Bridge pre-embedded connecting structure based on BIM (Building Information Modeling) technology

By pre-embedding the bridge tray pre-embedding section before pouring the floor concrete, the problems of high installation cost and difficult formwork processing of traditional cable trays are solved, and the convenience of installation and waterproof performance are improved.

CN222464050UActive Publication Date: 2025-02-11THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420509471.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2025-02-11
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The traditional method of installing cable trays along the shaft has problems such as high construction costs, difficult formwork treatment, and large amounts of construction waste.

Method used

The bridge tray embedded connection structure based on BIM technology is adopted. By setting up the upper and lower bridge trays in the embedded sections in the top and bottom plates, and the connection is fixed by bolts, the traditional procedure of reserved bridge tray holes and sealing holes is eliminated.

Benefits of technology

It achieves convenient and fast installation, reduces construction costs, reduces the generation of construction waste, and improves the waterproof performance at the joints of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222464050U_ABST
    Figure CN222464050U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge frame pre-embedded connecting structure based on BIM technology, which comprises at least one connecting structure unit, and the connecting structure unit comprises two pre-embedded sections, a top plate, a bottom plate, an upper bridge frame and a lower bridge frame; the two embedded sections are respectively arranged in the top plate and the bottom plate; the embedded section comprises a base which is a square pipe fitting, and an upper connecting plate and a lower connecting plate are arranged at the upper end and the lower end of the base respectively. Connecting holes are formed in the upper connecting plate and the lower connecting plate; the side faces of the two ends of the upper bridge frame and the lower bridge frame are respectively provided with a screw hole used for passing of a crossing grounding wire. The screw holes are provided with guiding pieces used for guiding the crossing grounding wire. Fasteners used for arranging lines are arranged in the upper bridge frame and the lower bridge frame. The utility model solves the technical problems that the pre-embedding construction cost of the bridge frame is high, the template is not easy to process and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge pre-embedded joints, in particular to a bridge pre-embedded connection structure based on BIM technology. Background Art

[0002] BIM building information model is convenient for all parties involved in the project. When using it, the distribution cables need to be protected by the installation of bridges. In the project's residential and office main buildings, each floor is equipped with a distribution well, and the distribution wells on each floor are in a unified position. There are several busbars and cable bridges in the distribution well. Due to the limited space in the distribution well and the need to pass through the floor slab for laying, the cable bridge is usually installed along the shaft. The traditional method of installing the cable bridge is: before construction, prepare foam blocks of appropriate size or use templates to nail rectangular wooden boxes to make a mold for the reserved bridge opening, and fix the mold on the template before pouring the floor concrete. After the concrete solidifies, remove the mold of the reserved opening. It mainly includes the following steps: determine the size of the reserved opening - make a mold according to the size of the reserved hole - fix the mold on the template - pour concrete - remove the template - clean the opening - install the bridge - lay wires and cables - cover the bridge cover - fireproof sealing of the opening.

[0003] The above-mentioned cable bridge installation method along the shaft has the following main shortcomings: 1. The reserved hole mold is made of foam board or wood board, which needs to be removed separately after pouring concrete. The operation is cumbersome and increases the construction cost, generates a large amount of construction waste, and the foam board also pollutes the construction site environment. 2. The bridge hole also needs to be suspended and filled with fine stone concrete for fireproof blocking, especially the position of the bridge cover, which is difficult to handle. Based on this, it is necessary to provide a bridge pre-buried structure that is easy to install and does not require the demoulding procedure after pouring concrete. Utility Model Content

[0004] The utility model aims to provide a pre-buried bridge connection structure based on BIM technology, which aims to solve the technical problems of high construction cost of pre-buried bridge and difficult template processing.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] The utility model provides a pre-embedded connection structure of a bridge frame based on BIM technology, comprising at least one connection structure unit, the connection structure unit comprising two pre-embedded sections, a top plate, a bottom plate, an upper bridge frame and a lower bridge frame; the two pre-embedded sections are respectively arranged in the top plate and the bottom plate; the pre-embedded section comprises a base, the base is a square pipe fitting, and an upper connecting plate and a lower connecting plate are respectively arranged at the upper and lower ends of the base; the upper connecting plate and the lower connecting plate are both provided with connection holes; the upper end of the upper bridge frame is fixedly arranged on the lower connecting plate of the pre-embedded section of the top plate by bolts, the lower end is fixedly connected with the upper end of the bridge frame by bolts, and the lower end of the lower bridge frame is fixedly arranged on the upper connecting plate of the pre-embedded section of the bottom plate by bolts; the sides at both ends of the upper bridge frame and the lower bridge frame are respectively provided with screw holes for passing the jumper ground wire, and the screw holes are provided with guide members for guiding the jumper ground wire; fasteners for arranging lines are also arranged inside the upper bridge frame and the lower bridge frame.

[0007] Preferably, a waterproof felt is provided on the inner side of the joint between the upper bridge frame and the lower bridge frame.

[0008] Preferably, the upper connecting plate is arranged on a set of opposite sides of the top end of the base, and the lower connecting plate is arranged symmetrically with the upper connecting plate.

[0009] Preferably, the height of the base is not less than the thickness of the top plate or the bottom plate, and the width of the base is greater than the widths of the upper connecting plate and the lower connecting plate.

[0010] Preferably, the upper connecting plate and the lower connecting plate are integrally formed with the base.

[0011] Preferably, the upper connecting plate and the lower connecting plate are both hingedly connected to the base via hinges.

[0012] Preferably, the connecting holes are circular holes, and two rows are arranged on the upper connecting plate or the lower connecting plate, with at least three holes arranged in each row.

[0013] Preferably, the connecting holes are vertical strip holes, and two of them are arranged on the upper connecting plate or the lower connecting plate.

[0014] The beneficial effects of the utility model are embodied in:

[0015] 1) The utility model provides a bridge pre-embedded connection structure based on BIM technology. The bridge pre-embedded section used to connect the bridge in the utility model is pre-embedded before pouring the floor slab concrete, eliminating the traditional procedures of reserving bridge openings and blocking the openings. When installing the bridge, one section is tightened with bolts to the lower connecting plate of the top plate bridge pre-embedded section, and the other section is tightened with the upper connecting plate of the bottom plate bridge pre-embedded part, and then the two sections are fixed and the bridge grounding jumper is installed. The installation is convenient and quick.

[0016] 2) The utility model provides a pre-buried connection structure of a bridge based on BIM technology, wherein the upper bridge and the lower bridge are both provided with fasteners for arranging the lines, so that the lines inside the bridge can be arranged when threading; guide pieces are provided at the screw holes of the jumper ground wires on the bridge, so that the jumper wires can be protected and the guiding and arranging functions can be achieved; waterproof felt is also provided at the joints between the upper bridge and the lower bridge, so as to enhance the waterproof performance of the bridge joints and prevent the harm caused by water leakage.

[0017] Other features and advantages of the utility model will be described in the following description, and partly become apparent from the description, or understood by implementing the utility model. The main purpose and other advantages of the utility model can be realized and obtained by the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0019] Figure 1 It is a structural schematic diagram of the utility model.

[0020] Figure 2 This is a schematic diagram of the first type of connection hole of the embedded joint of the utility model.

[0021] Figure 3 It is a schematic diagram of the second connection hole of the embedded joint of the utility model.

[0022] Figure 4 It is a schematic diagram of the fastener position of the utility model.

[0023] Figure 5 It is a schematic diagram of the bending of the upper connecting plate and the lower connecting plate of the utility model.

[0024] Figure numerals: 1-embedded section, 2-top plate, 3-bottom plate, 4-upper bridge frame, 5-lower bridge frame, 6-guide member, 7-fastener, 8-waterproof felt, 11-base, 12-upper connecting plate, 13-lower connecting plate, 14-connecting hole. DETAILED DESCRIPTION

[0025] The technical solution of the present invention is described in detail below through embodiments. The following embodiments are merely exemplary and can only be used to explain and illustrate the technical solution of the present invention, but cannot be construed as limiting the technical solution of the present invention.

[0026] Reference Figure 1-3The utility model provides a bridge pre-embedded connection structure based on BIM technology, including at least one connection structure unit, the connection structure unit includes two pre-embedded nodes 1, a top plate 2, a bottom plate 3, an upper bridge frame 4 and a lower bridge frame 5; a waterproof felt 8 can be provided on the inner side of the joint between the upper bridge frame 4 and the lower bridge frame 5 for waterproofing; the two pre-embedded nodes 1 are respectively arranged in the top plate 2 and the bottom plate 3; the pre-embedded node 1 includes a base 11, the base 11 is a square pipe fitting, the height of the base 11 is not less than the thickness of the top plate 2 or the bottom plate 3, and the width of the base 11 is greater than the width of the upper connecting plate 12 and the lower connecting plate 13; the upper connecting plate 12 and the lower connecting plate 13 are respectively provided at the upper and lower ends of the base 11 3, wherein the upper connecting plate 12 is arranged on a group of opposite sides at the top of the base 11, and the lower connecting plate 13 is symmetrically arranged with the upper connecting plate 12; the upper connecting plate 12 and the upper connecting plate 12 are integrally formed with the base 11 or are hingedly connected to the base 11 by hinges; the upper end of the upper bridge frame 4 is fixedly arranged on the lower connecting plate 13 of the embedded section 1 of the top plate 2 by bolts, and the lower end is fixedly connected to the upper end of the bridge frame by bolts, and the lower end of the lower bridge frame 5 is fixedly arranged on the upper connecting plate 12 of the embedded section 1 of the bottom plate 3 by bolts; the sides of the two ends of the upper bridge frame 4 and the lower bridge frame 5 are respectively provided with screw holes for passing the jumper ground wire, and the screw holes are provided with guide members 6 for guiding the jumper ground wire.

[0027] Reference Figure 2-3 The upper connecting plate 12 and the lower connecting plate 13 are both provided with connecting holes 14. The connecting holes 14 can take two shapes. One is a circular hole, two rows are provided on the upper connecting plate 12 or the lower connecting plate 13, and at least three holes are provided in each row; the other is a vertical strip hole, two rows are provided on the upper connecting plate 12 or the lower connecting plate 13.

[0028] Reference Figure 4 A plurality of fasteners 7 for arranging the lines are also arranged inside the upper bridge frame 4 and the lower bridge frame 5 .

[0029] Working principle of the utility model: When the utility model is used, firstly, the line is arranged and passed through the fastener 7, and then the upper bridge frame 4 and the lower bridge frame 5 are fixed by bolts, the upper bridge frame 4 and the top plate 2 embedded section 1 are connected by bolts, and the lower bridge frame 5 and the bottom plate 3 embedded section 1 are connected by bolts; after the upper bridge frame 4 and the lower bridge frame 5 are installed, a waterproof felt 8 is attached to the joint of the upper bridge frame 4 and the lower bridge frame 5; the jumper ground wire is connected and the jumper ground wire is arranged through the guide member 6, refer to Figure 5 , bend the upper connecting plate 12 of the embedded section 1 located on the topmost top plate 2 90 degrees to the upper end surface of the top plate 2 and fix it, and bend the lower connecting plate 13 of the embedded section 1 located on the bottommost bottom plate 3 90 degrees to the lower end surface of the bottom plate 3 and fix it.

[0030] The above description is only a preferred specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field thinks of within the technical scope disclosed in the present invention should be included in the protection scope of the present invention.

Claims

1. A bridge pre-buried connection structure based on BIM technology, characterized by: It comprises at least one connection structure unit, which comprises two pre-buried joints (1), a top plate (2), a bottom plate (3), an upper bridge frame (4) and a lower bridge frame (5); Two embedded sections (1) are respectively arranged in the top plate (2) and the bottom plate (3); the embedded section (1) comprises a base (11), the base (11) is a square pipe, and an upper connecting plate (12) and a lower connecting plate (13) are respectively arranged at the upper and lower ends of the base (11); the upper connecting plate (12) and the lower connecting plate (13) are both provided with connecting holes (14); The upper end of the upper bridge frame (4) is fixedly arranged on the lower connecting plate (13) of the embedded section (1) of the top plate (2) by bolts, and the lower end is fixedly connected to the upper end of the bridge frame by bolts, and the lower end of the lower bridge frame (5) is fixedly arranged on the upper connecting plate (12) of the embedded section (1) of the bottom plate (3) by bolts; the sides of both ends of the upper bridge frame (4) and the lower bridge frame (5) are respectively provided with screw holes for passing the jumper ground wire, and the screw holes are provided with guide members (6) for guiding the jumper ground wire; and fasteners (7) for arranging the lines are also provided inside the upper bridge frame (4) and the lower bridge frame (5).

2. The pre-buried bridge connection structure based on BIM technology as claimed in claim 1, characterized in that: A waterproof felt (8) is provided on the inner side of the joint between the upper bridge frame (4) and the lower bridge frame (5).

3. The pre-buried bridge connection structure based on BIM technology according to claim 1, characterized in that: The upper connecting plate (12) is arranged on a set of opposite sides at the top of the base (11), and the lower connecting plate (13) is arranged symmetrically with the upper connecting plate (12).

4. The pre-buried bridge connection structure based on BIM technology according to claim 1, characterized in that: The height of the base (11) is not less than the thickness of the top plate (2) or the bottom plate (3), and the width of the base (11) is greater than the widths of the upper connecting plate (12) and the lower connecting plate (13).

5. The pre-buried bridge connection structure based on BIM technology as claimed in claim 1, characterized in that: The upper connecting plate (12) and the lower connecting plate (12) are integrally formed with the base (11).

6. The pre-buried bridge connection structure based on BIM technology according to claim 1, characterized in that: The upper connecting plate (12) and the lower connecting plate (13) are both hingedly connected to the base (11) via hinges.

7. The pre-buried bridge connection structure based on BIM technology according to claim 1, characterized in that: The connection holes (14) are circular holes and are arranged in two rows on the upper connection plate (12) or the lower connection plate (13), with at least three holes arranged in each row.

8. The pre-buried bridge connection structure based on BIM technology according to claim 1, characterized in that: The connection holes (14) are vertical strip holes, and two of them are arranged on the upper connection plate (12) or the lower connection plate (13).