Exposure-preventing anchor rod based on coal mine tunnel

By integrating the drying component and fixed components of the activated carbon layer on the anchor rod, the problem of corrosion of anchor rods in the humid environment is solved, the support effect and construction efficiency are improved, and the stability and safety of the coal mine lanes are enhanced.

CN222414907UActive Publication Date: 2025-01-28ANHUI UNIV OF SCI & TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420871271.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-01-28
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

In coal mine tunnels, anchor rods are exposed to humid environments for a long time and are susceptible to corrosion, resulting in poor support effect and affecting the stability and safety of the tunnels.

Method used

An anchor rod that includes support rods, support disks, fixed components and dry components. The drying component consists of the first and second loop and the activated carbon layer. It is fixed on the support rod through a magnetic suction connection. The activated carbon layer is used for the humid air around the dry. The fixed component includes fixed nails, broken balls, isolation pads and card connection components for fast fixing the bottom of the support rod.

Benefits of technology

Through the drying effect of the activated carbon layer, the risk of corrosion risks in the humid environment is reduced, the durability and support effect of the anchor rod are improved, and the stability and safety of the lane lanes are enhanced. At the same time, the design of fixed components achieves a fast and fixed effect and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222414907U_ABST
    Figure CN222414907U_ABST
Patent Text Reader

Abstract

The utility model discloses an anchor rod for preventing exposure based on a coal mine tunnel, and relates to the technical field of anchor rods, the anchor rod comprises a support rod and a support disc fixedly connected with the bottom of the support rod, the top surface of the support disc is provided with an installation groove, a fixing assembly is installed in the installation groove, and drying assemblies are equidistantly installed on the surface of the support rod. The drying assembly comprises a first supporting ring, a second supporting ring and an activated carbon layer, the cross section of the first supporting ring and the cross section of the second supporting ring are both in a semi-circular ring shape, and the inner diameter of a circular ring formed by splicing the first supporting ring and the second supporting ring is equal to the diameter of the supporting rod. The first supporting ring and the second supporting ring can be fixed to the surface of the supporting rod, meanwhile, the activated carbon layers in the cavities of the first supporting ring and the second supporting ring can dry humid air around the supporting rod, and the situation that the anchor rod is exposed in the humid coal mine environment for a long time, and consequently the anchor rod is corroded is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of anchor rods, in particular to an anchor rod for preventing exposure in coal mine tunnels. Background Art

[0002] In coal mine tunnels, in order to prevent the exposure of rocks or coal seams on the tunnel walls or tops, anchor rods are needed for support. Anchor rods are steel bars fixed in the rock mass or coal seams. They are anchored deep in the rock mass to enhance the supporting capacity of the tunnel and prevent rock or coal seam collapse. This support method can effectively improve the stability and safety of the tunnel and ensure the safe operation of miners and equipment.

[0003] After searching, the applicant found that a Chinese patent disclosed "an anchor rod for supporting coal mine tunnels", and its publication (announcement) number is "CN212837882U". This patent mainly increases the support effect and improves safety by setting multiple devices that can fix the support rods in the coal seam, as well as two devices that can fix the metal mesh. However, the anchor rod will be corroded due to long-term exposure to the humid coal mine environment. For this reason, we propose an anchor rod based on coal mine tunnels to prevent exposure. Utility Model Content

[0004] The utility model aims to provide an anchor rod for preventing exposure in coal mine tunnels.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an anchor rod for preventing exposure in coal mine tunnels, comprising a support rod and a support plate fixed to the bottom of the support rod, the top surface of the support plate is provided with an installation groove, a fixing component is installed inside the installation groove, and drying components are equidistantly installed on the surface of the support rod, the drying components include a first support ring, a second support ring and an activated carbon layer, the cross-sections of the first support ring and the second support ring are both semicircular, and the inner diameter of the circular ring spliced ​​by the first support ring and the second support ring is equal to the diameter of the support rod, and the activated carbon layer is filled in the cavity of the first support ring and the second support ring.

[0006] As a further solution of the utility model: through holes are equidistantly provided on the surfaces of the first support ring and the second support ring, and the bottom surfaces of the first support ring and the second support ring are both mesh-shaped.

[0007] As a further solution of the utility model: both ends of the first support ring are embedded with first magnetic blocks, both ends of the second support ring are embedded with second magnetic blocks, and the first magnetic block and the second magnetic block are magnetically connected.

[0008] As a further solution of the utility model: the fixing assembly comprises fixing nails, the surfaces of the fixing nails are evenly installed with breaking balls, and the outer surfaces of the fixing nails are provided with through grooves.

[0009] As a further solution of the utility model: the fixing assembly further includes an isolation pad and a fixing ring, the isolation pad and the fixing ring are both sleeved on the surface of the fixing nail, and the fixing ring is located directly above the isolation pad.

[0010] As a further solution of the utility model: two groups of limit blocks are installed on the top surface of the fixing ring, and the left sides of the two groups of limit blocks are provided with card slots, the cross-sectional dimensions of the card slots and the through slots are equal, and a card connection component is installed through the inside of the through slots.

[0011] As a further solution of the utility model: the clamping assembly includes a clamping block, a fixed rod and a rotating block, the fixed rod is provided with two groups, and is respectively fixedly installed on the left and right ends of the clamping block, the rotating block is rotatably connected to the surface of the fixed rod, the cross-section of the clamping block is a rectangle, and the length of the rectangle is greater than the length of the rotating block.

[0012] By adopting the above technical solution, compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. The utility model can fix the first support ring and the second support ring on the surface of the support rod by cooperating with each other. At the same time, the activated carbon layer in the cavity of the first support ring and the second support ring can dry the humid air around the support rod, thereby preventing the anchor rod from being exposed to the humid coal mine environment for a long time, which may cause corrosion of the anchor rod.

[0014] 2. The utility model sets a fixing component, uses a screw gun to insert the fixing nail into the ground, then pours adhesive into the ring groove of the crushing ball for rotating and crushing, and then puts the isolation pad and the fixing ring on the surface of the fixing nail, so that the fixing nail can be quickly fixed to the ground, and then the clamping block is passed through the clamping groove and the through groove, and the rotating block is rotated to a vertical state so that the clamping block is clamped in the clamping groove, thereby achieving the effect of quickly fixing the bottom of the support rod.

[0015] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and will be apparent to those skilled in the art based on the following examination and study, or may be taught from the practice of the present invention to some extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional schematic diagram of the overall structure in the embodiment of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the installation slot in the embodiment of the utility model;

[0018] Figure 3 This is a schematic diagram of the structure of the fixing nail in the embodiment of the utility model;

[0019] Figure 4 This is a structural schematic diagram of a clamping assembly in an embodiment of the utility model;

[0020] Figure 5 It is a schematic diagram of the structure of the drying component in the embodiment of the utility model.

[0021] In the figure: 1. support rod; 2. support plate; 3. mounting groove; 4. fixing assembly; 41. fixing nail; 411. crushing ball; 412. through groove; 42. isolation pad; 43. fixing ring; 44. limiting block; 441. slot; 45. snap-on assembly; 451. clamping block; 452. fixing rod; 453. rotating block; 5. drying assembly; 51. first support ring; 511. through hole; 52. second support ring; 53. activated carbon layer; 54. first magnetic block; 55. second magnetic block. DETAILED DESCRIPTION

[0022] The specific implementation methods of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these implementation methods is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in each implementation method of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0023] Example 1, please refer to the attached Figure 1 -Attached Figure 5 An anchor rod for preventing exposure in coal mine tunnels includes a support rod 1 and a support plate 2 fixed to the bottom of the support rod 1. The top surface of the support plate 2 is provided with a mounting groove 3, and a fixing component 4 is installed inside the mounting groove 3. Drying components 5 are evenly installed on the surface of the support rod 1. The drying components 5 include a first support ring 51, a second support ring 52 and an activated carbon layer 53. The cross-sections of the first support ring 51 and the second support ring 52 are both semicircular, and the inner diameter of the circular ring formed by the first support ring 51 and the second support ring 52 is equal to the diameter of the support rod 1. The activated carbon layer 53 is filled in the cavity of the first support ring 51 and the second support ring 52.

[0024] In this embodiment, through holes 511 are evenly spaced on the surfaces of the first support ring 51 and the second support ring 52, and the bottom surfaces of the first support ring 51 and the second support ring 52 are both mesh-shaped;

[0025] The bottom surfaces of the through holes 511 and the first support ring 51 and the second support ring 52 are all mesh-shaped, which can increase the contact area between the activated carbon layer 53 and the air.

[0026] In this embodiment, both ends of the first support ring 51 are embedded with first magnetic blocks 54, and both ends of the second support ring 52 are embedded with second magnetic blocks 55, and the first magnetic blocks 54 and the second magnetic blocks 55 are magnetically connected;

[0027] The first magnetic block 54 and the second magnetic block 55 are magnetically connected, so that the first support ring 51 and the second support ring 52 can be attracted and fixed on the surface of the support rod 1 by the first magnetic block 54 and the second magnetic block 55, and the first support ring 51 and the second support ring 52 can be easily installed and removed.

[0028] Specifically, by cooperating with the first support ring 51 and the second support ring 52, the first support ring 51 and the second support ring 52 can be fixed on the surface of the support rod 1. At the same time, the activated carbon layer 53 in the cavity of the first support ring 51 and the second support ring 52 will dry the humid air around the support rod 1, thereby preventing the anchor rod from being exposed to the humid coal mine environment for a long time, which may cause corrosion of the anchor rod.

[0029] Example 2, please refer to the attached Figure 1 -Attached Figure 5 An anchor rod for preventing exposure in coal mine tunnels includes a support rod 1 and a support plate 2 fixed to the bottom of the support rod 1. The top surface of the support plate 2 is provided with a mounting groove 3, and a fixing component 4 is installed inside the mounting groove 3. Drying components 5 are evenly installed on the surface of the support rod 1. The drying components 5 include a first support ring 51, a second support ring 52 and an activated carbon layer 53. The cross-sections of the first support ring 51 and the second support ring 52 are both semicircular, and the inner diameter of the circular ring formed by the first support ring 51 and the second support ring 52 is equal to the diameter of the support rod 1. The activated carbon layer 53 is filled in the cavity of the first support ring 51 and the second support ring 52.

[0030] In this embodiment, the fixing assembly 4 includes a fixing nail 41, and crushing balls 411 are evenly installed on the surface of the fixing nail 41, and a through groove 412 is opened on the outer surface of the fixing nail 41;

[0031] The fixing nail 41 is fixed to the ground by a screw gun. The crushing ball 411 will penetrate the annular groove during rotation. Then, adhesive is injected into the annular groove to make the fixing nail 41 adhere to the ground, thereby increasing the stability of the fixing nail 41.

[0032] In this embodiment, the fixing assembly 4 further includes an isolation pad 42 and a fixing ring 43. The isolation pad 42 and the fixing ring 43 are both sleeved on the surface of the fixing nail 41, and the fixing ring 43 is located directly above the isolation pad 42.

[0033] The isolation pad 42 can isolate the adhesive from contacting the fixing ring 43 , thereby preventing the fixing ring 43 from being adhered to the adhesive and becoming difficult to disassemble.

[0034] In this embodiment, two groups of limit blocks 44 are installed on the top surface of the fixing ring 43. The left sides of the two groups of limit blocks 44 are provided with a clamping groove 441. The cross-sectional dimensions of the clamping groove 441 and the through groove 412 are equal. A clamping assembly 45 is installed through the through groove 412.

[0035] The cross-sectional dimensions of the clamping slot 441 and the through slot 412 are equal, so that the clamping assembly 45 can pass through the clamping slot 441 and the through slot 412 .

[0036] In this embodiment, the clamping assembly 45 includes a clamping block 451, a fixed rod 452 and a rotating block 453. The fixed rod 452 is provided with two groups and is fixedly installed at the left and right ends of the clamping block 451 respectively. The rotating block 453 is rotatably connected to the surface of the fixed rod 452. The cross section of the clamping block 451 is a rectangle, and the length of the rectangle is greater than the length of the rotating block 453.

[0037] After the fixing nail 41 and the fixing ring 43 are installed, the clamping block 451 is inserted into the clamping groove 441, and then the rotating block 453 is rotated to a vertical state so that both ends of the clamping block 451 are clamped by the rotating block 453, so that the support plate 2 is fixed to the ground by the fixing nail 41.

[0038] Specifically, by setting the fixing component 4, after inserting the fixing nail 41 into the ground with a screw gun, pouring the adhesive into the ring groove of the crushing ball 411, and then putting the isolation pad 42 and the fixing ring 43 on the surface of the fixing nail 41, the fixing nail 41 can be quickly fixed to the ground, and then the clamping block 451 is passed through the clamping groove 441 and the through groove 412, and the rotating block 453 is rotated to a vertical state, so that the clamping block 451 is clamped in the inside of the clamping groove 441, so as to achieve the effect of quickly fixing the bottom of the support rod 1.

[0039] Working principle:

[0040] First, move the support rod 1 to the position to be supported, and fix the fixing nail 41 to the ground with a screw gun. The crushing ball 411 will penetrate the annular groove during rotation, and then inject adhesive into the annular groove to make the fixing nail 41 bond to the ground, and then put the isolation pad 42 and the fixing ring 43 on the surface of the fixing nail 41, and then insert the clamping block 451 into the inside of the clamping groove 441, and then rotate the rotating block 453 to a vertical state, so that both ends of the clamping block 451 are clamped by the rotating block 453, so that the fixing nail 41 fixes the support plate 2 to the ground through the clamping block 451, and then the first support ring 51 and the second support ring 52 are attracted and fixed to the surface of the support rod 1 by the first magnetic block 54 and the second magnetic block 55, and the activated carbon layer 53 in the cavity of the first magnetic block 54 and the second magnetic block 55 will adsorb and dry the surrounding air, and the entire work process is completed.

[0041] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0042] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.

[0043] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above-mentioned utility model, the details of its power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by technical personnel in this field.

[0044] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.

[0045] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments.

[0046] For those skilled in the art, various changes, modifications, substitutions and variations can be made to these implementations without departing from the principles and spirit of the present invention, and they still fall within the protection scope of the present invention.

Claims

1. An anchor rod for preventing exposure in coal mine tunnels, comprising a support rod (1) and a support plate (2) fixed to the bottom of the support rod (1), characterized in that: The top surface of the support plate (2) is provided with a mounting groove (3), a fixing component (4) is installed inside the mounting groove (3), and drying components (5) are evenly installed on the surface of the support rod (1), the drying components (5) comprising a first support ring (51), a second support ring (52) and an activated carbon layer (53), the cross-sections of the first support ring (51) and the second support ring (52) are both semi-circular, and the inner diameter of the circular ring formed by splicing the first support ring (51) and the second support ring (52) is equal to the diameter of the support rod (1), and the activated carbon layer (53) is filled in the cavities of the first support ring (51) and the second support ring (52).

2. The anchor rod for preventing exposure in coal mine tunnels according to claim 1 is characterized in that: Through holes (511) are provided on the surfaces of the first support ring (51) and the second support ring (52) at equal intervals, and the bottom surfaces of the first support ring (51) and the second support ring (52) are both in a mesh shape.

3. The anchor rod for preventing exposure in coal mine tunnels according to claim 1, characterized in that: Both ends of the first support ring (51) are embedded with first magnetic blocks (54), and both ends of the second support ring (52) are embedded with second magnetic blocks (55), and the first magnetic block (54) and the second magnetic block (55) are magnetically connected.

4. The anchor rod for preventing exposure in coal mine tunnels according to claim 1 is characterized in that: The fixing assembly (4) comprises a fixing nail (41), on the surface of which crushing balls (411) are evenly installed, and on the outer surface of which a through groove (412) is formed.

5. The anchor rod for preventing exposure in coal mine tunnels according to claim 1 is characterized in that: The fixing assembly (4) further comprises an isolation pad (42) and a fixing ring (43), wherein the isolation pad (42) and the fixing ring (43) are both sleeved on the surface of the fixing pin (41), and the fixing ring (43) is located directly above the isolation pad (42).

6. The anchor rod for preventing exposure in coal mine tunnels according to claim 5, characterized in that: Two groups of limit blocks (44) are installed on the top surface of the fixing ring (43), and the left sides of the two groups of limit blocks (44) are both provided with a clamping groove (441), the cross-sectional dimensions of the clamping groove (441) and the through groove (412) are equal, and a clamping assembly (45) is installed through the inside of the through groove (412).

7. The anchor rod for preventing exposure in coal mine tunnels according to claim 6, characterized in that: The clamping assembly (45) comprises a clamping block (451), a fixed rod (452) and a rotating block (453); the fixed rod (452) is provided with two groups and is respectively fixedly mounted on the left and right ends of the clamping block (451); the rotating block (453) is rotatably connected to the surface of the fixed rod (452); the cross section of the clamping block (451) is rectangular, and the length of the rectangle is greater than the length of the rotating block (453).

Citation Information

Patent Citations

  • Anchor rod for coal mine roadway support

    CN212837882U