upper surface of the connecting seat 14 is fixedly connected to the bottom of the first conveying pipe 2 and the second conveying pipe 3 .
[0036] The extrusion installation shell 6 firmly connects the first delivery pipe 2 and the second delivery pipe 3. When the extrusion mechanism inside the extrusion installation shell 6 firmly connects the first delivery pipe 2, the second delivery pipe 3 and the second regulating pipe 5, it is convenient for the exhaust gas to enter the purification tower body 1 through the first delivery pipe 2, the second delivery pipe 3 and the second regulating pipe 5.
[0037] refer to Figure 4As shown, the inner walls of the rectangular grooves of the two extruded mounting shells 6 are rotatably connected with a bidirectional screw rod 15, and the inner walls of the rectangular grooves of the two extruded mounting shells 6 are slidably connected with an extrusion rod 16. The surface of the extrusion rod 16 is provided with a linkage groove 17. The threaded surface of the bidirectional screw rod 15 is meshed with the inner wall of the linkage groove 17, and the center surface of the round rod of the bidirectional screw rod 15 is fixedly connected with a rotating block 18.
[0038] Rotate the rotating block 18 to drive the bidirectional screw 15 to rotate on the inner wall of the rectangular groove of the extrusion mounting shell 6. The threaded surface of the bidirectional screw 15 contacts the inner wall of the linkage groove 17, driving the extrusion rods 16 to approach each other. The extrusion rods 16 enter the rectangular groove of the limiting plate 8 or the sealing plate 9, which facilitates the exhaust gas to enter the purification tower body 1 through the first delivery pipe 2, the second delivery pipe 3 and the first regulating pipe 4, or the exhaust gas to enter the purification tower body 1 through the first delivery pipe 2, the second delivery pipe 3 and the second regulating pipe 5. When checking the second regulating pipe 5, the purification tower body 1 can still purify the exhaust gas.
[0039] Embodiment 2:
[0040] refer to Figure 2 As shown, the connecting rod 7 is made of steel alloy material.
[0041] The steel alloy material has high physical strength and high bending resistance. When the connecting rod 7 supports and extrude the mounting shell 6, the connecting rod 7 will not be easily squeezed and deformed. When the surface of the connecting rod 7 is collided, the surface of the connecting rod 7 will not be easily worn or dented.
[0042] The above are only embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A purification tower for efficiently purifying acidic gases in flue gas, characterized in that: include: A purification tower body (1), a first delivery pipe (2), a second delivery pipe (3), a first regulating pipe (4), a second regulating pipe (5), an extruded mounting shell (6) and a connecting rod (7), wherein the first delivery pipe (2) is fixedly connected to one side of the purification tower body (1), the second delivery pipe (3) is arranged on one side of the first delivery pipe (2), the first regulating pipe (4) is fixedly connected to the upper surfaces of the first delivery pipe (2) and the second delivery pipe (3), and the first delivery pipe (2), the second delivery pipe (3) and the first regulating pipe (4) are internally connected, the second regulating pipe (5) is arranged between the first delivery pipe (2) and the second delivery pipe (3), and the second regulating pipe (5) is located below the first regulating pipe (4), the extruded mounting shells (6) are symmetrically arranged at the bottom of the first delivery pipe (2) and the second delivery pipe (3), and the connecting rod (7) is fixedly connected to the bottom of the two extruded mounting shells (6).
2. The purification tower for efficiently purifying acidic gases in flue gas according to claim 1 is characterized in that: A limiting plate (8) is symmetrically fixedly connected to a surface of one side of the second regulating tube (5), and a sealing plate (9) is symmetrically fixedly connected to a surface of a side of the second regulating tube (5) away from the limiting plate (8).
3. The purification tower for efficiently purifying acidic gases in flue gas according to claim 1 is characterized in that: A telescopic tube (10) is symmetrically slidably mounted inside the second adjusting tube (5); a slide groove (11) is symmetrically provided on the upper and lower surfaces of the second adjusting tube (5); moving blocks (12) are symmetrically fixedly connected to the surfaces of the two telescopic tubes (10); the moving blocks (12) slide on the inner wall of the slide groove (11); a spring (13) is fixedly connected to the surface of the moving block (12); and a side of the spring (13) away from the moving block (12) is fixedly connected to the inner wall of the slide groove (11).
4. The purification tower for efficiently purifying acidic gases in flue gas according to claim 1 is characterized in that: A connecting seat (14) is fixedly connected to the top of the two extruded mounting shells (6), and the upper surface of the connecting seat (14) is fixedly connected to the bottom of the first conveying pipe (2) and the second conveying pipe (3).
5. The purification tower for efficiently purifying acidic gases in flue gas according to claim 1 is characterized in that: The inner walls of the rectangular grooves of the two extrusion mounting shells (6) are rotatably connected with a bidirectional screw rod (15), and the inner walls of the rectangular grooves of the two extrusion mounting shells (6) are slidably connected with an extrusion rod (16). The surface of the extrusion rod (16) is provided with a linkage groove (17), and the threaded surface of the bidirectional screw rod (15) is meshingly connected with the inner wall of the linkage groove (17).
6. The purification tower for efficiently purifying acidic gases in flue gas according to claim 5, characterized in that: A rotating block (18) is fixedly connected to the central surface of the round rod of the bidirectional screw rod (15).
7. The purification tower for efficiently purifying acidic gases in flue gas according to claim 1, characterized in that: The connecting rod (7) is made of steel alloy material.