Hollow high pier concrete hydration heat construction temperature control device
By designing the connection device and fixing device for the hydration thermal construction temperature control device of hollow high pier concrete, the problem of cumbersome installation and disassembly steps of the main water outlet pipe in the existing technology is solved, the installation and maintenance efficiency of the equipment is improved, and the connection is enhanced stability and sealing at the location.
Patent Information
- Application Number
- CN202420304486.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-02-19
AI Technical Summary
The existing construction temperature control device is complicated when connecting and dismantling the main water pipe, which affects the equipment installation and maintenance efficiency.
A hollow high pier concrete hydration thermal construction temperature control device was designed, using connecting devices and fixing devices. Through the structures of positioning blocks, positioning grooves, sealing gaskets, limiting pins and snap rings, the installation of the water outlet main pipe and Disassembly process.
It improves the installation and disassembly efficiency of the main outlet pipe, enhances the stability and sealing of the connection, reduces the leakage of cooling water, and improves the convenience and use efficiency of the equipment.
Smart Images

Figure CN222434353U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of high pier bridge engineering construction, in particular to a temperature control device for hollow high pier concrete hydration heat construction. Background Art
[0002] After pouring large volumes of concrete, the hydration heat of cement will cause the temperature inside the concrete to rise significantly, with the highest temperature reaching 60-80°C, and sometimes even exceeding 90°C. The heat dissipated from the concrete surface is relatively fast, so the concrete forms a temperature difference between the inside and outside, causing compressive stress inside the concrete and tensile stress outside. The elastic modulus and tensile strength of concrete in the early stage are very low, so cracks are easily generated on the concrete surface, affecting the safety of the building. The commonly used concrete temperature control technology is the cooling water pipe method, which uses cold water to absorb the hydration heat of concrete and control the maximum temperature of concrete.
[0003] The above-mentioned and existing related technologies often have the following defects: the existing construction temperature control device usually adopts flange and bolt method to connect the water outlet main pipe, but due to the large number of bolts, the operation steps are cumbersome and time-consuming, which affects the efficiency of disassembly and installation of the water outlet main pipe. When the water outlet main pipe is damaged or under maintenance, the maintenance efficiency of the water outlet main pipe will be reduced.
[0004] Therefore, we propose a temperature control device for the hydration heat construction of hollow high pier concrete. Summary of the invention
[0005] The utility model aims to provide a temperature control device for hollow high pier concrete hydration heat construction to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a temperature control device for the hydration heat construction of hollow high pier concrete, comprising a bridge pier, a water supply main pipeline, and a water outlet main pipeline, the water supply main pipeline is connected to a water pump, one end of the water outlet main pipeline is connected to a cooling pool, the cooling pool is connected to the water supply main pipeline, the surface of the water outlet main pipeline and the water supply main pipeline are both connected to branch pipelines, the surface of the water outlet main pipeline is provided with a connecting device, the connecting device comprises a first flange, the first flange is fixedly connected to the water outlet main pipeline, the surface of the first flange abuts against the surface of the first connecting seat, the surface of the first connecting seat is fixedly connected to the second connecting plate, the surface of the second connecting plate is rotatably connected to an extrusion block, the side wall of the extrusion block is fixedly connected to a fixing frame, the surface of the extrusion block is slidably connected to a push plate, the surface of the push plate is fixedly connected to the first connecting plate, the surface of the first connecting plate is fixedly connected to the second connecting seat, the surface of the second connecting seat abuts against the surface of the second flange, and the second flange is fixedly connected to the water outlet main pipeline.
[0007] The effect achieved by the above components is: when a hollow high pier concrete hydration heat construction temperature control device needs to be used, first install the water outlet main pipe and the water supply main pipe, then connect the water outlet main pipe and the water supply main pipe to the branch pipe, the branch pipe is buried inside the pier, and then the water outlet main pipe is connected to the cooling pool, the water supply main pipe is connected to the water pump and the cooling pool, and the first flange on the water outlet main pipe is connected to the second flange, so that the positioning block on the first flange is engaged with the positioning groove on the second flange. At this time, the first connecting seat is pressed against the first flange, and the second connecting seat is pressed against the second flange. Then the worker manually pushes the fixing frame to rotate along the place where it is connected to the second connecting plate. While the fixing frame rotates, it drives the elliptical extrusion block to apply pressure to the push plate on the first connecting plate, so that the first connecting seat drives the first flange and the second connecting seat drives the second flange to approach each other, and then the limit pin is inserted to fix the fixing frame.
[0008] Preferably, a plurality of positioning blocks are fixedly connected to the surface of the first flange, and a plurality of positioning grooves are formed on the surface of the second flange.
[0009] The effects achieved by the above components are: the positioning block on the first flange cooperates with the positioning groove on the second flange, thereby improving the stability when connecting the water outlet main pipe and also improving the convenience during installation.
[0010] Preferably, a sealing gasket is fixedly connected to the surface of the first flange, and the sealing gasket is made of rubber.
[0011] The effects achieved by the above components are: the rubber sealing ring between the first flange and the second flange enhances the sealing performance of the connection between the two water outlet main pipes, thereby minimizing the possibility of cooling water leakage.
[0012] Preferably, a surface of the second connecting plate is slidably connected to a limit pin, and the limit pin is slidably connected to the fixing frame.
[0013] The effect achieved by the above components is that the limit pin on the second connecting plate improves the stability of the connecting device when in use, so that when the fixing frame is shaken by external force, the extrusion block will not fall off the pushing plate.
[0014] Preferably, a fixing device is provided on the surface of the pier, and the fixing device includes a threaded sleeve, which is slidably connected to the pier, a screw is threadedly connected to the surface of the threaded sleeve, a first clamping ring is fixedly connected to one end of the screw, the first clamping ring is rotatably connected to a rotating shaft, a second clamping ring is rotatably connected to the surface of the rotating shaft, a water outlet main pipe is sleeved on the surfaces of the first clamping ring and the second clamping ring, a screw is slidably connected to the surfaces of the first clamping ring and the second clamping ring, and a nut is threadedly connected to the surface of the screw.
[0015] The effect achieved by the above components is: when a hollow high pier concrete hydration heat construction temperature control device needs to install a water outlet main pipe, first drill a hole in the inner wall of the pier, then fix the threaded sleeve in the hole on the inner wall of the pier, then screw the screw connected with the first clamping ring into the threaded sleeve, align the limiting ring on the surface of the water outlet main pipe with the groove of the first clamping ring, then put the water outlet main pipe into the first clamping ring, then rotate the second clamping ring along the rotating shaft so that the second clamping ring wraps the water outlet main pipe, then pass the screw through the first clamping ring and the second clamping ring, and then fix the first clamping ring and the second clamping ring with a nut.
[0016] Preferably, the inner walls of the first clamping ring and the second clamping ring are both fixedly connected with anti-skid pads, and the surfaces of the anti-skid pads are provided with anti-skid grooves.
[0017] The effect achieved by the above components is: the anti-slip pads on the surfaces of the first clamping ring and the second clamping ring make the first clamping ring and the second clamping ring more stable when clamping the water outlet main pipe, and also increase the friction between the first clamping ring and the second clamping ring and the surface of the water outlet main pipe.
[0018] Preferably, a limit ring is fixedly connected to the surface of the water outlet main pipe, and the cross-section of the limit ring is circular.
[0019] The effect achieved by the above components is that the surface limiting ring of the water outlet main pipe and the first clamping ring and the second clamping ring cooperate to limit the water outlet main pipe so that it will not fall off accidentally.
[0020] Compared with the prior art, the beneficial effects of the utility model are:
[0021] 1. The utility model solves the problem of complicated steps in connecting the water outlet main pipeline by providing a connecting device, facilitates the installation and disassembly of the water outlet main pipeline, and further improves the convenience of equipment use.
[0022] 2. The utility model solves the problem of installing the water outlet main pipe on the bridge pier by arranging the fixing device, and improves the stability of the connection between the water outlet main pipe and the bridge pier. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0024] Figure 2 This is a schematic diagram of the structure from another angle in the utility model;
[0025] Figure 3 For the utility model Figure 2 A magnified image of point A;
[0026] Figure 4 For the utility model Figure 2 The enlarged view of point B;
[0027] Figure 5 For the utility model Figure 2 Enlarged view of point C.
[0028] In the figure: 1. bridge pier; 2. water outlet main pipeline; 3. connecting device; 301. first flange; 302. positioning block; 303. sealing gasket; 304. second flange; 305. first connecting seat; 306. second connecting seat; 307. first connecting plate; 308. second connecting plate; 309. pushing plate; 310. extrusion block; 311. fixing frame; 312. limiting pin; 4. fixing device; 41. limiting ring; 42. threaded sleeve; 43. screw; 44. first retaining ring; 45. second retaining ring; 46. screw; 47. nut; 48. rotating shaft; 49. anti-skid pad; 5. water supply main pipeline; 6. cooling pool; 7. water pump; 8. branch pipeline. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] See also Figure 1-5 The utility model provides a technical solution: a temperature control device for hydration heat construction of hollow high pier concrete, comprising a bridge pier 1, a water supply main pipeline 5, and a water outlet main pipeline 2, characterized in that: the water supply main pipeline 5 is connected to a water pump 7, one end of the water outlet main pipeline 2 is connected to a cooling pool 6, the cooling pool 6 is connected to the water supply main pipeline 5, the surfaces of the water outlet main pipeline 2 and the water supply main pipeline 5 are both connected to branch pipelines 8, the surface of the water outlet main pipeline 2 is provided with a connecting device 3, and the surface of the bridge pier 1 is provided with a fixing device 4.
[0031] The specific configuration and function of the connecting device 3 and the fixing device 4 will be described in detail below.
[0032] like Figure 2 and Figure 3 as well as Figure 4As shown, the connecting device 3 includes a first flange 301, the first flange 301 is fixedly connected to the water outlet main pipe 2, the surface of the first flange 301 abuts against the surface of the first connecting seat 305, the surface of the first connecting seat 305 is fixedly connected with the second connecting plate 308, the surface of the second connecting plate 308 is rotatably connected with an extrusion block 310, the side wall of the extrusion block 310 is fixedly connected with a fixing frame 311, the surface of the extrusion block 310 is slidably connected with a push plate 309, the surface of the push plate 309 is fixedly connected with the first connecting plate 307, the surface of the first connecting plate 307 is fixedly connected with the second connecting seat 306, the surface of the second connecting seat 306 abuts against the surface of the second flange 304, and the second flange 304 is fixedly connected to the water outlet main pipe 2. When a temperature control device for the hydration heat construction of hollow high pier concrete is needed, first install the outlet main pipe 2 and the water supply main pipe 5, then connect the outlet main pipe 2 and the water supply main pipe 5 to the branch pipe 8, the branch pipe 8 is buried inside the pier 1, and then connect the outlet main pipe 2 to the cooling pool 6, and connect the water supply main pipe 5 to the water pump 7 and the cooling pool 6, and then connect the first flange 301 on the outlet main pipe 2 with the second flange 304, so that the positioning block 302 on the first flange 301 is engaged with the positioning groove on the second flange 304. The first connecting seat 305 is placed against the first flange 301, and the second connecting seat 306 is placed against the second flange 304. Then the worker manually pushes the fixing frame 311 to rotate along the connection with the second connecting plate 308. While the fixing frame 311 rotates, it drives the elliptical extrusion block 310 to apply pressure to the push plate 309 on the first connecting plate 307, so that the first connecting seat 305 drives the first flange 301 and the second connecting seat 306 drives the second flange 304 to approach each other, and then the limit pin 312 is inserted to fix the fixing frame 311.
[0033] The surface of the first flange 301 is fixedly connected with a plurality of positioning blocks 302, and the surface of the second flange 304 is provided with a plurality of positioning grooves. The surface of the first flange 301 is fixedly connected with a sealing gasket 303, and the sealing gasket 303 is made of rubber. The surface of the second connecting plate 308 is slidably connected with a limiting pin 312, and the limiting pin 312 is slidably connected with the fixing frame 311. The positioning blocks 302 on the first flange 301 and the positioning grooves on the second flange 304 are matched to improve the stability of the water outlet main pipe 2 when connected, and also improve the convenience during installation. The rubber sealing ring between the first flange 301 and the second flange 304 enhances the sealing of the connection between the two water outlet main pipes 2, and minimizes the possibility of cooling water leakage. The limiting pin 312 on the second connecting plate 308 improves the stability of the connecting device 3 when in use, so that when the fixing frame 311 is shaken by external force, the extrusion block 310 will not fall off the push plate 309.
[0034] like Figure 2 and Figure 5As shown, the fixing device 4 includes a threaded sleeve 42, which is slidably connected to the pier 1, and a screw 43 is threadedly connected to the surface of the threaded sleeve 42. One end of the screw 43 is fixedly connected to a first clamping ring 44, and the first clamping ring 44 is rotatably connected to a rotating shaft 48. The surface of the rotating shaft 48 is rotatably connected to a second clamping ring 45. The surfaces of the first clamping ring 44 and the second clamping ring 45 are both sleeved with the water outlet main pipe 2, and the surfaces of the first clamping ring 44 and the second clamping ring 45 are slidably connected to a screw 46, and the surface of the screw 46 is threadedly connected to a nut 47. When a temperature control device for the hydration heat construction of hollow high pier concrete needs to be installed with a water outlet main pipe 2, first a hole is drilled on the inner wall of the pier 1, and then the threaded sleeve 42 is fixed in the hole on the inner wall of the pier 1, and then the screw 43 connected with the first clamping ring 44 is screwed into the threaded sleeve 42, and the limiting ring 41 on the surface of the water outlet main pipe 2 is aligned with the groove of the first clamping ring 44, and then the water outlet main pipe 2 is placed in the first clamping ring 44, and then the second clamping ring 45 is rotated along the rotating shaft 48 so that the second clamping ring 45 wraps the water outlet main pipe 2, and then the screw 46 is passed through the first clamping ring 44 and the second clamping ring 45, and then the first clamping ring 44 and the second clamping ring 45 are fixed with the nut 47.
[0035] The inner walls of the first clamp ring 44 and the second clamp ring 45 are fixedly connected with anti-skid pads 49, and the surfaces of the anti-skid pads 49 are provided with anti-skid grooves. The surface of the water outlet main pipe 2 is fixedly connected with a limit ring 41, and the cross section of the limit ring 41 is circular. The anti-skid pads 49 on the surfaces of the first clamp ring 44 and the second clamp ring 45 make the first clamp ring 44 and the second clamp ring 45 more stable when clamping the water outlet main pipe 2, and also increase the friction between the first clamp ring 44 and the second clamp ring 45 and the surface of the water outlet main pipe 2. The surface limit ring 41 of the water outlet main pipe 2 cooperates with the first clamp ring 44 and the second clamp ring 45 to limit the water outlet main pipe 2 so that it will not fall off accidentally.
[0036] Working principle:
[0037] When a temperature control device for the hydration heat construction of hollow high pier concrete is needed to be used, first install the outlet main pipe 2 and the water supply main pipe 5, then connect the outlet main pipe 2 and the water supply main pipe 5 to the branch pipe 8, the branch pipe 8 is buried inside the pier 1, and then connect the outlet main pipe 2 to the cooling pool 6, and connect the water supply main pipe 5 to the water pump 7 and the cooling pool 6, and then connect the first flange 301 on the outlet main pipe 2 with the second flange 304, so that the positioning block 302 on the first flange 301 is engaged with the positioning groove on the second flange 304, and then the first connecting seat 305 is pressed against the first flange 301, and then the second connecting seat 306 is pressed against the second flange 304, and then the worker manually pushes the fixing frame 311 to rotate along the place connected with the second connecting plate 308, and while the fixing frame 311 rotates, it drives the elliptical extrusion block 310 to apply pressure to the push plate 309 on the first connecting plate 307, so that the first connecting seat 305 The first flange 301 and the second connecting seat 306 drive the second flange 304 to approach each other, and then the limiting pin 312 is inserted to fix the fixing frame 311. The rubber sealing ring between the first flange 301 and the second flange 304 enhances the sealing performance of the connection between the two water outlet main pipes 2 and minimizes the possibility of cooling water leakage. The positioning block 302 on the first flange 301 cooperates with the positioning groove on the second flange 304 to improve the stability of the water outlet main pipe 2 during connection, and also improves the convenience during installation. The limiting pin 312 on the second connecting plate 308 improves the stability of the connecting device 3 during use, so that when the fixing frame 311 is shaken by external force, the extrusion block 310 will not fall off the pushing plate 309. By setting the connecting device 3, the problem of complicated steps when connecting the water outlet main pipe 2 is solved, the installation and disassembly of the water outlet main pipe 2 is facilitated, and the convenience of equipment use is further improved.
[0038] When a temperature control device for the hydration heat construction of hollow high pier concrete needs to be installed with a water outlet main pipe 2, first, a hole is drilled in the inner wall of the pier 1, and then the threaded sleeve 42 is fixed in the hole in the inner wall of the pier 1, and then the screw 43 connected with the first clamping ring 44 is screwed into the threaded sleeve 42, and the limiting ring 41 on the surface of the water outlet main pipe 2 is aligned with the groove of the first clamping ring 44, and then the water outlet main pipe 2 is placed in the first clamping ring 44, and then the second clamping ring 45 is rotated along the rotating shaft 48 so that the second clamping ring 45 wraps the water outlet main pipe 2, and then the screw 46 is passed through the first clamping ring 44 and the second clamping ring 45, and then the first clamping ring is fixed with a nut 47. The ring 44 is fixed with the second clamping ring 45, and the anti-slip pad 49 on the surface of the first clamping ring 44 and the second clamping ring 45 makes the first clamping ring 44 and the second clamping ring 45 more stable when clamping the water outlet main pipe 2, and also increases the friction between the first clamping ring 44 and the second clamping ring 45 and the surface of the water outlet main pipe 2. The surface limiting ring 41 of the water outlet main pipe 2 and the first clamping ring 44 and the second clamping ring 45 cooperate to limit the water outlet main pipe 2 so that it will not fall off accidentally. By setting the fixing device 4, the problem of installing the water outlet main pipe 2 on the pier 1 is solved, and the stability of the connection between the water outlet main pipe 2 and the pier 1 is improved.
[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A temperature control device for the hydration heat construction of hollow high pier concrete, comprising a pier (1), a water supply main pipeline (5), and a water outlet main pipeline (2), characterized in that: The water supply main pipe (5) is connected to a water pump (7), one end of the water outlet main pipe (2) is connected to a cooling pool (6), the cooling pool (6) is connected to the water supply main pipe (5), the surfaces of the water outlet main pipe (2) and the water supply main pipe (5) are both connected to branch pipes (8), the surface of the water outlet main pipe (2) is provided with a connecting device (3), the connecting device (3) comprises a first flange (301), the first flange (301) is fixedly connected to the water outlet main pipe (2), the surface of the first flange (301) is against the surface of a first connecting seat (305), the surface of the first connecting seat (305) is fixedly connected to the water outlet main pipe (2), the surface of the first flange (301) is against the surface of a first connecting seat (305), and the surface of the first connecting seat (305) is fixedly connected to the water outlet main pipe (2). A second connecting plate (308) is fixedly connected, the surface of the second connecting plate (308) is rotatably connected to an extrusion block (310), the side wall of the extrusion block (310) is fixedly connected to a fixing frame (311), the surface of the extrusion block (310) is slidably connected to a push plate (309), the surface of the push plate (309) is fixedly connected to a first connecting plate (307), the surface of the first connecting plate (307) is fixedly connected to a second connecting seat (306), the surface of the second connecting seat (306) is against the surface of a second flange (304), and the second flange (304) is fixedly connected to the water outlet main pipe (2).
2. A temperature control device for hydration heat construction of hollow high pier concrete according to claim 1, characterized in that: A plurality of positioning blocks (302) are fixedly connected to the surface of the first flange (301), and a plurality of positioning grooves are provided on the surface of the second flange (304).
3. A temperature control device for hollow high pier concrete hydration heat construction according to claim 1, characterized in that: A sealing gasket (303) is fixedly connected to the surface of the first flange (301), and the sealing gasket (303) is made of rubber.
4. A temperature control device for hollow high pier concrete hydration heat construction according to claim 1, characterized in that: The surface of the second connecting plate (308) is slidably connected to a limit pin (312), and the limit pin (312) is slidably connected to the fixing frame (311).
5. A temperature control device for hydration heat construction of hollow high pier concrete according to claim 1, characterized in that: The surface of the bridge pier (1) is provided with a fixing device (4), the fixing device (4) comprising a threaded sleeve (42), the threaded sleeve (42) being slidably connected to the bridge pier (1), the surface of the threaded sleeve (42) being threadedly connected to a screw rod (43), one end of the screw rod (43) being fixedly connected to a first clamping ring (44), the first clamping ring (44) being rotatably connected to a rotating shaft (48), the surface of the rotating shaft (48) being rotatably connected to a second clamping ring (45), the surfaces of the first clamping ring (44) and the second clamping ring (45) being sleeved with a water outlet main pipe (2), the surfaces of the first clamping ring (44) and the second clamping ring (45) being slidably connected to a screw (46), the surface of the screw (46) being threadedly connected to a nut (47).
6. A temperature control device for hollow high pier concrete hydration heat construction according to claim 5, characterized in that: The inner walls of the first clamping ring (44) and the second clamping ring (45) are both fixedly connected with anti-skid pads (49), and the surfaces of the anti-skid pads (49) are provided with anti-skid grooves.