Prompting device for procurement plan completion degree

By designing a procurement plan completion prompt device including walking tracks, walking racks, servo motors and worms, the problem of inconvenient movement and adjustment of existing devices is solved, and convenient prompts and flexible use are achieved.

CN222480117UActive Publication Date: 2025-02-14INNER MONGOLIA YUANXI PROJECT MANAGEMENT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421213644.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-02-14
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

The existing procurement plan completion prompt device is not convenient for convenient mobile sequential prompts and circular rotation adjustments, which affects the convenience of prompts and the flexibility of use.

Method used

A procurement plan completion reminder device including walking tracks and walking racks was designed. The walking motor drives the walking wheel to slide on the walking track, and the circumferential rotation adjustment is achieved by combining the servo motor and the worm. The electric push rod and push arm are used for movement and Adjust the placing rack and placing box.

Benefits of technology

It realizes convenient mobile and sequential prompts for procurement plan completion and convenient circular rotation adjustment and use, improving targeted prompts for different procurement plans and the convenience and flexibility of use from different locations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222480117U_ABST
    Figure CN222480117U_ABST
Patent Text Reader

Abstract

The utility model discloses a procurement plan completion degree prompting device which comprises a walking track and a walking frame, the walking frame is arranged below the walking track, a walking motor is installed on the outer wall of the walking frame, the walking motor is fixedly connected with the walking frame, two sets of walking wheels are symmetrically installed on the inner wall of the walking frame, and the walking wheels are fixedly connected with the walking frame. The walking wheels are movably connected with the walking frame, the output end of the walking motor is connected with one set of walking wheels, the walking wheels are slidably connected with the walking track, a rotating box is installed at the bottom end of the walking frame and fixedly connected with the walking frame, and a servo motor is installed on the inner wall of the rotating box. According to the utility model, not only are convenient, mobile and sequential prompting of the completion degree of the purchase plan and convenient and rapid circumferential rotation adjustment and use realized, but also targeted prompting of different purchase plans and use from different positions are facilitated, and the prompting convenience and the use flexibility are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prompting devices, in particular to a procurement plan completion prompting device. Background Art

[0002] Procurement plan refers to the predictive arrangement and deployment of material procurement management activities during the planning period made by enterprise managers based on their understanding of market supply and demand, the process of enterprise production and operation activities, and the law of material consumption. Procurement plan is a plan form including purchased materials, purchase quantity, demand date, etc. formulated according to the plan of production department or other user departments. When people need to purchase, they generally plan the purchased products in sequence, and proceed to the next one after the previous plan is completed. In order to avoid forgetting the progress of the procurement plan, a procurement plan completion prompt device is proposed.

[0003] For example, a petroleum engineering procurement plan completion prompt device disclosed in the authorization announcement number CN210276421U includes a data storage box, a plan name writing board is fixedly installed on the right side of the top of the data storage box, and seven evenly arranged storage drawers are arranged on the right side of the data storage box;

[0004] Although it realizes the completion prompt device of the petroleum engineering procurement plan, the seven processes are recorded on the process identification board and the progress prompt area respectively according to the order of the planned process, and the corresponding cavity of the prompt board is inserted in the order from top to bottom, and then the process specification, work summary, person in charge and other information are written and marked in detail on the process identification board, and the specific work arrangement is written and recorded in the progress prompt area, and the files corresponding to each process are placed in the storage drawer in turn, so that the required materials can be easily taken when needed, thereby achieving the purpose of recording the procurement plan and checking the completion;

[0005] However, the problem that the existing prompting device is not conducive to convenient mobile prompting of procurement plan completion and convenient circular rotation adjustment during use, is not conducive to targeted prompting of different procurement plans and use from different positions, affects the convenience of prompting and flexibility of use. Utility Model Content

[0006] The purpose of the utility model is to provide a procurement plan completion prompt device to solve the problem that the prompt device proposed in the above background technology is not convenient to move in a convenient way to prompt the procurement plan completion in turn and to adjust the use in a circular rotation, which is not conducive to targeted prompts for different procurement plans and use from different positions, affecting the convenience of prompts and flexibility of use.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a procurement plan completion prompt device, comprising a walking track and a walking frame, a walking frame is arranged below the walking track, a walking motor is installed on the outer wall of the walking frame, and the walking motor is fixedly connected to the walking frame, two groups of walking wheels are symmetrically installed on the inner wall of the walking frame, and the walking wheels are movably connected to the walking frame, and the output end of the walking motor is connected to a group of walking wheels, the walking wheels are slidably connected to the walking track, a rotating box is installed at the bottom end of the walking frame, and the rotating box is fixedly connected to the walking frame, a servo motor is installed on the inner wall of the rotating box, and the servo motor is fixedly connected to the rotating box, a worm is installed at the output end of the servo motor, and the worm is movably connected to the rotating box, a movable shaft is installed inside the rotating box on one side of the worm, and the movable shaft is movably connected to the rotating box, a worm gear is set on the surface of the rotating box, and the worm gear and the worm gear are meshed with each other, and the movable shaft extends to the outside of the rotating box, an electric push rod is installed at the bottom end of the movable shaft, and the electric push rod is fixedly connected to the movable shaft.

[0008] Preferably, a push arm is installed at the output end of the electric push rod, and the push arm is slidably connected to the electric push rod.

[0009] Preferably, a placement rack is installed at the bottom end of the push arm, and the placement rack is fixedly connected to the push arm.

[0010] Preferably, two groups of placement boxes are arranged inside the placement rack, and connecting shafts are installed at both upper and lower ends of the placement boxes, and the connecting shafts are fixedly connected to the placement boxes.

[0011] Preferably, the placement box is movably connected to the placement rack via a connecting shaft, and a plurality of groups of placement grooves with equal spacing are installed on the side walls of the placement box, and the placement grooves extend to the interior of the placement box.

[0012] Preferably, a completion card is provided inside each of the placement slots, and the completion card is slidably connected to the placement slot.

[0013] Preferably, a completion green light is installed on the side wall of the placement box below the placement groove, and the completion green light is fixedly connected to the placement box.

[0014] Preferably, a red light in progress is installed on the side wall of the placement box on the side of the completion green light, and the red light in progress is fixedly connected to the placement box.

[0015] Compared with the prior art, the beneficial effects of the utility model are: the prompting device not only realizes convenient mobile prompting of procurement plan completion in sequence and convenient circular rotation adjustment, which facilitates targeted prompting of different procurement plans and use from different positions, but also improves the convenience of prompting and flexibility of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0017] Figure 2 It is a three-dimensional structural schematic diagram of the placement rack of the utility model;

[0018] Figure 3 It is a front cross-sectional structural schematic diagram of the rotary box of the utility model;

[0019] Figure 4 It is a three-dimensional structural schematic diagram of the placement box of the utility model;

[0020] Figure 5 It is a three-dimensional structural schematic diagram of the walking frame of the utility model.

[0021] In the figure: 1. Travel track; 2. Travel frame; 3. Rotating box; 4. Placement frame; 5. Electric push rod; 6. Servo motor; 7. Worm; 8. Movable shaft; 9. Worm gear; 10. Push arm; 11. Connecting shaft; 12. Placement box; 13. Placement slot; 14. Completion card; 15. Completion green light; 16. In progress red light; 17. Travel motor; 18. Travel wheel. DETAILED DESCRIPTION

[0022] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose of the utility model, the specific implementation method, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.

[0023] See also Figure 1-5The utility model provides an embodiment: a procurement plan completion prompt device, including a walking track 1 and a walking frame 2, a walking frame 2 is arranged below the walking track 1, a walking motor 17 is installed on the outer wall of the walking frame 2, the walking motor 17 plays a role of power drive, and the walking motor 17 is fixedly connected to the walking frame 2, two groups of walking wheels 18 are symmetrically installed on the inner wall of the walking frame 2, and the walking wheels 18 are movably connected to the walking frame 2, and the output end of the walking motor 17 is connected to a group of walking wheels 18, and the walking wheels 18 are slidably connected to the walking track 1, and a rotating box 3 is installed at the bottom end of the walking frame 2, and the rotating box 3 is connected to the walking frame 2 is fixedly connected, a servo motor 6 is installed on the inner wall of the rotating box 3, the servo motor 6 plays a role of power drive, and the servo motor 6 is fixedly connected to the rotating box 3, a worm 7 is installed at the output end of the servo motor 6, and the worm 7 is movably connected to the rotating box 3, a movable shaft 8 is installed inside the rotating box 3 on one side of the worm 7, and the movable shaft 8 is movably connected to the rotating box 3, a worm gear 9 is set on the surface of the rotating box 3, and the worm 7 and the worm gear 9 are meshed with each other, and the movable shaft 8 extends to the outside of the rotating box 3, and an electric push rod 5 is installed at the bottom end of the movable shaft 8, the electric push rod 5 plays a role of power drive, and the electric push rod 5 is fixedly connected to the movable shaft 8;

[0024] First, install the walking track 1 on the ceiling of the purchasing planner's room, and then connect the device to the external controller and the external circuit. Before the completion card 14 is inserted into the placement slot 13, the red light 16 in progress is always on. When the completion card 14 is inserted into the placement slot 13, the red light 16 in progress goes out and the green light 15 is on, indicating that the current procurement plan has been completed. The green light 15 and the red light 16 in progress are turned on and off by the built-in circuit inside the placement box 12. This circuit is a basic circuit and will not be described in detail here. After the procurement plan for the first workstation is completed, the walking motor 17 is turned on by external control, and the walking motor 17 drives the walking wheel 18 to rotate. Under the cooperation of the activities of other multiple groups of walking wheels 18, the walking wheel 18 drives the walking frame 2 to slide on the surface of the walking track 1, and the walking frame 2 drives the rotating box 3 to move The rotary box 3 drives the electric push rod 5, the push arm 10, the placement rack 4 and the placement box 12 to move to the next station, and the electric push rod 5 is opened by external control, and the push arm 10 is driven by the electric push rod 5 to move, and the placement rack 4 is driven by the push arm 10 to move downward, so that the placement rack 4 moves to a touchable position. When the procurement plan of the station is completed, the placement box 12 is rotated, and the placement box 12 rotates inside the placement rack 4 with the connecting shaft 11 as the axis to rotate to the next placement slot 13. The personnel of the station insert the corresponding completion card 14, and the corresponding completion green light 15 lights up, which means that the procurement plan of the station has been completed. After that, the above operation is repeated to move to the corresponding station in turn, which realizes a convenient mobile prompt of the completion degree of the procurement plan in turn, facilitates targeted prompts for different procurement plans, and improves the convenience of prompts;

[0025] A push arm 10 is installed at the output end of the electric push rod 5, and the push arm 10 is slidably connected to the electric push rod 5;

[0026] A placement rack 4 is installed at the bottom end of the push arm 10, and the placement rack 4 is fixedly connected to the push arm 10;

[0027] Two groups of placement boxes 12 are arranged inside the placement rack 4, and connecting shafts 11 are installed at the upper and lower ends of the placement boxes 12, and the connecting shafts 11 are fixedly connected to the placement boxes 12, and the placement boxes 12 are movably connected to the placement rack 4 through the connecting shafts 11, and multiple groups of placement grooves 13 with equal intervals are installed on the side walls of the placement boxes 12, and the placement grooves 13 extend to the inside of the placement boxes 12;

[0028] A completion card 14 is provided inside the placement slot 13, and the completion card 14 is slidably connected to the placement slot 13. A completion green light 15 is installed on the side wall of the placement box 12 below the placement slot 13, and the completion green light 15 is fixedly connected to the placement box 12;

[0029] A red light 16 is installed on the side wall of the placement box 12 on the side of the completion green light 15, and the red light 16 is fixedly connected to the placement box 12;

[0030] When the angle needs to be adjusted, the servo motor 6 is turned on through external control, and the servo motor 6 drives the worm 7 to rotate. Under the mutual engagement of the worm 7 and the worm wheel 9, the worm 7 drives the worm wheel 9 to rotate, and the worm wheel 9 drives the movable shaft 8 to rotate, and the movable shaft 8 drives the electric push rod 5, the push arm 10, the placement rack 4 and the placement box 12 to rotate, so as to adjust the use in a circular rotation, which is convenient for use from different positions, realizes convenient circular rotation adjustment, facilitates use from different positions, and improves the flexibility of use.

[0031] Working principle: First, install the walking track 1 on the ceiling of the purchasing planner's room, and then connect the device to the external controller and the external circuit. Before the completion card 14 is inserted into the placement slot 13, the red light 16 in progress is always on. When the completion card 14 is inserted into the placement slot 13, the red light 16 in progress goes out and the green light 15 is on, indicating that the current procurement plan has been completed. The green light 15 and the red light 16 in progress are turned on and off by the built-in circuit inside the placement box 12. This circuit is a basic circuit and will not be described in detail here. After the procurement plan for the first workstation is completed, the walking motor 17 is turned on by external control, and the walking motor 17 drives the walking wheel 18 to rotate. Under the cooperation of the activities of other multiple sets of walking wheels 18, the walking wheel 18 drives the walking frame 2 to slide on the surface of the walking track 1, and the walking frame 2 drives the rotating box 3 to move, and the rotating box 3 drives the electric push rod 5, the push arm 10, the placement frame 4 and the placement box 12 to move to the next workstation. Through external control The electric push rod 5 is turned on, and the push arm 10 is driven by the electric push rod 5 to move, and the push arm 10 drives the placement rack 4 to move downward, so that the placement rack 4 moves to a touchable position. When the procurement plan of the workstation is completed, the placement box 12 is rotated, and the placement box 12 rotates inside the placement rack 4 with the connecting shaft 11 as the axis to rotate to the next placement slot 13. The personnel of the workstation insert the corresponding completion card 14, and the corresponding completion green light 15 is on, which means that the procurement plan of the workstation has been completed. Then repeat the above operation to move to the corresponding workstation in sequence. When the angle needs to be adjusted for use, the servo motor 6 is turned on by external control, and the servo motor 6 drives the worm 7 to rotate. Under the mutual engagement of the worm 7 and the worm wheel 9, the worm 7 drives the worm wheel 9 to rotate, and the worm wheel 9 drives the movable shaft 8 to rotate, and the movable shaft 8 drives the electric push rod 5, the push arm 10, the placement rack 4 and the placement box 12 to rotate in a circular rotation for adjustment, to facilitate use from different positions, and to complete the use of the procurement plan completion prompt device.

[0032] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A procurement plan completion prompting device, comprising a walking track (1) and a walking frame (2), characterized in that: A walking frame (2) is arranged below the walking track (1), a walking motor (17) is installed on the outer wall of the walking frame (2), and the walking motor (17) is fixedly connected to the walking frame (2), two groups of walking wheels (18) are symmetrically installed on the inner wall of the walking frame (2), and the walking wheels (18) are movably connected to the walking frame (2), and the output end of the walking motor (17) is connected to a group of walking wheels (18), and the walking wheels (18) are slidably connected to the walking track (1), a rotating box (3) is installed at the bottom end of the walking frame (2), and the rotating box (3) is fixedly connected to the walking frame (2), and a rotating box (3) is installed on the inner wall of the rotating box (3). A servo motor (6) is installed, and the servo motor (6) is fixedly connected to a rotating box (3); a worm (7) is installed at the output end of the servo motor (6), and the worm (7) is movably connected to the rotating box (3); a movable shaft (8) is installed inside the rotating box (3) on one side of the worm (7), and the movable shaft (8) is movably connected to the rotating box (3); a worm wheel (9) is mounted on the surface of the rotating box (3), and the worm (7) and the worm wheel (9) are meshed with each other, and the movable shaft (8) extends to the outside of the rotating box (3); an electric push rod (5) is installed at the bottom end of the movable shaft (8), and the electric push rod (5) is fixedly connected to the movable shaft (8).

2. A procurement plan completion prompting device according to claim 1, characterized in that: A push arm (10) is installed at the output end of the electric push rod (5), and the push arm (10) is slidably connected to the electric push rod (5).

3. A procurement plan completion prompting device according to claim 2, characterized in that: A placement rack (4) is installed at the bottom end of the push arm (10), and the placement rack (4) is fixedly connected to the push arm (10).

4. A procurement plan completion prompting device according to claim 3, characterized in that: Two groups of placement boxes (12) are arranged inside the placement rack (4), and connecting shafts (11) are installed at the upper and lower ends of the placement boxes (12), and the connecting shafts (11) are fixedly connected to the placement boxes (12).

5. A procurement plan completion prompting device according to claim 4, characterized in that: The placement box (12) is movably connected to the placement frame (4) via a connecting shaft (11); a plurality of groups of placement grooves (13) with equal spacing are installed on the side walls of the placement box (12), and the placement grooves (13) extend into the interior of the placement box (12).

6. A procurement plan completion prompting device according to claim 5, characterized in that: The placement slots (13) are each provided with a completion card (14) inside, and the completion card (14) is slidably connected to the placement slots (13).

7. A procurement plan completion prompting device according to claim 5, characterized in that: A completion green light (15) is installed on the side wall of the placement box (12) below the placement groove (13), and the completion green light (15) is fixedly connected to the placement box (12).

8. A procurement plan completion prompting device according to claim 7, characterized in that: A red light (16) is installed on the side wall of the placement box (12) on the side of the completion green light (15), and the red light (16) is fixedly connected to the placement box (12).

Citation Information

Patent Citations

  • Petroleum engineering purchasing plan completion degree prompting device

    CN210276421U