Side slope revetment combined with prefabricated drainage structure
By setting a plug hole and installing the prefabricated drainage pipe on the slope protection structure of the water conservancy project, combined with the filtering module and water stop measures, the problem of large -scale excavation of the soil in the traditional shore protection structure is solved. Effective drainage, saving construction time, improving construction efficiency, and ensuring the long -term safety and stability of the shore protection structure.
Patent Information
- Application Number
- CN202421155186.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-24
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-24
AI Technical Summary
In water conservancy projects, traditional bank protection structures have pre-embedded drainage pipes and filter packs in slope soil, and large-scale excavation and backfilling of slope soil is required, resulting in increased project volume, extended construction period, increased project costs, and construction. It is difficult, cumbersome, and the construction quality is difficult to guarantee, it is easy to block, and the drainage effect is poor, which poses safety hazards.
The slope protection shore with a prefabricated drainage structure can be used to set up plug holes in the shore protection structure, install the prefabricated drainage pipe, fill the filter module in the pipe, and the gear and sealing glue are used for water to stop the water. In the case, build an effective drainage structure.
Through the combination of the prefabricated drainage pipe and the filter module, the smooth drainage in the slope soil is achieved, avoiding large -scale excavation recovery, saving construction time, improving construction efficiency, ensuring smooth drainage, and ensuring long -term safety and stability of the shore protection structure.
Smart Images

Figure CN222412847U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a slope bank protection combined with a prefabricated drainage structure, which is applicable to the technical field of water conservancy engineering. Background Art
[0002] In water conservancy projects, reasonable drainage measures are crucial to the stability of bank protection structures. The water in the slope soil must be discharged smoothly to reduce the water and soil pressure of the bank protection structure and avoid excessive structural deformation, cracking, instability and other phenomena. In order to ensure that the water in the slope soil can be discharged smoothly, the traditional bank protection structure pre-buries drainage pipes and anti-filter bags in the slope soil, which requires large-scale excavation and backfilling of the slope soil, resulting in increased engineering volume, extended construction period, and increased engineering costs. For the pile structure, it violates the original intention of reducing earth excavation. For the retaining wall structure, the construction is difficult and the procedures are cumbersome. In addition, the construction quality is difficult to guarantee, it is easy to be blocked, the drainage effect is poor, and there are safety hazards. Utility Model Content
[0003] The technical problem to be solved by the utility model is: in view of the above existing problems, a slope bank protection combined with a prefabricated drainage structure is provided to avoid a large amount of slope earthwork excavation and filling.
[0004] The technical solution adopted by the utility model is: a slope revetment combined with a prefabricated drainage structure, having a revetment structure arranged beside the slope soil body, characterized in that:
[0005] The revetment structure is provided with a plurality of insertion holes, the insertion holes penetrate the revetment structure, and the first ends of the insertion holes are lower than the second ends thereof, wherein the first ends are the ends of the insertion holes away from the slope soil, and the second ends are the ends of the insertion holes close to the slope soil;
[0006] A prefabricated drainage pipe is inserted into the insertion hole of the bank protection structure, and the prefabricated drainage pipe penetrates into the slope soil body on one side of the bank protection structure;
[0007] The first end of the prefabricated drainage pipe is a water outlet, which corresponds to the first end position of the insertion hole. The second end of the prefabricated drainage pipe is a pointed part for facilitating the insertion of the prefabricated drainage pipe into the slope soil. The prefabricated drainage pipe body is provided with a plurality of water inlets.
[0008] A retaining ring is formed at the first end of the prefabricated drainage pipe, and the outer diameter of the retaining ring is larger than the diameter of the insertion hole.
[0009] The retaining ring is in close contact with the outer side surface of the bank protection structure, and a water-stopping sealant is filled between the retaining ring and the bank protection structure.
[0010] The prefabricated drainage pipe is filled with a filter module.
[0011] The filter module comprises a filter mesh bag and graded sand and gravel filled in the filter mesh bag.
[0012] The slope of the insertion hole is between 5% and 10%.
[0013] The insertion holes on the bank protection structure are arranged in a plum blossom shape.
[0014] The length of the prefabricated drainage pipe is between 1 and 3 meters.
[0015] The bank protection structure is a pile constructed using a trenchless technique or a retaining wall constructed using an excavation technique.
[0016] The beneficial effects of the utility model are as follows: the utility model can insert prefabricated drainage pipes through the insertion holes on the bank protection structure, so as to arrange the drainage structure in the slope soil, without excavating and backfilling the soil behind the bank protection structure. After the bank protection structure is completed, construction can be carried out by means of leading holes, etc., thus saving construction time and improving construction efficiency.
[0017] The prefabricated drainage pipe in the utility model can be prefabricated in the factory, with uniform product quality, ensuring smooth drainage. After reaching the designed service life or drainage failure, the prefabricated drainage pipe can be extracted from the first end of the insertion hole and replaced with a new product, ensuring the drainage function and ensuring the long-term safety and stability of the bank protection structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the structure of Example 1.
[0019] Figure 2 Schematic diagram of the outer side of the bank protection structure in the embodiment.
[0020] Figure 3 This is a schematic diagram of the structure of Example 1.
[0021] Figure 4 Schematic diagram of the structure of the prefabricated drainage pipe in the embodiment.
[0022] Figure 5 It is a structural cross-sectional view of the prefabricated drainage pipe in the embodiment.
[0023] In the figure: 1. Bank protection structure; 2. Prefabricated drainage pipe; 3. Pointed head; 4. Pipe body; 5. Water inlet; 6. Retaining ring; 7. Sealant; 8. Filter mesh bag; 9. Graded sand and gravel. DETAILED DESCRIPTION
[0024] Embodiment 1: This embodiment is a slope revetment combined with a prefabricated drainage structure, having a revetment structure arranged next to the slope soil body. The revetment structure is a pile body constructed using non-excavation technology such as prefabricated concrete piles and cast-in-place reinforced concrete pipe piles.
[0025] In this example, a number of insertion holes are evenly distributed on the revetment structure in a plum blossom-shaped arrangement. The insertion holes penetrate the revetment structure, and the first end of the insertion hole is lower than the second end thereof, and the slope is inclined downward between 5% and 10%, wherein the first end is the end of the insertion hole away from the slope soil, and the second end of the insertion hole is close to the slope soil.
[0026] In this embodiment, a prefabricated drainage pipe is inserted into the insertion hole of the bank protection structure, and the prefabricated drainage pipe penetrates into the slope soil on one side of the bank protection structure.
[0027] In this example, the first end of the prefabricated drainage pipe is the water outlet and a retaining ring is formed at the first end; at least two rows of water inlets are provided on the pipe body of the prefabricated drainage pipe, each row of water inlets is arranged parallel to the axis of the prefabricated drainage pipe and each row has multiple water inlets; the second end of the prefabricated drainage pipe is a pointed head for facilitating the insertion of the prefabricated drainage pipe into the slope soil, and the pointed head adopts a conical solid structure and is integrally formed with the pipe body.
[0028] In this embodiment, the length of the prefabricated drainage pipe is between 1 and 3 meters, and the outer diameter is adapted to the diameter of the insertion hole, generally between 5 and 20 cm.
[0029] In this embodiment, the outer diameter of the retaining ring is larger than the diameter of the insertion hole. The retaining ring adopts a thin-walled structure and is integrally formed with the pipe body, which plays a role in fixing the drain pipe and facilitates the later replacement operation. When the prefabricated drain pipe is inserted into the slope soil through the insertion hole, the retaining ring is close to the outer side of the bank protection structure, and a water-stopping sealant with a thickness of 1 to 2 cm is filled between the retaining ring and the bank protection structure, which plays a role in bidirectional sealing and water-stopping, preventing the moisture of the soil behind the bank protection structure from flowing out from the gap between the drain pipe and the pile hole, and also preventing the water in the water body in front of the bank protection structure from infiltrating into the back of the bank protection structure.
[0030] In this embodiment, a filter module is filled in the prefabricated drainage pipe, and the filter module has a filter bag and graded sand and gravel filled in the filter bag. In this embodiment, the first end of the pipe body retains 5 to 10 cm without a water inlet, and no filter bag and graded sand and gravel are placed. The outer diameter of the filter bag is consistent with the inner diameter of the pipe body, and the mesh size of the filter bag should be smaller than the minimum particle size of the graded sand and gravel. The particle diameter and mix ratio of the graded sand and gravel are calculated and determined according to the different slope soil materials, and are densely filled inside the pipe body.
[0031] Embodiment 2: The structure of this embodiment is basically the same as that of Embodiment 1, the only difference being that the bank protection structure in this embodiment is a retaining wall constructed using excavation technology, such as gravity type, counterweight type, cantilever type, buttress type, etc.
[0032] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A slope revetment combined with a prefabricated drainage structure, having a revetment structure arranged beside the slope soil, characterized in that: The revetment structure is provided with a plurality of insertion holes, the insertion holes penetrate the revetment structure, and the first ends of the insertion holes are lower than the second ends thereof, wherein the first ends are the ends of the insertion holes away from the slope soil, and the second ends are the ends of the insertion holes close to the slope soil; A prefabricated drainage pipe is inserted into the insertion hole of the bank protection structure, and the prefabricated drainage pipe penetrates into the slope soil body on one side of the bank protection structure; The first end of the prefabricated drainage pipe is a water outlet, which corresponds to the first end position of the insertion hole. The second end of the prefabricated drainage pipe is a pointed part for facilitating the insertion of the prefabricated drainage pipe into the slope soil. The prefabricated drainage pipe body is provided with a plurality of water inlets.
2. The slope revetment combined with a prefabricated drainage structure according to claim 1 is characterized in that: A retaining ring is formed at the first end of the prefabricated drainage pipe, and the outer diameter of the retaining ring is larger than the diameter of the insertion hole.
3. The slope revetment combined with a prefabricated drainage structure according to claim 2 is characterized by: The retaining ring is in close contact with the outer side surface of the bank protection structure, and a water-stopping sealant is filled between the retaining ring and the bank protection structure.
4. The slope revetment combined with a prefabricated drainage structure according to claim 1, characterized in that: The prefabricated drainage pipe is filled with a filter module.
5. The slope revetment combined with a prefabricated drainage structure according to claim 4 is characterized in that: The filter module comprises a filter mesh bag and graded sand and gravel filled in the filter mesh bag.
6. The slope revetment combined with a prefabricated drainage structure according to claim 1, characterized in that: The slope of the insertion hole is between 5% and 10%.
7. The slope revetment combined with a prefabricated drainage structure according to claim 1, characterized in that: The insertion holes on the bank protection structure are arranged in a plum blossom shape.
8. The slope revetment combined with a prefabricated drainage structure according to claim 1, characterized in that: The length of the prefabricated drainage pipe is between 1 and 3 meters.
9. The slope revetment combined with a prefabricated drainage structure according to claim 1, characterized in that: The bank protection structure is a pile constructed using a trenchless technique or a retaining wall constructed using an excavation technique.