Drilling platform for highway bridge construction
By designing a drilling platform integrating load-bearing vehicles, elastic telescopic rods, push rods and infrared rangefinders, the problem of insufficient flexibility of traditional fixed drilling platforms in multi-point drilling operations is solved, and high efficiency is achieved. Accurate drilling operation.
Patent Information
- Application Number
- CN202420999557.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-05-10
AI Technical Summary
The traditional highway bridge construction drilling platform is designed as a fixed type, limiting its flexibility in multi-point drilling operations, resulting in the risk of slow construction progress and positioning errors.
A drilling platform including a load-bearing vehicle, an elastic telescopic rod, an electric push rod and an infrared rangefinder was designed to monitor and adjust the position and angle of the load-bearing vehicle in real time through the control system to achieve accurate drilling operations.
Improve construction efficiency, reduce manual intervention and errors, and ensure the accuracy and construction quality of drilling.
Smart Images

Figure CN222478628U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction, in particular to a drilling platform used for highway bridge construction. Background Art
[0002] The drilling platform for highway bridge construction is mainly used for construction operations such as bored piles, and is a key part of the foundation construction of water bridges. Drilling platforms are usually divided into two categories: fixed and floating.
[0003] The patent with the publication number CN214365869U in the traditional design discloses a highway bridge construction drilling platform, including a drilling platform body, a locking rod is connected to the inner thread of the side rod, a connection groove is provided on the outer wall of the middle part of the drill bit, a slurry suction block is movably connected to the outer wall of the connection groove, a water pump is fixedly connected to the right side of the drilling platform body, a liquid outlet pipe is provided on the top of the water pump, a liquid inlet pipe is provided on the bottom of the water pump, a plurality of liquid inlet holes are provided on the outer wall of the slurry suction block, a shock-absorbing spring is fixedly connected to the inner wall of the shock-absorbing ring, and a contact block is fixedly connected to the end of the shock-absorbing spring away from the inner wall of the shock-absorbing ring. The above device is provided with a connection groove on the outer wall of the middle part of the drill bit, a slurry suction block is movably connected to the outer wall of the connection groove, and the end of the liquid inlet pipe away from the water pump is fixedly connected to the slurry suction block. The mud generated during the drilling process is sucked into the liquid outlet pipe by the water pump, thereby improving the drilling efficiency.
[0004] However, there are some problems with traditional technologies: Traditional highway bridge construction drilling platforms are usually designed to be fixed, which limits their flexibility in multi-point drilling operations. In the actual construction process, workers need to constantly determine the precise location of the next hole based on the location of the previous hole, and manually move or adjust the drilling platform to the new location. This cumbersome operation is not only time-consuming and labor-intensive, but may also cause positioning errors due to human factors, thus affecting construction quality;
[0005] In a specific highway bridge construction project, engineers plan to perform multiple drilling operations along the bridge axis to detect foundation conditions. Since the drilling platform is fixed, workers need to first determine the first drilling position according to the design drawings and drill. After completion, workers need to manually move the drilling platform to the next predetermined position and use measuring tools to ensure the accuracy of the new position. This process is repeated between multiple drilling points, which not only leads to slow construction progress, but also increases the risk of drilling position error due to the instability of manual operation. Therefore, we propose a drilling platform for highway bridge construction. Utility Model Content
[0006] In view of the problems existing in the prior art, the utility model provides a drilling platform for highway bridge construction, which solves the problem that the traditional highway bridge construction drilling platform is usually designed to be fixed, which limits its flexibility in multi-point drilling operations. In the actual construction process, workers need to constantly determine the precise position of the next drilling hole based on the position of the previous drilling hole, and manually move or adjust the drilling platform to a new position. This cumbersome operation is not only time-consuming and labor-intensive, but may also cause positioning errors due to human factors, thereby affecting the construction quality.
[0007] The utility model is implemented as follows: a drilling platform for highway bridge construction comprises a carrier vehicle, a drilling assembly is fixedly installed at the rear of the carrier vehicle, two elastic telescopic rods are fixedly installed on both sides of the carrier vehicle, a fixed plate is rotatably installed at the output end of one of the elastic telescopic rods on one side, and a slide is rotatably installed at the output end of the other elastic telescopic rod on one side, the outer portion of the slide is slidably connected to the fixed plate, two first electric push rods are fixedly installed at the lower portion of the fixed plate, and guide plates are fixedly connected at the lower portions of the two first electric push rods, a plurality of infrared rangefinders for implementing distance measurement are also fixedly installed at the upper portion of the carrier vehicle, the infrared rangefinders are electrically connected to the carrier vehicle, and the infrared rangefinders are coaxially arranged with the elastic telescopic rods.
[0008] As a preferred embodiment of the utility model, the load-bearing vehicle comprises a vehicle body, support frames are respectively fixedly installed on both sides of the vehicle body, and gears are rotatably installed inside each of the two sides of the support frames.
[0009] As a preferred embodiment of the utility model, the mounting frame is installed with a track through the outer sleeve of the gear, the two gears are meshingly connected with the track, a drive motor is fixedly installed on one side of the mounting frame, and the output end of the drive motor is fixedly connected to the gear.
[0010] As a preferred embodiment of the utility model, the elastic telescopic rod includes a fixed tube, the fixed tube is fixed to one side of the carrier vehicle, a sliding rod is slidably installed inside the fixed tube, a sliding block is fixedly connected to the outside of the sliding rod, and one side of the sliding block is fixedly connected to the inner wall of the fixed tube through a spring.
[0011] As a preferred embodiment of the utility model, the drilling assembly includes a second electric push rod, which is fixedly mounted on the rear of the carrier vehicle, and a support seat is fixedly mounted on the output end of the second electric push rod, and the support seat is slidably mounted on the rear of the carrier vehicle.
[0012] As a preferred embodiment of the utility model, third electric push rods are fixedly installed at the four corners of the upper part of the support seat, the output end of the third electric push rod is fixedly connected to a lifting platform, a drilling motor is fixedly installed at the lower part of the lifting platform through the support seat and the carrier vehicle, and the output end of the drilling motor is fixedly connected to a drill rod.
[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0014] The utility model control system is integrated on the carrier vehicle, responsible for receiving the data of the infrared rangefinder, and performing corresponding control according to the data. The control system can control the extension and contraction of the electric push rod, the moving direction and speed of the carrier vehicle, and the start and stop of the drilling assembly. When the carrier vehicle is started, the first electric push rod is first controlled to descend by the carrier vehicle control system, so that the guide plate gradually approaches the edge of the highway bridge. Through the precise control of the first electric push rod, the guide plate finally contacts the edge of the highway bridge. After the guide plate contacts the edge of the highway bridge, the fixed plate, the slide plate and the two elastic telescopic rods start to work together. The control system will calculate the bending angle of the guide plate according to the telescopic distance of the elastic telescopic rod measured by the two infrared rangefinders, so as to determine whether the carrier vehicle is parallel to the edge of the highway bridge, and then realize the angle adjustment of the direction of the carrier vehicle. After the angle adjustment is completed, the control system will continue to monitor the distance between the guide plate and the edge of the highway bridge using the infrared rangefinder. By comparing the data of the two infrared rangefinders, the control system can accurately control the movement of the carrier vehicle so that it maintains a specified distance from the edge of the highway bridge. When the carrier vehicle moves to the specified position, the control system will start the drilling assembly to perform the drilling operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure provided by an embodiment of the utility model;
[0016] Figure 2 The utility model embodiment provides Figure 1 Schematic diagram of the structure at A in the middle;
[0017] Figure 3 It is a schematic diagram of the cross-sectional structure of the elastic telescopic rod provided by the embodiment of the utility model;
[0018] Figure 4 It is a schematic diagram of the structure of the load-bearing vehicle provided by an embodiment of the utility model;
[0019] Figure 5 It is a schematic diagram of the structure of a drilling assembly provided in an embodiment of the utility model.
[0020] In the figure: 1, carrier vehicle; 2, drilling assembly; 3, infrared rangefinder; 4, elastic telescopic rod; 5, fixing plate; 6, slide plate; 7, first electric push rod; 8, guide plate;
[0021] 101, vehicle body; 102, support frame; 103, drive motor; 104, crawler track; 105, gear;
[0022] 201, second electric push rod; 202, support seat; 203, third electric push rod; 204, lifting platform; 205, drilling motor; 206, drilling rod;
[0023] 401, fixed tube; 402, sliding rod; 403, sliding block; 404, spring. DETAILED DESCRIPTION
[0024] In order to further understand the content, features and effects of the utility model, the following embodiments are given as examples and described in detail with reference to the accompanying drawings.
[0025] The structure of the utility model is described in detail below in conjunction with the accompanying drawings.
[0026] like Figures 1 to 5 As shown, an embodiment of the utility model provides a drilling platform for highway bridge construction, including a load-bearing vehicle 1, a drilling assembly 2 is fixedly installed at the rear of the load-bearing vehicle 1, two elastic telescopic rods 4 are fixedly installed on both sides of the load-bearing vehicle 1, a fixed plate 5 is rotatably installed on the output end of one of the elastic telescopic rods 4 on one side, and a slide plate 6 is rotatably installed on the output end of the other elastic telescopic rod 4 on one side, the outside of the slide plate 6 is slidably connected to the fixed plate 5, two first electric push rods 7 are fixedly installed on the lower part of the fixed plate 5, and the lower parts of the two first electric push rods 7 are fixedly connected to a guide plate 8, and a plurality of infrared rangefinders 3 for ranging are also fixedly installed on the upper part of the load-bearing vehicle 1, the infrared rangefinder 3 is electrically connected to the load-bearing vehicle 1, and the infrared rangefinder 3 is coaxially arranged with the elastic telescopic rod 4.
[0027] The above-mentioned drilling platform for highway bridge construction, the control system is integrated on the carrier vehicle 1, responsible for receiving the data of the infrared rangefinder 3, and performing corresponding control according to the data. The control system can control the extension and contraction of the electric push rod, the moving direction and speed of the carrier vehicle 1, and the start and stop of the drilling assembly 2. When the carrier vehicle 1 is started, the first electric push rod 7 is first controlled by the carrier vehicle 1 control system to descend, so that the guide plate 8 gradually approaches the edge of the highway bridge. Through the precise control of the first electric push rod 7, the guide plate 8 finally contacts the edge of the highway bridge. After the guide plate 8 contacts the edge of the highway bridge, the fixed plate 5, the slide plate 6 and the two elastic telescopic rods 4 start to work together. The control system will calculate the bending angle of the guide plate 8 according to the telescopic distance of the elastic telescopic rod 4 measured by the two infrared rangefinders 3, so as to determine whether the carrier vehicle 1 is traveling parallel to the edge of the highway bridge, and then realize the angle adjustment of the travel direction of the carrier vehicle 1. After the angle adjustment is completed, the control system will continue to monitor the distance between the guide plate 8 and the edge of the highway bridge using the infrared rangefinder 3. By comparing the data of the two infrared rangefinders 3, the control system can accurately control the movement of the carrier vehicle 1 so that it maintains a specified distance from the edge of the highway bridge. When the carrier vehicle 1 moves to the specified position, the control system will start the drilling assembly 2 to perform the drilling operation. During the drilling process, the control system will continue to monitor the data of the infrared rangefinder 3 and adjust the position and angle of the carrier vehicle 1 as needed to maintain the accuracy of the drilling. After completing a drilling point, the control system will automatically record the current position and angle information and plan the path to the next drilling point. The carrier vehicle 1 will automatically move to the next drilling point according to the planned path, and repeat the above steps for continuous drilling operations. In this way, construction efficiency can be greatly improved and manual intervention and errors can be reduced.
[0028] In this embodiment, the carrier vehicle 1 includes a vehicle body 101, and support frames 102 are fixedly installed on both sides of the vehicle body 101, and gears 105 are rotatably installed inside each of the two sides of each support frame 102. The support frame 102 is provided with tracks 104 through the outer sleeve of the gear 105, and the two gears 105 are meshed and connected with the tracks 104. A drive motor 103 is fixedly installed on one side of the support frame 102, and the output end of the drive motor 103 is fixedly connected to the gear 105.
[0029] When the carrier vehicle 1 needs to be moved, the control system starts the drive motor 103, and the drive motor 103 starts to rotate. Its output end drives the gear 105 fixedly connected thereto to rotate. Since the crawler 104 is meshed and connected with the two gears 105, when one gear 105 rotates driven by the drive motor 103, the other gear 105 will also rotate due to the meshing action of the crawler 104. In this way, the two gears 105 rotate at the same time, driving the crawler 104 to move forward or backward. As the crawler 104 moves, the carrier vehicle 1 also moves forward or backward accordingly, which is suitable for occasions such as highway bridge construction that require flexible movement and stable operation. By accurately controlling the rotation direction and speed of the drive motor 103, the precise movement and positioning of the carrier vehicle 1 can be achieved, providing a stable and reliable platform for operations such as drilling.
[0030] In this embodiment, the elastic telescopic rod 4 includes a fixed tube 401, which is fixed to one side of the carrier vehicle 1. A sliding rod 402 is slidably installed inside the fixed tube 401, and a slider 403 is fixedly connected to the outside of the sliding rod 402. One side of the slider 403 is fixedly connected to the inner wall of the fixed tube 401 through a spring 404.
[0031] The infrared rangefinder 3 is installed on the upper part of the carrier vehicle 1, and is coaxially arranged with the elastic telescopic rod 4 or near it to ensure that the moving trajectory of the slide bar 402 can be accurately detected. The infrared rangefinder 3 measures the distance by emitting infrared light and receiving the reflected light. The reflective surface installed on the slide bar 402 can increase the reflection area of the infrared light and improve the distance measurement accuracy. The infrared rangefinder 3 is connected to the control system, and the control system calculates the moving trajectory and telescopic distance of the slide bar 402 in real time according to the data of the rangefinder. The control system can monitor the moving trajectory and telescopic distance of the slide bar 402 in real time and adjust the driving angle of the carrier vehicle 1.
[0032] In this embodiment, the drilling assembly 2 includes a second electric push rod 201, which is fixedly mounted at the rear of the carrier 1, and a support seat 202 is fixedly mounted at the output end of the second electric push rod 201, and the support seat 202 is slidably mounted at the rear of the carrier 1. The four corners of the upper part of the support seat 202 are respectively fixedly mounted with a third electric push rod 203, and the output end of the third electric push rod 203 is fixedly connected to a lifting platform 204, and a drilling motor 205 is fixedly mounted at the lower part of the lifting platform 204 through the support seat and the carrier 1, and a drill rod 206 is fixedly connected to the output end of the drilling motor 205.
[0033] The second electric push rod 201 is fixedly mounted on the rear of the carrier 1. By controlling the extension and retraction of the second electric push rod 201, the lateral position of the entire drilling assembly 2 on the carrier 1 can be adjusted. This step allows the user to perform lateral fine adjustment of the drilling assembly 2 according to the position of the carrier 1 and the actual situation of the highway bridge to ensure that the drill rod 206 can accurately align with the drilling point;
[0034] The support seat 202 is slidably mounted at the rear of the carrier vehicle 1 and is fixedly mounted by the output end of the second electric push rod 201. When the second electric push rod 201 is extended or retracted, the support seat 202 will move accordingly, driving the entire drilling assembly 2 to move laterally. By accurately controlling the extension amount of the second electric push rod 201, the precise position adjustment of the drilling assembly 2 can be achieved; the third electric push rod 203 is mounted at the upper four corners of the support seat 202 and is used to adjust the height of the lifting platform 204. Before drilling, the user can adjust the extension amount of the third electric push rod 203 as needed to make the lifting platform 204 at a suitable height to ensure that the drill rod 206 can be smoothly aligned with the drilling point;
[0035] The lifting platform 204 is fixedly connected by the output end of the third electric push rod 203, carrying the drilling motor 205 and the drill rod 206. The design of the lifting platform 204 allows the drill rod 206 to be lifted in the vertical direction to meet the drilling requirements of different heights; the drilling motor 205 is fixedly installed at the bottom of the lifting platform 204, and its output end is fixedly connected to the drill rod 206. In the preparation stage, the drilling motor 205 is in a standby state, waiting for the instruction to start drilling; when the drilling assembly 2 is adjusted to a suitable position, the control system will issue an instruction to drive the third electric push rod 203 to shrink and make the lifting platform 204 descend. As the lifting platform 204 descends, the drilling motor 205 and the drill rod 206 will also descend until the tip of the drill rod 206 contacts the drilling point. Once the drill rod 206 contacts the drilling point, the drilling motor 205 will start working, drive the drill rod 206 to rotate and feed, and perform the drilling operation. The control system will monitor the drilling process in real time to ensure that the drill rod 206 operates according to the preset parameters.
[0036] The working principle of this utility model:
[0037] When in use, the control system of the carrier vehicle 1 controls the first electric push rod 7 to descend, so that the guide plate 8 gradually approaches the edge of the highway bridge. Through the precise control of the first electric push rod 7, the guide plate 8 finally contacts the edge of the highway bridge. After the guide plate 8 contacts the edge of the highway bridge, the fixed plate 5, the slide plate 6 and the two elastic telescopic rods 4 start to work together. The control system will calculate the bending angle of the guide plate 8 according to the telescopic distance of the elastic telescopic rod 4 measured by the two infrared rangefinders 3, so as to determine whether the carrier vehicle 1 is traveling parallel to the edge of the highway bridge, and then realize the angle adjustment of the travel direction of the carrier vehicle 1. After the angle adjustment is completed, the control system will continue to monitor the distance between the guide plate 8 and the edge of the highway bridge using the infrared rangefinder 3. By comparing the data of the two infrared rangefinders 3, the control system can accurately control the movement of the carrier vehicle 1 so that it maintains a specified distance from the edge of the highway bridge. When the carrier vehicle 1 moves to the specified position, the control system will start the drilling assembly 2 to perform the drilling operation. During the drilling process, the control system will continue to monitor the data of the infrared rangefinder 3 and adjust the position and angle of the carrier vehicle 1 as needed to maintain the accuracy of the drilling. After completing a drilling point, the control system will automatically record the current position and angle information and plan the path to the next drilling point. The carrier vehicle 1 will automatically move to the next drilling point according to the planned path and repeat the above steps for continuous drilling operations. In this way, the construction efficiency can be greatly improved and manual intervention and errors can be reduced.
[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A drilling platform for highway bridge construction, comprising a carrier vehicle (1), characterized in that: A drilling assembly (2) is fixedly installed at the rear of the carrier (1), and two elastic telescopic rods (4) are fixedly installed on both sides of the carrier (1). A fixed plate (5) is rotatably installed at the output end of one of the elastic telescopic rods (4) on one side, and a slide plate (6) is rotatably installed at the output end of the other elastic telescopic rod (4) on the other side. The outside of the slide plate (6) is slidably connected to the fixed plate (5). Two first electric push rods (7) are fixedly installed at the lower part of the fixed plate (5), and the lower parts of the two first electric push rods (7) are fixedly connected to guide plates (8). A plurality of infrared rangefinders (3) for measuring distance are also fixedly installed on the upper part of the carrier (1). The infrared rangefinders (3) are electrically connected to the carrier (1), and the infrared rangefinders (3) are coaxially arranged with the elastic telescopic rods (4).
2. A drilling platform for highway bridge construction as claimed in claim 1, characterized in that: The carrier vehicle (1) comprises a vehicle body (101), support frames (102) are respectively fixedly mounted on both sides of the vehicle body (101), and gears (105) are rotatably mounted inside each of the two sides of the support frames (102).
3. A drilling platform for highway bridge construction as claimed in claim 2, characterized in that: The support frame (102) is provided with a crawler belt (104) through the outer sleeve of the gear (105), and the two gears (105) are meshingly connected with the crawler belt (104). A driving motor (103) is fixedly installed on one side of the support frame (102), and the output end of the driving motor (103) is fixedly connected to the gear (105).
4. A drilling platform for highway bridge construction as claimed in claim 1, characterized in that: The elastic telescopic rod (4) comprises a fixed tube (401), the fixed tube (401) is fixed to one side of the carrier vehicle (1), a sliding rod (402) is slidably mounted inside the fixed tube (401), a sliding block (403) is fixedly connected to the outside of the sliding block (402), and one side of the sliding block (403) is fixedly connected to the inner wall of the fixed tube (401) via a spring (404).
5. The drilling platform for highway bridge construction as claimed in claim 1, characterized in that: The drilling assembly (2) comprises a second electric push rod (201), the second electric push rod (201) is fixedly mounted on the rear of the carrier vehicle (1), a support seat (202) is fixedly mounted on the output end of the second electric push rod (201), and the support seat (202) is slidably mounted on the rear of the carrier vehicle (1).
6. A drilling platform for highway bridge construction as claimed in claim 5, characterized in that: A third electric push rod (203) is fixedly installed at the four corners of the upper part of the support seat (202), and the output end of the third electric push rod (203) is fixedly connected to a lifting platform (204). A drilling motor (205) is fixedly installed at the lower part of the lifting platform (204) through the support seat (202) and the carrier vehicle (1), and the output end of the drilling motor (205) is fixedly connected to a drilling rod (206).