Compression molding production line and compression molding production equipment

By setting up a waste collection box with water in the molding production line, the chemical reaction problem of the rubber caused by the shutdown of the molding press or cooling press is solved, and the production environment and safety of the staff is prevented from occurring, so as to prevent the production environment and the safety of the staff are protected.

CN222473427UActive Publication Date: 2025-02-14HANGZHOU KALAI COMPOSITE MATERIAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421232307.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-02-14
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

When the molding press and/or cooling press is shut down due to a failure, the glue on the composite prefabricated body undergoes chemical reaction due to long-term exposure to the air, producing a large amount of thick smoke, affecting the production environment and endangering the staff.

Method used

A molding production line is designed, including a first conveying line, a glue coating machine, a molding press, a cooling press, a handling device and a waste collection box. The waste collection box is filled with water. When the molding press or cooling press is shut down, the handling device places the composite prefabricated body into the waste collection box to avoid chemical reactions of the glue.

Benefits of technology

It effectively avoids thick smoke caused by chemical reactions of the glue, protects the production environment and prevents harm to the staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222473427U_ABST
    Figure CN222473427U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of composite material production, and discloses a compression molding production line and compression molding production equipment, and the compression molding production line comprises a first conveying line, a gluing machine, a molding press, a cooling press, a carrying device and a waste collecting box, the carrying device can carry the composite material prefabricated body to be cured and / or the composite material prefabricated body to be cooled and shaped into the waste collecting box, and water is contained in the waste collecting box. Namely, when the molding press and / or the cooling press are / is shut down for a long time due to reasons such as faults, the carrying device can throw the composite material preform to be subjected to cooling and shaping operation and / or the composite material preform to be subjected to cooling and shaping operation into the waste collecting box filled with water; therefore, dense smoke generated by chemical reaction of the sizing material is avoided, the influence on the production environment can be avoided, and the harm to workers caused by the dense smoke is eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of composite material production, in particular to a compression molding production line and compression molding production equipment. Background Art

[0002] There are many ways to form composite materials, such as autoclave, resin transfer molding, vacuum infusion, hand lay-up, compression molding, etc. Among them, compression molding is widely used in composite material production because of its advantage of rapid prototyping.

[0003] Specifically, for wet molding, the prior art solidifies the adhesive by placing a composite material preform coated with adhesive into a molding press, and after the curing is completed, the composite material preform is taken out of the molding press and placed in a cooling press for cooling and shaping, thereby forming a composite material product. When the molding press and / or the cooling press stops due to a malfunction or other reasons, the adhesive on the composite material preform to be placed in the molding press and / or the adhesive on the composite material preform taken out of the molding press will be exposed to the air for a long time, thereby causing a violent chemical reaction of the adhesive composed of the resin and the curing agent, thereby generating a large amount of thick smoke, which will affect the production environment and cause harm to the workers.

[0004] Therefore, the above problems need to be solved urgently. Utility Model Content

[0005] The utility model aims to provide a compression molding production line and compression molding production equipment to solve the problem that when a molding press and / or a cooling press stops due to a malfunction or the like, the rubber on the composite material preform will undergo a violent chemical reaction due to long-term exposure to the air, thereby generating a large amount of thick smoke, which will affect the production environment and cause harm to the workers.

[0006] To achieve this purpose, the utility model adopts the following technical solutions:

[0007] The utility model provides a compression molding production line, comprising:

[0008] A first conveying line is configured to convey a composite material preform;

[0009] A glue coating machine, disposed at the downstream side of the first conveying line, the glue coating machine being configured to coat the composite material preform with glue;

[0010] A molding press and a cooling press, wherein the molding press is configured to solidify the adhesive, and the cooling press is configured to cool and shape the composite material preform;

[0011] a transport device configured to transport the composite material preform from the first conveyor line to the molding press, and to transport the composite material preform from the molding press to the cooling press; and

[0012] A waste collection box, wherein the transport device can transport the composite material preform to be cured and / or the composite material preform to be cooled and set into the waste collection box, and the waste collection box is filled with water.

[0013] Preferably, the compression molding production line further comprises a second conveyor line, and the transport device is further configured to transport the composite material preform from the cooling press to the second conveyor line.

[0014] Preferably, the second conveying line is arranged in parallel with the first conveying line.

[0015] Preferably, the glue coating machine comprises a first transfer module and a glue coating head, and the first transfer module is configured to drive the glue coating head to move.

[0016] Preferably, the transport device comprises:

[0017] A first transport mechanism, disposed at a downstream side of the first conveying line, the first transport mechanism being configured to transport the composite material preform from the first conveying line to the molding press; and

[0018] The second transport mechanism is disposed between the molding press and the cooling press, and is configured to transport the composite material preform from the molding press to the cooling press.

[0019] Preferably, the first transport mechanism and the second transport mechanism both include a second transfer module and a transport member, the second transfer module is configured to drive the transport member to move, and the transport member is configured to transport or release the composite material preform.

[0020] Preferably, the handling member comprises a mounting frame and a needle puncture suction cup, and the needle puncture suction cup is mounted on the mounting frame.

[0021] Preferably, a plurality of the acupuncture suction cups are mounted on the mounting frame.

[0022] Preferably, the compression molding production line further comprises a glue injection machine, and the glue injection machine is configured to inject glue into the mold cavity of the molding press.

[0023] On the other hand, the utility model also provides a compression molding production equipment, comprising more than two compression molding production lines as described above.

[0024] Beneficial effects of the utility model:

[0025] In the utility model, the compression molding production line is provided with a waste collection box. When the molding press and / or the cooling press is shut down for a long time due to a malfunction or the like, the handling device can throw the composite material preforms to be cooled and formed and / or the composite material preforms to be cooled and formed into the waste collection box filled with water, thereby avoiding the generation of thick smoke due to chemical reactions of the rubber, thereby avoiding affecting the production environment and eliminating the harm to the workers caused by the thick smoke.

[0026] The compression molding production equipment is equipped with a waste collection box filled with water, so as to avoid the generation of thick smoke due to chemical reactions of the rubber during the production process, thereby avoiding affecting the production environment and eliminating the harm caused to the workers by the thick smoke. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a structural schematic diagram of a compression molding production line in an embodiment of the utility model;

[0028] Figure 2 It is a structural schematic diagram of the handling member in the embodiment of the utility model.

[0029] In the figure:

[0030] 1. First conveyor line; 2. Glue coating machine; 21. First transfer module; 22. Glue coating head; 3. Forming press; 4. Cooling press; 5. Transport device; 51. First transport mechanism; 511. Second transfer module; 512. Transport piece; 5121. Mounting frame; 5122. Needle puncture suction cup; 52. Second transport mechanism; 6. Waste collection box; 7. Second conveyor line; 8. Glue injection machine. DETAILED DESCRIPTION

[0031] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0032] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0034] In the description of this embodiment, the terms "upper", "lower", "right", "left" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0035] The present embodiment provides a compression molding production equipment, which includes a compression molding production line. The compression molding production line is used to compression mold a composite material preform to obtain a composite material product.

[0036] See also Figure 1 and Figure 2 In this embodiment, the compression molding production line includes a first conveyor line 1, a glue coating machine 2, a molding press 3 and a cooling press 4, wherein the first conveyor line 1 is configured to convey the composite material preform, the glue coating machine 2 is arranged on the downstream side of the first conveyor line 1, the glue coating machine 2 is configured to apply glue to the composite material preform, the molding press 3 is configured to solidify the glue, and the cooling press 4 is configured to cool and shape the composite material preform.

[0037] Specifically, the molding press 3 automatically opens and closes the mold and provides a preset pressure, so that the composite material preform can be moved into the molding press 3 and the curing operation can be carried out. A high temperature and high pressure environment can be formed in the mold cavity of the molding press 3. After the preset holding time, the rubber is cured. Then, the molding press 3 automatically opens the mold, and the composite material preform that has completed the curing operation can be taken out from the molding press 3. The cooling press 4 automatically opens and closes the mold and provides a preset pressure, so that the composite material preform that has completed the curing operation can be moved into the cooling press 4 and the cooling and shaping operation can be carried out. After the preset holding time, the composite material preform completes cooling and shaping. Then, the cooling press 4 automatically opens the mold, and the composite material preform can be taken out from the cooling press 4. After the glue coating operation, curing operation and cooling and molding operation, the composite material preform is processed into a composite material product.

[0038] It is understandable that, since the specific structures of the forming press 3 and the cooling press 4 are both prior arts, they will not be described in detail in this embodiment.

[0039] Based on the above, the compression molding production line also includes a transport device 5, which is configured to transport the composite material preform from the first conveyor line 1 to the molding press 3, and to transport the composite material preform from the molding press 3 to the cooling press 4, that is, the transport device 5 can transport the composite material preform on the first conveyor line 1 to the molding press 3 for curing operation. In addition, the transport device 5 can also transport the composite material preform that has completed the curing operation from the molding press 3 to the cooling press 4 for cooling and molding operation.

[0040] In addition to the first conveyor line 1, the glue coating machine 2, the molding press 3, the cooling press 4 and the handling device 5, the compression molding production line also includes a waste collection box 6. The handling device 5 can transport the composite material preforms to be cured and / or the composite material preforms to be cooled and formed into the waste collection box 6, and the waste collection box 6 is filled with water.

[0041] Based on the above, when the molding press 3 stops due to a malfunction or other reasons, if the molding press 3 stops for a longer period of time than the preset time, the handling device 5 will throw the composite material preform that has completed the gluing operation and is to be cured into the waste collection box 6. Since the waste collection box 6 is filled with water, the water can isolate the air to prevent the glue from producing thick smoke due to chemical reactions, thereby avoiding affecting the production environment and eliminating the harm caused to the workers by the thick smoke. Similarly, when the cooling press 4 stops due to a malfunction or other reasons, if the cooling press 4 stops for a longer period of time than the preset time, the handling device 5 will throw the composite material preform that has completed the curing operation and is to be cooled and finalized into the waste collection box 6. Since the waste collection box 6 is filled with water, the water can isolate the air to prevent the glue from producing thick smoke due to chemical reactions, thereby avoiding affecting the production environment and eliminating the harm caused to the workers by the thick smoke. Correspondingly, when the molding press 3 and the cooling press 4 are shut down due to a malfunction or other reasons, if the shutdown time of the molding press 3 and the cooling press 4 exceeds the preset time, the conveying device 5 will throw the composite material preforms to be cured and the composite material preforms to be cooled and formed into the waste collection box 6. Since the waste collection box 6 is filled with water, the water can isolate the air to prevent the rubber from producing thick smoke due to chemical reactions, thereby avoiding affecting the production environment and eliminating the harm to the workers caused by the thick smoke.

[0042] It is understandable that the preset time is set by the staff according to the actual situation, and this embodiment does not impose any specific restrictions on this.

[0043] Based on the above, the compression molding production line is provided with a waste collection box 6. When the molding press 3 and / or the cooling press 4 is shut down for a long time due to a malfunction or the like, the handling device 5 can throw the composite material preforms to be cooled and formed and / or the composite material preforms to be cooled and formed into the waste collection box 6 filled with water, thereby avoiding the generation of thick smoke due to chemical reactions of the rubber, thereby avoiding affecting the production environment and eliminating the harm to the workers caused by the thick smoke.

[0044] In addition, the compression molding production equipment is provided with a waste collection box 6 filled with water, so as to avoid the generation of thick smoke due to chemical reaction of the rubber during the production process, thereby avoiding affecting the production environment and eliminating the harm caused to the workers by the thick smoke.

[0045] In addition to the first conveyor line 1 and the second conveyor line 7, the compression molding production line also includes a second conveyor line 7, and the transport device 5 is also configured to transport the composite material preform from the cooling press 4 to the second conveyor line 7, so as to unload the produced composite material products.

[0046] In this embodiment, the second conveyor line 7 is arranged in parallel with the first conveyor line 1, thereby saving the occupied space of the compression molding production line.

[0047] It can be understood that both the first conveyor line 1 and the second conveyor line 7 can be selected as belt conveyors or chain conveyors, etc., and there is no specific limitation on this in the present embodiment.

[0048] It is worth noting that compression molding includes not only wet molding but also high-pressure molding. The difference between high-pressure molding and wet molding is that the composite material preform is not coated with glue before being placed in the molding press 3, and the gluing operation is carried out in the mold cavity of the molding press 3. Specifically, when the composite material preform is placed in the molding press 3 and the molding press 3 is closed, the glue is injected into the mold cavity of the molding press 3 and the glue is cured under high temperature and high pressure.

[0049] Based on the above, the compression molding production line of this embodiment also includes a glue injection machine 8, which is configured to inject glue into the mold cavity of the molding press 3, that is, the compression molding production line is compatible with both wet molding and high-pressure molding. Specifically, if the composite material preform needs to be wet molded, the glue coating machine 2 coats the composite material preform located on the first conveyor line 1 with glue, and then moves the composite material preform coated with glue into the molding press 3. If the composite material preform needs to be high-pressure molded, the composite material preform is directly transported from the first conveyor line 1 to the molding press 3 by the transport device 5, and then the glue injection machine 8 injects glue into the mold cavity of the molding press 3, and cures the glue under high temperature and high pressure environment.

[0050] It is understandable that, for high pressure molding, the handling device 5 throws the composite material preforms to be cooled and formed into the waste collection box 6 only when the cooling press 4 stops for a long time due to a malfunction or other reasons.

[0051] It is worth noting that, since the specific structure and working principle of the glue injection machine 8 are all prior art, they will not be described in detail in this embodiment.

[0052] Based on the above, the glue coating machine 2 includes a first transfer module 21 and a glue coating head 22. The first transfer module 21 is configured to drive the glue coating head 22 to move, so as to automatically coat the composite material preform with glue, thereby improving production efficiency.

[0053] It is understandable that the first transfer module 21 may be selected as a driving structure such as a robot or a three-axis motion platform, and this is not specifically limited in the present embodiment.

[0054] Furthermore, the conveying device 5 includes a first conveying mechanism 51 and a second conveying mechanism 52. The first conveying mechanism 51 is arranged on the downstream side of the first conveyor line 1, and the first conveying mechanism 51 is configured to convey the composite material preform from the first conveyor line 1 to the molding press 3. In addition, the first conveying mechanism 51 can also convey the composite material preform that has completed the gluing operation and is waiting for the curing operation to the waste collection box 6, while the second conveying mechanism 52 is arranged between the molding press 3 and the cooling press 4. The second conveying mechanism 52 is configured to convey the composite material preform from the molding press 3 to the cooling press 4. In addition, the second conveying mechanism 52 can also convey the composite material preform that has completed the curing operation and is waiting for the cooling and shaping operation to the waste collection box 6.

[0055] Based on the above, the first conveying mechanism 51 and the second conveying mechanism 52 work independently and do not interfere with each other, thereby saving the time spent on conveying the composite material preform from the first conveyor line 1 to the molding press 3 and conveying the composite material preform from the molding press 3 to the cooling press 4, thereby further improving production efficiency.

[0056] Exemplarily, after the first conveying mechanism 51 conveys the previous composite material preform from the first conveyor line 1 to the molding press 3 for curing operation, the first conveying mechanism 51 can return to the first conveyor line 1 to move the next composite material preform. After the previous composite material preform completes the curing operation, the second conveying mechanism 52 conveys the composite material preform from the molding press 3 to the cooling press 4. At this time, the first conveying mechanism 51 can directly place the next composite material preform into the molding press 3.

[0057] Furthermore, the first conveying mechanism 51 includes a second transfer module 511 and a handling member 512. The second transfer module 511 is configured to drive the handling member 512 to move. The handling member 512 is configured to carry or release the composite material preform. The first conveying mechanism 51 can automatically carry the composite material preform, thereby further improving production efficiency.

[0058] It is understandable that the second transfer module 511 may be selected as a driving structure such as a robot or a three-axis motion platform, and this is not specifically limited in the present embodiment.

[0059] It is worth noting that the specific structure of the second transport mechanism 52 is the same as that of the first transport mechanism 51 , and therefore, the specific structure of the second transport mechanism 52 will not be described in detail in this embodiment.

[0060] Based on the above, the handling member 512 includes a mounting frame 5121 and a needle puncture suction cup 5122, the needle puncture suction cup 5122 is mounted on the mounting frame 5121, and the second transfer module 511 can drive the mounting frame 5121 to move, thereby transporting the composite material preform. This embodiment can prevent the composite material preform from falling during the process of transporting the composite material preform.

[0061] Furthermore, a plurality of needle puncture suction cups 5122 are installed on the mounting frame 5121, thereby further ensuring that the handling member 512 can stably carry the composite material preform.

[0062] In addition, it should be noted that the compression molding production equipment includes more than two compression molding production lines as described above, thereby further improving production efficiency.

[0063] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.

Claims

1. Compression molding production line, characterized in that: include: A first conveying line (1) is configured to convey composite material preforms; A glue coating machine (2) is arranged at the downstream side of the first conveying line (1), and the glue coating machine (2) is configured to coat the composite material preform with glue; A molding press (3) and a cooling press (4), wherein the molding press (3) is configured to solidify the adhesive, and the cooling press (4) is configured to cool and shape the composite material preform; a transport device (5) configured to transport the composite material preform from the first conveyor line (1) to the molding press (3), and to transport the composite material preform from the molding press (3) to the cooling press (4); and A waste collection box (6), wherein the transport device (5) is capable of transporting the composite material preform to be cured and / or the composite material preform to be cooled and formed into the waste collection box (6), and the waste collection box (6) is filled with water.

2. The compression molding production line according to claim 1, characterized in that: The compression molding production line further comprises a second conveyor line (7), and the transport device (5) is further configured to transport the composite material preform from the cooling press (4) to the second conveyor line (7).

3. The compression molding production line according to claim 2, characterized in that: The second conveying line (7) is arranged parallel to the first conveying line (1).

4. The compression molding production line according to claim 1, characterized in that: The glue coating machine (2) comprises a first transfer module (21) and a glue coating head (22), wherein the first transfer module (21) is configured to drive the glue coating head (22) to move.

5. The compression molding production line according to claim 1, characterized in that: The transport device (5) comprises: a first transport mechanism (51), disposed on the downstream side of the first conveying line (1), the first transport mechanism (51) being configured to transport the composite material preform from the first conveying line (1) to the molding press (3); and The second transport mechanism (52) is arranged between the molding press (3) and the cooling press (4), and the second transport mechanism (52) is configured to transport the composite material preform from the molding press (3) to the cooling press (4).

6. The compression molding production line according to claim 5, characterized in that: The first transport mechanism (51) and the second transport mechanism (52) both comprise a second transfer module (511) and a transport member (512); the second transfer module (511) is configured to drive the transport member (512) to move; and the transport member (512) is configured to transport or release the composite material preform.

7. The compression molding production line according to claim 6, characterized in that: The handling member (512) comprises a mounting frame (5121) and an acupuncture suction cup (5122), and the acupuncture suction cup (5122) is mounted on the mounting frame (5121).

8. The compression molding production line according to claim 7, characterized in that: A plurality of acupuncture suction cups (5122) are mounted on the mounting frame (5121).

9. The compression molding production line according to claim 1, characterized in that: The compression molding production line further comprises a glue injection machine (8), wherein the glue injection machine (8) is configured to inject glue into the mold cavity of the molding press (3).

10. Compression molding production equipment, characterized in that: It comprises two or more compression molding production lines as described in any one of claims 1 to 9.