Construction engineering cost budgeting facility box
By designing large tool slots, classification slots and fixing devices in the construction project cost budget facility box, the problem of messy tool storage is solved, the effective classification and fixation of tools is achieved, the search efficiency is improved and data is protected.
Patent Information
- Application Number
- CN202421780934.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-07-25
AI Technical Summary
In the existing construction project cost budget facility box, the tools are stored in messy ways, and it is impossible to effectively distinguish and search, resulting in difficulty in using it.
A construction project cost budget facility box is designed, including large tool slots, classification slots, isolation plates, elastic belts, U-shaped blocks and hooks, and the classification storage and fixation of tools are achieved through these structures.
It realizes effective classification and fixation of tools, avoids collision and movement between tools, improves tool search efficiency, and protects data areas from tool damage.
Smart Images

Figure CN222443529U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of facility boxes, in particular to a construction engineering cost budget facility box. Background Art
[0002] A construction project refers to an engineering entity formed through the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines and equipment. The construction project cost generally refers to the cost spent on carrying out a certain project construction.
[0003] In the construction engineering cost budget facility box used in the prior art, different storage items cannot be stored separately, resulting in messy storage of tools and difficulty in finding them when needed. Utility Model Content
[0004] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a construction engineering cost budget facility box to solve the above problems.
[0005] In view of this, the utility model provides a construction engineering cost budget facility box, comprising:
[0006] A box body, wherein a box cover is rotatably connected to the side wall at the top of the box body;
[0007] Large tool slot, set on one side of the top of the box;
[0008] A classification slot is arranged on the other side of the top of the box body, and isolation plates are connected to the two side walls of the classification slot, and the isolation plates divide the classification slot into a small tool area and a data area;
[0009] A mounting block is disposed on a side wall of the large tool slot;
[0010] A U-shaped block, with both ends connected to the other side wall of the large tool slot;
[0011] and an elastic band, one end of which is connected to the mounting block, and the other end of which is buckled on the U-shaped block by a buckle;
[0012] When a large tool is placed in the large tool slot, the elastic band tightens the outer wall of the large tool and then buckles it on the U-shaped block, thereby preventing the large tool from moving at will.
[0013] By adopting the above technical scheme, through the setting of the large tool slot, large measuring tools can be placed, and through the setting of the small tool area, small tools can be stored to prevent small tools from being mixed with large tools. Firstly, collisions can be avoided, and secondly, the positions of small tools can be better found. Through the setting of the data area, statistical data can be specially placed so that they will not be damaged by tools and can be better taken. Through the setting of the elastic band, large measuring tools can be fixed and tightened. Through the cooperation of the U-shaped block and the buckle, the elastic band can fix the large measuring tools, and the large measuring tools will not shift at will, thereby preventing the large measuring tools from being damaged by collisions caused by the movement of the box.
[0014] Furthermore, a sponge pad is provided at the bottom of the large tool slot.
[0015] Furthermore, a plurality of hooks are provided at intervals on the side walls of the small tool area.
[0016] Furthermore, a battery is embedded in the top of the box, and a charging port is provided on the battery.
[0017] Furthermore, a plurality of partition plates are inserted into the two side walls of the data area, and the plurality of partition plates are arranged at intervals on the inner wall of the data area, wherein the inner wall of the data area is provided with insertion grooves for inserting the partition plates. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 It is a schematic diagram of the overall structure of a specific implementation method of the utility model.
[0020] Figure numerals: 1. Box body; 2. Box cover; 3. Large tool slot; 4. Partition plate; 5. Small tool area; 6. Data area; 7. Mounting block; 8. Elastic band; 9. U-shaped block; 10. Hook; 11. Sponge pad; 12. Hook; 13. Battery; 14. Charging port; 15. Partition plate; 16. Plug slot. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.
[0022] In the description of the present application, it should be noted that the terms used herein are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present application. For ease of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship. The technology, methods and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be regarded as part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, rather than as a limitation. Therefore, other examples of the exemplary embodiments may have different values. It should be noted that similar numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further discussed in subsequent drawings.
[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0024] It should be noted that, in the description of the present application, the orientation or positional relationship indicated by terms such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description. Unless otherwise stated, these orientation words do not indicate or imply that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the scope of protection of the present application; the orientation words "inside and outside" refer to the inside and outside relative to the contour of each component itself.
[0025] It should be noted that, in the present application, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises one..." does not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be noted that the scope of the method and device in the embodiment of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.
[0026] Embodiment 1:
[0027] This embodiment provides a construction project cost budget facility box, including:
[0028] A box body 1, a box cover 2 is rotatably connected to the side wall at the top of the box body 1;
[0029] A large tool slot 3 is provided on one side of the top of the box body 1;
[0030] A classification slot is arranged at the other side of the top of the box body 1, and isolation plates 4 are connected to the two side walls of the classification slot, and the isolation plates 4 divide the classification slot into a small tool area 5 and a data area 6;
[0031] A mounting block 7 is disposed on a side wall of the large tool slot 3;
[0032] A U-shaped block 9, both ends of which are connected to the other side wall of the large tool slot 3;
[0033] and an elastic band 8, one end of which is connected to the mounting block 7, and the other end of which is buckled on the U-shaped block 9 by means of a buckle hook 10;
[0034] When a large tool is placed in the large tool slot 3, the elastic band 8 tightens the outer wall of the large tool and then buckles it on the U-shaped block 9, thereby preventing the large tool from moving at will;
[0035] By setting the large tool slot 3, large measuring tools can be placed. By setting the small tool area 5, small tools can be stored to prevent small tools from being mixed with large tools. First, collisions can be avoided. Secondly, the location of small tools can be better found. By setting the data area 6, statistical data can be specially placed so that they will not be damaged by tools and can be better taken. By setting the elastic band 8, large measuring tools can be fixed and tightened. By cooperating with the U-shaped block 9 and the buckle 10, the elastic band 8 can fix the large measuring tools, and the large measuring tools will not shift at will, thereby preventing the large measuring tools from being damaged by collisions caused by the movement of the box 1.
[0036] Embodiment 2:
[0037] In this embodiment, in addition to the structural features of the aforementioned embodiment, a sponge pad 11 is further provided at the bottom of the large tool slot 3;
[0038] The sponge pad 11 can be provided to prevent the large measuring tool from rubbing and colliding with the bottom of the large tool groove 3 .
[0039] Embodiment 3:
[0040] In this embodiment, in addition to the structural features of the aforementioned embodiment, a plurality of hooks 12 are provided at intervals on the side wall of the small tool area 5;
[0041] By setting the hook 12, tools with hanging parts can be hung, so as to achieve better distinction.
[0042] Embodiment 4:
[0043] In this embodiment, in addition to the structural features of the aforementioned embodiments, a battery 13 is embedded in the top of the box 1, and a charging port 14 is provided on the battery 13;
[0044] By providing the storage battery 13 and the charging port 14 , the operator can charge the measuring tool and his own electronic equipment.
[0045] Embodiment 5:
[0046] In this embodiment, in addition to the structural features of the aforementioned embodiment, a plurality of partition plates 15 are inserted into the two side walls of the data area 6, and the plurality of partition plates 15 are arranged at intervals on the inner wall of the data area 6, wherein the inner wall of the data area 6 is provided with a plug-in slot 16 for the partition plates 15 to be inserted;
[0047] Through the cooperation between the insertion slot 16 and the partition plate 15 , the data area 6 can be divided into a plurality of areas so that different data can be placed in different positions.
[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction project cost budget facility box, characterized in that: include: A box body (1), wherein a box cover (2) is rotatably connected to a side wall at the top of the box body (1); A large tool slot (3) is arranged on one side of the top of the box body (1); A classification slot is arranged on the other side of the top of the box body (1), and isolation plates (4) are connected to the two side walls of the classification slot, and the isolation plates (4) divide the classification slot into a small tool area (5) and a data area (6); A mounting block (7) is arranged on a side wall of the large tool slot (3); A U-shaped block (9), both ends of which are connected to the other side wall of the large tool slot (3); and an elastic band (8), one end of which is connected to the mounting block (7) and the other end of which is buckled on the U-shaped block (9) by means of a buckle hook (10); When a large tool is placed in the large tool slot (3), the elastic band (8) tightens the outer wall of the large tool and then buckles it on the U-shaped block (9), thereby preventing the large tool from moving at will.
2. A construction engineering cost budget facility box according to claim 1, characterized in that: The bottom of the large tool groove (3) is provided with a sponge pad (11).
3. A construction engineering cost budget facility box according to claim 1, characterized in that: A plurality of hooks (12) are arranged at intervals on the side wall of the small tool area (5).
4. A construction engineering cost budget facility box according to claim 1, characterized in that: A storage battery (13) is embedded in the top of the box body (1), and a charging port (14) is provided on the storage battery (13).
5. A construction engineering cost budget facility box according to claim 1, characterized in that: A plurality of partition plates (15) are inserted into the two side walls of the data area (6), and the plurality of partition plates (15) are arranged at intervals on the inner wall of the data area (6), wherein the inner wall of the data area (6) is provided with a plug-in slot (16) for the partition plates (15) to be plugged in.