Spraying dust-settling device for mining

By setting up a hook and adjustment mechanism in the elastic tube of the mining dust reduction device, the problem of the existing device occupying the roadway through the roadway is solved, and the small device design and the effective dust reduction effect on different specifications lanes are realized.

CN222414935UActive Publication Date: 2025-01-28SHANDONG XINTAOYANG MINING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421382000.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-01-28
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

The existing mining dust reduction device occupies the passage space of the tunnel and affects the passage of transport vehicles and pedestrians.

Method used

Design a spray dust reduction device. By setting up a hook and adjustment mechanism in the elastic tube, the elastic tube can be hung in the steel mesh pores on the top of the roadway. Expand, adjust the curved curved to match the lanes of different specifications.

Benefits of technology

The design of this device is small, only occupying the space on the top of the laneway, increasing the space on the ground road floor, facilitating the passage of transportation vehicles and pedestrians, and achieving effective dust reduction of different specifications lanes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222414935U_ABST
    Figure CN222414935U_ABST
Patent Text Reader

Abstract

A spraying and dust settling device for mining comprises an elastic pipe and a plurality of nozzles arranged on one side of the elastic pipe in the length direction of the elastic pipe, a hook is arranged in the middle of the elastic pipe, and pipe hoops are detachably arranged at the two ends of the elastic pipe. The adjusting mechanism comprises a mounting box and a rotating shaft rotationally arranged in the mounting box, steel wire ropes are wound around the two ends of the rotating shaft, the inner ends of the two steel wire ropes are wound around the rotating shaft in the same direction, and the outer ends of the two steel wire ropes extend out of the two sides of the mounting box and are connected with the two pipe hoops correspondingly; the rotating shaft is further provided with a locking piece capable of locking / loosening the rotating shaft. According to the adjusting mechanism, the two steel wires can move in the opposite directions at the same time only by rotating the rotating shaft, then the elastic pipe is evenly bent or unfolded, the bending radian is adjusted, roadways of different specifications are matched, the adjusting mechanism is small and exquisite in structure, the whole device only occupies the space of the top of the roadway, and the device is convenient to use. Therefore, the passing space on the ground of the roadway is increased, and the passing of transport vehicles and pedestrians is facilitated; the detachable pipe hoop facilitates the replacement of the connecting position of the elastic pipe so as to adjust the bending radian of the elastic piece to be different; the hook facilitates installation of the elastic piece on a reinforcing mesh at the top of a roadway.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dust suppression devices, in particular to a spray dust suppression device used for mining. Background Art

[0002] A large amount of dust is generated during underground mining operations. In order to ensure the safety of on-site personnel and improve the on-site environment, dust reduction treatment is required.

[0003] In the prior art, there is a coal dust suppression device for coal mining and excavation, such as the application number CN202322639590.X, which includes a support rod arranged on the ground and an elastic tube with a spray head installed on the upper end thereof, and an arc adjustment assembly slidably arranged in the middle of the support rod, and diagonal support rods connected to the arc adjustment assembly are provided at both ends of the elastic tube. When in use, the support rod is placed in the middle position of the tunnel ground, and the operator manually adjusts the arc adjustment assembly to move up and down along the support rod, driving the diagonal support rod to pull the elastic tube to bend or unfold, so as to adjust it to match coal tunnels of different specifications. However, since the dust suppression device is arranged on the ground of the tunnel, the support rod and diagonal support rod supporting the elastic tube, and the arc adjustment assembly for adjusting the curvature of the elastic tube, will occupy most of the passage space of the tunnel when used in combination, seriously affecting the passage of transport vehicles and pedestrians. Utility Model Content

[0004] In order to solve the technical problems existing in the above-mentioned background technology, the utility model provides a spray dust suppression device for mining.

[0005] The technical solution of this utility model is as follows:

[0006] A spray dust suppression device for mining comprises an elastic tube and a plurality of nozzles arranged along the length direction of one side of the elastic tube. A hook is arranged in the middle of the elastic tube. With the above design, when in use, the elastic tube can be hung in the steel mesh hole at the top of the tunnel through the hook, which is convenient for the installation of the elastic tube.

[0007] As the core technical concept of the utility model, the dust suppression device is also provided with an adjustment mechanism, which includes an installation box and a rotating shaft rotatably arranged inside the installation box. Steel wire ropes are wound around both ends of the rotating shaft. The inner ends of the two steel wire ropes are wound around the rotating shaft in the same winding direction, and the outer ends extend out from both sides of the installation box. Both ends of the elastic tube are detachably provided with pipe clamps. The outer ends of the two steel wire ropes extend out of the two sides of the installation box respectively and are connected with the two pipe clamps. A locking piece capable of locking / loosening the rotating shaft is also provided on the rotating shaft, and the locking piece includes a locking nut. When in use, the operator holds the installation box with one hand, and then Then use the other hand to rotate the shaft. At this time, the two steel wires can move in opposite directions at the same time, and then the elastic tube is evenly bent or expanded to adjust the bending curvature to match tunnels of different specifications. After the elastic tube is bent into place, use the hand that rotates the shaft to twist the locking piece to lock the shaft. At this time, the elastic tube remains in the bent or expanded state. Finally, several nozzles on the elastic tube are controlled to start spraying and dust reduction. The adjustment mechanism is compact in design and only occupies the space at the top of the tunnel, thereby increasing the passage space on the tunnel ground and facilitating the passage of transport vehicles and pedestrians.

[0008] As a further implementation:

[0009] A blocking plate is also provided in the installation box, the rotating shaft passes through the blocking plate, and the two steel wire ropes are respectively wound on the rotating shafts on both sides of the blocking plate, so that the two steel wire ropes each have an independent winding space to prevent the two steel wire ropes from interfering with each other or getting tangled.

[0010] At least two hooks are provided to improve the stability of the elastic tube when installed in the tunnel.

[0011] A first connecting piece is also provided on the elastic tube, and the hook is connected to the first connecting piece through a first ring. Both the hook and the first connecting piece are passed through the first ring, so as to realize multi-angle adjustment between the hook and the elastic tube.

[0012] The hook comprises a hooking section and a connecting section connected to the first circular ring, and the length of the connecting section is adjustable to achieve height adjustment of the elastic tube in the lane.

[0013] A second connecting piece is provided on both pipe clamps, and the steel wire rope is connected to the second connecting piece through a second circular ring. The second connecting piece is passed through the second circular ring to realize multi-angle adjustment between the steel wire rope and the pipe clamp.

[0014] In order to further improve the stability of the installation of the elastic tube, the hooking directions of the two hooking sections are opposite, which improves the stability of the elastic tube installed on the steel mesh at the top of the tunnel and prevents the elastic tube from falling easily.

[0015] The installation box comprises a box body and an upper cover, and the upper cover is detachably connected to the box body, so that the installation box can be opened conveniently to maintain the components inside.

[0016] The utility model discloses a spray dust suppression device for mining, which has the beneficial effect that, through the provided hook, the elastic member can be conveniently installed on the steel mesh at the top of the tunnel, and through the designed adjustment mechanism, only the rotating shaft needs to be rotated to make the two steel wires move in opposite directions at the same time, so that the elastic tube is evenly bent or unfolded, and the bending curvature is adjusted to match tunnels of different specifications. The design of the adjustment mechanism is compact, and the entire device only occupies the space at the top of the tunnel, thereby increasing the passage space on the tunnel ground and facilitating the passage of conveying vehicles and pedestrians; the detachable pipe clamp facilitates the replacement of the position of the connecting elastic tube so as to adjust the different curvatures of the elastic member. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In the attached picture:

[0018] Figure 1 This is a schematic diagram of the structure of a spray dust suppression device for mining according to the utility model;

[0019] Figure 2 It is a schematic diagram of the connection structure between the adjustment mechanism and the two pipe hoops;

[0020] The components represented by the reference numerals in the figure are:

[0021] 1. Elastic tube; 2. Adjustment mechanism; 21. Installation box; 211. Blocking plate; 22. Rotating shaft; 23. Wire rope; 3. Hook; 4. First ring; 5. Pipe clamp; 6. Second ring. DETAILED DESCRIPTION

[0022] Combination Figure 1 and Figure 2 The present embodiment provides a spray dust suppression device for mining, including an elastic tube 1, one side of which is provided with a plurality of nozzles along the length direction, and the middle part of the elastic tube 1, on the side away from the nozzles, is provided with two hooks 3, and the hooking directions of the two hooks 3 are opposite, and the elastic member can be stably installed on the steel mesh at the top of the tunnel through the two hooks 3, and the hooking directions of the two hooks 3 are opposite, which can improve the stability of the elastic tube 1 installed on the steel mesh at the top of the tunnel, and the elastic tube 1 will not fall easily.

[0023] Specifically, the hook 3 includes a hooking section and a connecting section connected to the elastic tube 1, and the length of the connecting section is adjustable to achieve height adjustment of the elastic tube 1 in the tunnel. The adjustable method adopts the structure of adjustable rod length in the prior art, which will not be elaborated here.

[0024] The two ends of the elastic tube 1 are also provided with pipe hoops 5, and the two pipe hoops 5 are connected by an adjustment mechanism 2. The pipe hoops 5 are detachably connected to the elastic tube 1 by bolts, which facilitates the replacement of the position of the elastic tube 1 so as to adjust the elastic member to different curvatures.

[0025] The structure of the adjustment mechanism 2 is combined with Figure 2 Specifically, the adjustment mechanism 2 mainly includes a mounting box 21 , a rotating shaft 22 , two steel wire ropes 23 and a blocking plate 211 .

[0026] The following is a detailed introduction to the various structures of the adjustment mechanism 2:

[0027] The installation box 21 is a rectangular box, including a box body and an upper cover, and the upper cover is detachably connected to the box body, so that the installation box 21 can be opened conveniently to maintain the components therein.

[0028] The blocking plate 211 is transversely arranged in the middle of the box body. The blocking box divides the box body into two independent spaces. Both ends of the box body and the blocking plate 211 are provided with interconnected through holes.

[0029] The rotating shaft 22 is a T-shaped shaft, the diameter of one end with a larger diameter is larger than the diameter of the through hole, and the end with a smaller diameter is provided with an external thread. The end with the small diameter passes through the box body through the through hole, and the part passing through the box body is provided with a locking piece, which can be a locking nut. The rotating shaft 22 is locked on the end side wall of the box body through the locking nut.

[0030] The inner ends of the two steel wire ropes 23 are respectively wound around the rotating shafts 22 on both sides of the blocking plate 211. Through the blocking plate 211, the two steel wire ropes 23 each have an independent winding space, which can prevent the two steel wire ropes 23 from interfering with each other or getting knotted, and the winding directions of the two steel wire ropes 23 are the same. The outer ends of the two steel wire ropes 23 extend from both sides of the box body respectively, and are finally connected to the two pipe clamps 5 respectively. By rotating the rotating shaft 22, the two steel wire ropes 23 can be moved in opposite directions at the same time, and then the elastic tube 1 is evenly bent or unfolded to achieve the adjustment of the bending curvature to match tunnels of different specifications. The structural design of the adjustment mechanism 2 is compact, and the entire device only occupies the space on the top of the tunnel, thereby increasing the passage space on the tunnel ground and facilitating the passage of conveying vehicles and pedestrians.

[0031] Regarding the connection structure between the hook 3 and the elastic tube 1, Figure 2 Specifically, a first connecting piece is provided on the elastic tube 1, and the hook 3 is connected to the first connecting piece through a first ring 4. Both the hook 3 and the first connecting piece are passed through the first ring 4 to achieve multi-angle adjustment between the hook 3 and the elastic tube 1.

[0032] For the connection structure between the pipe clamp 5 and the wire rope 23, Figure 2 Specifically, the two pipe clamps 5 are each provided with a second connecting piece, the steel wire rope 23 is connected to the second connecting piece through the second ring 6, and the second connecting piece is passed through the second ring 6 to achieve multi-angle adjustment between the steel wire rope 23 and the pipe clamp 5.

[0033] The specifications of the first connecting member and the second connecting member are designed to be the same, and they can be round rods or rectangular plates. The specifications of the first circular ring 4 and the second circular ring 6 are also designed to be the same to improve versatility.

[0034] When in use, the elastic tube 1 is first fixed, for example, the elastic tube 1 is hung on the steel mesh on the side wall of the tunnel that is within the reach of the operator through the hook 3, and then the operator holds the installation box 21 with one hand, and then rotates the shaft 22 with the other hand. At this time, the two steel wire ropes 23 can move in opposite directions at the same time, and then the elastic tube 1 is evenly bent or unfolded to achieve the adjustment of the bending curvature. After the elastic tube 1 is bent to match the specifications of the tunnel in use, the hand that rotates the shaft 22 is used to twist the locking piece to lock the shaft 22. At this time, the elastic tube 1 remains in the bent or unfolded state, the hook 3 is removed from the steel mesh on the side wall of the tunnel, and the elastic tube 1 is hung on the steel mesh at the top of the tunnel through the hook 3. Finally, the elastic tube 1 is connected to the pipeline of the spray water, so that several nozzles on the elastic tube 1 start spraying and dust reduction work.

Claims

1. A spray dust suppression device for mining, comprising an elastic tube (1) and a plurality of nozzles arranged along the length of one side of the elastic tube, characterized in that: The elastic tube (1) is provided with a hook (3) in the middle, and detachable tube clamps (5) at both ends; The utility model also comprises an adjusting mechanism (2), the adjusting mechanism comprising a mounting box (21) and a rotating shaft (22) rotatably arranged inside the mounting box, steel wires (23) being wound around both ends of the rotating shaft (22), the inner ends of the two steel wires (23) being wound around the rotating shaft in the same winding direction, and the outer ends extending from both sides of the mounting box (21) and respectively connected to two pipe hoops (5); The rotating shaft (22) is also provided with a locking member capable of locking / relaxing the rotating shaft (22).

2. A spray dust suppression device for mining as claimed in claim 1, characterized in that: A blocking plate (211) is also provided in the installation box (21), the rotating shaft (22) passes through the blocking plate (211), and two steel wire ropes (23) are respectively wound around the rotating shaft (22) on both sides of the blocking plate (211).

3. A spray dust suppression device for mining as claimed in claim 1 or 2, characterized in that: At least two hooks (3) are provided.

4. A spray dust suppression device for mining as claimed in claim 3, characterized in that: The elastic tube (1) is also provided with a first connecting piece, and the hook (3) is connected to the first connecting piece via a first ring (4).

5. A spray dust suppression device for mining as claimed in claim 4, characterized in that: The hook (3) comprises a hooking section and a connecting section connected to the first ring (4), and the length of the connecting section is adjustable.

6. A spray dust suppression device for mining as claimed in claim 5, characterized in that: The hooking directions of the hooking sections of the two hooks (3) are opposite.

7. A spray dust suppression device for mining as claimed in claim 3, characterized in that: The two pipe clamps (5) are each provided with a second connecting piece, and the steel wire rope (23) is connected to the second connecting piece via a second ring (6).

Citation Information

Patent Citations

  • A coal dust suppression device for coal mining and excavation

    CN221002839U