Air conditioner evaporator cleaning structure

By designing the cleaning structure of the air-conditioning evaporator, including the installation frame and guard panel set, the problem of the evaporator being difficult to clean is solved, simplifies the cleaning process, and reduces the operating time and failure risk.

CN222480825UActive Publication Date: 2025-02-14BOMBARDIER SIFANG QINGDAO TRANSPORTATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420227946.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2025-02-14
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

In the EMU air conditioning system, the evaporator is not easy to clean, the cleaning process is cumbersome, and manpower and material resources are wasted.

Method used

A cleaning structure of air conditioning evaporator is designed, including an installation frame and a guard panel group. A filter positioning structure is set in the installation frame, and a disassembly port is reserved on the top. The guard panel group can be detached and connected to the installation frame to block the inverter side and simplify cleaning. process.

Benefits of technology

Through this structure, there is no need to disassemble other components when cleaning the evaporator, which reduces working time and avoids secondary failures. The cleaning process is simple and does not affect other components basically.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222480825U_ABST
    Figure CN222480825U_ABST
Patent Text Reader

Abstract

The utility model discloses an air conditioner evaporator cleaning structure, relates to the technical field of motor train unit air conditioners, and adopts the technical scheme that the air conditioner evaporator cleaning structure comprises a mounting frame which is of a frame structure, a filter screen positioning structure is arranged in the mounting frame, a filter screen dismounting opening capable of removing a filter screen is reserved in the top of the mounting frame by taking the use state of the mounting frame as reference, and the horizontal side is an evaporator side; the other side is a frequency conversion box side; and the protective plate group comprises at least one protective plate which is detachably connected with the mounting frame. The evaporator cleaning structure has the advantages that the evaporator cleaning structure can be combined with an existing evaporator mounting position for use, the mounting frame is arranged to serve as a mounting carrier of the evaporator filter screen, other parts do not need to be detached when the evaporator filter screen is cleaned, only the upper cover of the mounting frame needs to be detached, and the mounting structure is convenient to use. The whole operation time for cleaning the evaporator is shortened; through the arrangement of the cleaning structure in the scheme, other parts do not need to be disassembled during cleaning operation, and the possibility of secondary faults is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of motor vehicle air conditioning, in particular to an air conditioning evaporator cleaning structure. Background Art

[0002] The air conditioning system is one of the important components of the EMU, and the working status of the air conditioning system directly affects the passengers' riding experience. In order to ensure the normal operation of the EMU air conditioning system, the air conditioning components need to be cleaned regularly. When cleaning the air conditioning components, two parts need to be processed, one is the evaporator, and the other is the filter on one side of the evaporator. However, this part is currently difficult to clean. The main reason is that there is a frequency converter on the side of the filter away from the evaporator. When cleaning the evaporator, the frequency converter must be removed before operation. The operation steps are cumbersome, and the evaporator needs to be cleaned 2-3 times a year, which wastes a lot of manpower and material resources. Therefore, it is necessary to improve the cleaning problem of the EMU air conditioning evaporator. Summary of the invention

[0003] In view of one of the deficiencies of the prior art, the utility model provides an air-conditioning evaporator cleaning structure to solve the problem that the air-conditioning evaporator is difficult to clean.

[0004] To achieve the above purpose, the utility model provides the following technical solution: an air conditioner evaporator cleaning structure, comprising:

[0005] The installation frame is a frame structure, and a filter positioning structure is arranged in the installation frame. With reference to the use state of the installation frame, a filter disassembly opening for removing the filter is reserved at the top of the installation frame, with one horizontal side being the evaporator side and the other side being the inverter box side;

[0006] A guard plate group, comprising at least one guard plate, wherein the guard plate is detachably connected to the mounting frame, and the guard plate comprises:

[0007] The shielding structure can shield the inverter box side of the installation frame.

[0008] Preferably, the installation frame comprises:

[0009] The main frame is a rectangular frame structure, including:

[0010] Side panels, two of which are arranged in parallel;

[0011] A top plate, located between the top ends of the side plates, with the disassembly opening reserved on the top plate;

[0012] The bottom plate is located between the bottom ends of the side plates.

[0013] Preferably, the side plates are respectively provided with connecting rings, which are arranged on the sides of the two side plates that are away from each other. The connecting rings are semi-annular structures, and connecting holes are opened on the annular bodies of the connecting rings.

[0014] Preferably, it also includes:

[0015] The upper cover is detachably connected to the top plate and can close the disassembly opening; a downwardly protruding boss is arranged on the upper cover corresponding to the disassembly opening.

[0016] Preferably, the filter positioning structure comprises:

[0017] A lower positioning structure is arranged on the bottom plate and is a slot structure corresponding to the filter screen;

[0018] The upper positioning structure is arranged at the lower side of the boss of the upper cover and is a positioning plate corresponding to the slot structure.

[0019] Preferably, the installation frame further includes:

[0020] The reinforcement frame is arranged on one side of the main frame body located at the evaporator side; the reinforcement frame comprises a plurality of reinforcement rods arranged in a crisscross pattern, and through holes are distributed on the rod bodies of the reinforcement rods.

[0021] Preferably, the reinforcement frame further includes:

[0022] The reinforcing plate is a strip-shaped plate body, which is arranged at the bottom of the reinforcing frame, and the reinforcing plate is fixedly connected to the bottom plate.

[0023] Preferably, a clamping plate is extended from the edge of the side plate toward the evaporator side; the clamping plate is covered on the outside of both sides of the reinforcement frame, and a clamping interface is provided at the lower part of the clamping plate.

[0024] Preferably, the shielding structure of the guard plate includes a main shielding plate and a side shielding plate, the main shielding plate is extended in the vertical direction, and the side shielding plate is at least arranged on one side of the main shielding plate.

[0025] Preferably, the guard plate further comprises:

[0026] The hanging structure can be hung with the installation frame, and the hanging structure includes:

[0027] An upper hanging member is arranged on the upper side of the main shielding plate and can be hung with a disassembly opening on the main frame;

[0028] A lower hanging piece, arranged corresponding to the reinforcing plate, and can be hung on the reinforcing plate;

[0029] The drainage structure is located between the main shielding plate and the lower hanging member, and can drain toward the outside of the installation frame.

[0030] Compared with the prior art, the present invention has the following beneficial effects: the evaporator cleaning structure of the present invention can be used in combination with the existing evaporator installation position. By setting the installation frame as the installation carrier of the evaporator filter, it is not necessary to disassemble other parts when cleaning the evaporator filter. It is only necessary to remove the upper cover of the installation frame, thereby reducing the entire operation time of the evaporator cleaning. By setting the cleaning structure of the present invention, it is not necessary to disassemble other parts when performing the cleaning operation, thereby avoiding the possibility of secondary failure. In addition, by adding a protective plate structure, the present invention can directly rinse the evaporator with water. The cleaning process is very simple and basically does not affect other parts. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 The installation frame structure of the embodiment of the present application is shown in FIG. Figure 1 ;

[0032] Figure 2 The installation frame structure of the embodiment of the present application is shown in FIG. Figure 2 ;

[0033] Figure 3 This is a schematic diagram of the upper cover structure of an embodiment of the present application;

[0034] Figure 4 It is a schematic diagram of the local structure of this application;

[0035] Figure 5 The installation frame structure of the embodiment of the present application is shown in FIG. Figure 3 ;

[0036] Figure 6 This is a schematic diagram of the guard plate structure of an embodiment of the present application;

[0037] In the figure:

[0038] 1. Installation frame; 101. Evaporator side; 102. Inverter side; 11. Main frame; 111. Side plate; 112. Top plate; 113. Bottom plate; 12. Upper cover; 121. Boss; 13. Reinforcement frame; 131. Reinforcement rod; 132. Reinforcement plate; 14. Snap-on plate;

[0039] 2. Guard plate; 21. Shielding structure; 211. Main shielding plate; 212. Side shielding plate; 22. Hanging structure; 221. Upper hanging piece; 222. Lower hanging piece; 23. Drainage structure. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0041] This application provides the following technical solutions:

[0042] An air conditioner evaporator cleaning structure includes an installation frame 1 and a guard plate group. The installation frame 1 is a frame structure. A filter positioning structure is arranged inside the installation frame 1. With reference to the use state of the installation frame 1, a filter disassembly opening for removing the filter is reserved at the top of the installation frame 1. The horizontal side is the evaporator side 101, and the other side is the frequency converter side 102. The guard plate group includes two guard plates 2, which are detachably connected to the installation frame 1. Each guard plate 2 is provided with a shielding structure 21, which can shield the frequency converter side 102 of the installation frame 1.

[0043] The cleaning structure has two states, one of which is the daily use state. Figure 1 and Figure 2 The following is the daily state. The other state is the cleaning state when used in conjunction with the guard plate assembly, that is, the state when the evaporator is cleaned, such as Figure 4 and Figure 5 As shown, in this state, the guard plate 2 is used in combination with the mounting frame 1, and the evaporator can be flushed with a water gun.

[0044] On the basis of the above implementation scheme, the installation frame 1 includes a main frame 11 of a rectangular frame structure. The main frame 11 forms a rectangular frame structure, which includes two parallel side panels 111, a top panel 112 and a bottom panel 113. The top panel 112 is located between the top ends of the side panels 111, and a disassembly opening is reserved thereon; the bottom panel 113 is located between the bottom ends of the side panels 111. Connecting rings are respectively provided on the side panels 111, and the connecting rings are arranged on the opposite sides of the two side panels 111. The connecting rings are semi-annular structures, and connecting holes are provided on the annular bodies. The top panel 112 is connected to the upper cover 12 by threads, and the upper cover 12 can close the disassembly opening; a downwardly protruding boss 121 is provided on the upper cover 12 corresponding to the disassembly opening.

[0045] The area surrounded by the main frame 11 is the space for placing the filter in daily use. When cleaning is required, the screws on the upper cover 12 are removed to expose the disassembly opening on the top plate 112. Figure 4 As shown, the filter is then pulled out from the disassembly port, and the filter is cleaned or replaced. At the same time, the position of the disassembly port can be used as a water gun nozzle to spray water to clean the evaporator. When the cleaning is completed, the filter and the upper cover 12 can be reinstalled.

[0046] Based on the above implementation, the filter screen positioning structure includes a lower positioning structure and an upper positioning structure. The lower positioning structure is arranged on the bottom plate 113 and is a slot structure corresponding to the filter screen; the upper positioning structure is arranged on the lower side of the boss 121 of the upper cover 12 and is a positioning plate corresponding to the slot structure. Figure 1 As shown, a vertical flange is provided on the edge of the bottom plate 113 to form a lower positioning structure. Figure 3 It is a schematic diagram of the bottom angle of the upper cover 12, and two long strip-shaped plates are arranged on the cover to form an upper positioning structure corresponding to the evaporator clamping.

[0047] On the basis of the above embodiment, a reinforcement frame 13 is further provided on one side of the main frame 11 located on the evaporator side 101. The reinforcement frame 13 includes a plurality of reinforcement rods 131 arranged in a crisscross pattern. Through holes are distributed on the rod bodies of the reinforcement rods 131. A reinforcement plate 132 is provided at the bottom of the reinforcement frame 131. The reinforcement plate 132 is a strip-shaped plate body and is fixedly connected to the bottom plate 113.

[0048] The side plate 111 is provided with a clamping plate 14 extending toward the edge of the evaporator side 101. Figure 2 As shown, the clamping plate 14 is covered on both sides of the reinforcement frame 13, and a clamping interface is provided at the lower part of the clamping plate 14. The clamping plate 14 can further fix the reinforcement frame 13, and can also be clamped with the structural frame at the evaporator position by means of the clamping interface at the lower part of the clamping plate 14, so as to facilitate the positioning of the installation frame.

[0049] On the basis of the above implementation scheme, after the filter is removed and before the evaporator is flushed, the guard plate group can be placed on the installation frame 1 to protect the frequency converter box on the other side and prevent the frequency converter from being splashed by water. Figure 6 The shielding structure 21 of the guard plate 2 includes a main shield plate 211 and a side shield plate 212. The main shield plate 211 is vertically extended, and the side shield plate 212 is at least arranged on one side of the main shield plate 211. This solution adopts a structural form of setting two guard plates 2, and the two guard plates 2 are mirror-symmetrical structures.

[0050] The guard plate 2 is provided with a hanging structure 22, through which the mounting frame 1 can be hung. The hanging structure 22 includes an upper hanging member 221 and a lower hanging member 222. The upper hanging member 221 is provided on the upper side of the main shielding plate 211 and can be hung with the disassembly opening on the main frame 1; the lower hanging member 222 is provided corresponding to the reinforcing plate 132 and can be hung on the reinforcing plate 132. In addition, a drainage structure 23 is provided between the main shielding plate 211 and the lower hanging member 222, and the drainage structure 23 can drain toward the outside of the mounting frame 1.

[0051] See also Figure 5 and Figure 6 The main baffle plate 211 is a vertical plate body, and the side baffle plates 212 are respectively arranged on both sides of the main baffle plate 211. The side baffle plate 212 facing the outer end of one lateral side of the main frame 11 is wider, and the other side can be relatively narrower. An upper hanging member 221 is arranged on one side of the upper end of the main baffle plate 211, which is a horizontal plate structure and can be placed on the disassembly port. At the same time, a horizontal flange is arranged on the other side of the upper edge of the main baffle plate 211, which has a certain degree of shielding effect on water splashing. The lower hanging member 222 is arranged corresponding to the reinforcing plate 132 and can be placed on the upper edge of the reinforcing plate 132. The drainage structure 23 is an inclined plate structure, the lower horizontal end of which is arranged toward the evaporator side 101, and the high horizontal end is connected to the lower edge of the main baffle plate 211, and the drainage structure 23 is provided with a bayonet corresponding to the reinforcing rod 131.

[0052] When flushing the evaporator, the guard plate 2 can effectively prevent the inverter from being affected, because the water flow is sprayed toward the evaporator, and some water droplets will splash toward the inverter. The guard plate 2 can block this part of the splashing water, and at the same time, the water is guided into the water pan or drain groove under the evaporator through the drainage structure 23.

[0053] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. An air conditioner evaporator cleaning structure, characterized in that: include: The installation frame (1) is a frame structure, a filter positioning structure is arranged in the installation frame (1), and a filter disassembly opening for removing the filter is reserved at the top of the installation frame (1) with reference to the use state of the installation frame (1), one horizontal side is the evaporator side (101), and the other side is the frequency converter box side (102); A guard plate set, comprising at least one guard plate (2), wherein the guard plate (2) is detachably connected to the mounting frame (1), and the guard plate (2) comprises: The shielding structure (21) can shield the frequency converter box side (102) of the installation frame (1).

2. The air conditioner evaporator cleaning structure according to claim 1, characterized in that: The installation frame (1) comprises: The main frame (11) is a rectangular frame structure, comprising: Two side plates (111) are arranged in parallel; A top plate (112) is located between the top ends of the side plates (111), and the top plate (112) is provided with the disassembly opening; The bottom plate (113) is located between the bottom ends of the side plates (111).

3. The air conditioner evaporator cleaning structure according to claim 2, characterized in that: The side plates (111) are respectively provided with connecting rings, which are arranged on the opposite sides of the two side plates (111). The connecting rings are semi-annular structures, and connecting holes are provided on the annular bodies of the connecting rings.

4. The air conditioner evaporator cleaning structure according to claim 2, characterized in that: Also includes: An upper cover (12) is detachably connected to the top plate (112), and the upper cover (12) can close the disassembly opening; A downwardly protruding boss (121) is provided on the upper cover (12) corresponding to the disassembly opening.

5. The air conditioner evaporator cleaning structure according to claim 4, characterized in that: The filter positioning structure comprises: A lower positioning structure, arranged on the bottom plate (113), which is a slot structure corresponding to the filter screen; The upper positioning structure is arranged on the lower side of the boss (121) of the upper cover (12) and is a positioning plate corresponding to the slot structure.

6. The air conditioner evaporator cleaning structure according to claim 2, characterized in that: The installation frame (1) further comprises: The reinforcement frame (13) is arranged on a side of the main frame (11) located on the evaporator side (101); the reinforcement frame (13) comprises a plurality of reinforcement rods (131) arranged in a crisscross pattern, and through holes are distributed on the rod bodies of the reinforcement rods (131).

7. The air conditioner evaporator cleaning structure according to claim 6, characterized in that: The reinforcement frame (13) further comprises: The reinforcing plate (132) is a strip-shaped plate body, and is arranged at the bottom of the reinforcing rod (131). The reinforcing plate (132) is fixedly connected to the bottom plate (113).

8. The air conditioner evaporator cleaning structure according to claim 6, characterized in that: A clamping plate (14) is provided on the edge of the side plate (111) extending towards the evaporator side (101); the clamping plate (14) is wrapped around the outside of two sides of the reinforcement frame (13), and a clamping interface is provided at the bottom of the clamping plate (14).

9. The air conditioner evaporator cleaning structure according to claim 7, characterized in that: The shielding structure (21) of the guard plate (2) comprises a main shielding plate (211) and a side shielding plate (212); the main shielding plate (211) is arranged to extend in the vertical direction, and the side shielding plate (212) is arranged at least on one side of the main shielding plate (211).

10. The air conditioner evaporator cleaning structure according to claim 9, characterized in that: The guard plate (2) further comprises: The hanging structure (22) can be hung on the installation frame (1), and the hanging structure (22) comprises: An upper hanging member (221) is arranged on the upper side of the main shielding plate (211) and can be hung with a disassembly opening on the main frame (11); A lower hanging member (222) is provided corresponding to the reinforcing plate (132) and can be hung on the reinforcing plate (132); The drainage structure (23) is located between the main shielding plate (211) and the lower hanging member (222), and can drain toward the outside of the installation frame (1).