Building engineering construction pipeline
By introducing filter grids, impurity collection boxes, speed regulation components and fixing components into construction pipelines, the problems of traditional pipeline blockage, flow rate regulation and connection are solved, and efficient impurity filtration, automatic cleaning and flexible flow rate are achieved. Adjusted and stable pipeline connections improve the efficiency and safety of the construction site.
Patent Information
- Application Number
- CN202421202078.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2034-05-29
AI Technical Summary
The lack of filter structure of traditional construction pipelines leads to clogging problems, and the lack of flow rate adjustment mechanism cannot adapt to the dynamic needs of the construction site. The connection process is complicated and laborious, and there are safety hazards.
A construction pipeline including a filter grid, impurity collection box, speed regulation component and fixed component was designed. Impurity filtration and automatic collection through flow components, speed regulation component achieves flow rate regulation, and fixed component improves the stability and automation of pipeline connections. .
It effectively reduces the risk of pipeline blockage, improves the smoothness and service life of pipelines, reduces maintenance costs and manpower investment, improves the reliability and adaptability of drainage systems at the construction site, and reduces the labor intensity and safety risks of construction workers.
Smart Images

Figure CN222513819U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction pipelines, and more specifically, to a construction pipeline for a building project. Background Art
[0002] In the existing technology, traditional construction pipes lack the necessary filtering structure and are unable to effectively filter and clean the waste impurities inside the sewage. During the construction process, a large amount of impurities such as mud, sand, gravel, concrete residues, etc. will enter the pipes with the sewage. As time goes by, these impurities will accumulate inside the pipes, causing the pipes to gradually become clogged. Once the pipes are clogged, the drainage system at the construction site will be seriously affected, and sewage cannot be discharged in time, which not only affects the construction progress, but may also cause environmental pollution. In order to solve the problem of pipe blockage, construction units often need to invest a lot of manpower and material resources for cleaning, which is not only time-consuming and labor-intensive, but also interrupts construction operations and affects the progress of the project.
[0003] Secondly, traditional building pipelines lack flow rate regulation mechanisms and cannot flexibly adjust the flow rate of the medium in the pipeline according to actual needs. During the construction process, the requirements for pipeline transportation capacity are different at different stages and locations. For example, in the concrete pouring stage, large flow and high-speed transportation capacity are required, while in the daily water supply stage, a stable and controllable flow rate is required. Due to the lack of regulation mechanisms, traditional pipelines can only maintain a fixed flow rate and cannot adapt to the dynamic needs of the construction site. This not only affects the pipeline transportation efficiency, but may also cause the pipeline pressure to be too high or too low, causing safety hazards.
[0004] In addition, construction pipelines often require multiple pipe sections to be connected in order to achieve long-distance transportation. However, due to the length and weight of the pipeline itself, great care and precision are required during the connection process. Traditional connection methods mainly rely on manpower or simple lifting equipment, but this method cannot ensure the smooth alignment of the pipeline ends, affecting the connection quality. At the same time, manually lifting and moving bulky pipe sections is very laborious, which is not only inefficient, but also poses a safety hazard. Construction workers are in improper working postures for a long time, which can easily cause occupational injuries. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the problems existing in the prior art, the utility model provides a construction pipeline for a building project to solve the technical problem mentioned in the background technology that the traditional building pipeline lacks a necessary filtering structure.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering construction pipeline, including a pipeline main body, a flow component is arranged on the pipeline main body, and the flow component includes a filter screen, an impurity collection box, a debris discharge port, a guide rod, an impurity bearing plate, a sealing rubber ring and an adjusting threaded screw, the filter screen is installed inside the pipeline main body, the impurity collection box is fixedly installed at the bottom of the pipeline main body, the debris discharge port is opened on one side of the impurity collection box, the guide rod is installed inside the impurity collection box, the impurity bearing plate is slidably installed on the guide rod, the sealing rubber ring is installed on the outside of the impurity bearing plate, the sealing rubber ring is fitted with the inner side of the impurity collection box, the adjusting threaded screw is threadedly connected to the impurity bearing plate and the impurity collection box, a speed regulating component is installed at one end of the pipeline main body, the speed regulating component includes a fixed pipe, a movable pipe and a motor, the fixed pipe is installed at one end of the pipeline main body, the movable pipe is slidably connected to the inner side of the fixed pipe, and the motor is fixedly installed on the fixed pipe.
[0009] The utility model is further configured that a turning handle is installed at the bottom of the adjusting threaded screw rod, and the turning handle is used to make the rotation process of the adjusting threaded screw rod more convenient.
[0010] The utility model is further configured such that a threaded rod is connected to the output end of the motor, one end of the threaded rod is connected to the movable tube, and a sliding rod is provided between the fixed tube and the movable tube for sliding connection, so that the process of flow rate control is facilitated through the coordinated use of various components.
[0011] The utility model is further configured that one end of the moving tube is connected with an elastic sheet, and one end of the elastic sheet is connected with a sliding block, and the sliding movement process of the sliding block is completed through the coordinated use of various components.
[0012] The utility model is further configured that a sliding groove is provided on the fixed tube, and the sliding groove is adapted to the sliding block, so that the sliding movement process of the sliding block is more stable through the coordinated use of various components.
[0013] The utility model is further configured such that a fixing component is arranged on the outside of the pipeline body, and the fixing component includes a support plate, a support frame and a limiting ring, the support plate is arranged at the lower end of the pipeline body, the support frame is fixedly mounted on the support plate, and the limiting ring is fixedly mounted on the support frame, and the fixing process of the pipeline body is completed through the coordinated use of various components.
[0014] The utility model is further configured such that a screw is threadedly connected on the limit ring, a clamp is connected to the top of the screw, the clamp is fitted with the pipe body, and a short tube is provided on one side of the pipe body. The coordinated use of various components facilitates the completion of the fixed installation process of the pipe body.
[0015] The utility model is further configured such that an electric push rod is installed on the top of the short tube, and a pressing plate is connected to the output end of the electric push rod. The pressing plate fits with the pipeline body, and the fixing process of the pipeline body is more stable through the coordinated use of various components.
[0016] (III) Beneficial effects
[0017] Compared with the prior art, the utility model provides a construction pipeline for a building project, which has the following
[0018] Beneficial effects:
[0019] 1. The design of the flow component cleverly introduces the filter screen and impurity collection box, which can effectively intercept waste impurities in sewage and prevent them from entering the pipeline, thereby reducing the risk of pipeline blockage. The filter screen can intercept large particles of solid impurities, while the impurity collection box can collect and store the filtered impurities for centralized processing and cleaning. The matching design of the impurity carrier plate and the sealing rubber ring can realize the automatic collection and regular cleaning of impurities, greatly reducing the burden of manual cleaning. At the same time, the setting of the impurity discharge port makes the cleaning of impurities more convenient and quick. This automated and modular impurity filtering and cleaning solution not only improves the patency and service life of the pipeline, but also reduces maintenance costs and manpower investment.
[0020] 2. The introduction of the speed regulating component enables the pipeline to flexibly adjust the flow speed of the water flow according to actual needs. Through the cooperation of the motor-driven threaded rod and the moving tube, the flow rate can be adjusted steplessly and precisely controlled. When the water flow needs to be increased, the motor rotates forward, driving the moving tube to move away from the motor, expanding the effective cross-sectional area of the pipeline, thereby increasing the flow rate. When the water flow needs to be reduced, the motor rotates in the reverse direction, driving the moving tube to move closer to the motor, reducing the effective cross-sectional area of the pipeline, thereby reducing the flow rate. This flexible and controllable flow rate adjustment mechanism can optimize the pipeline's transportation efficiency according to the actual needs of the construction site, ensure the stability of the pipeline pressure, and improve the reliability and adaptability of the system.
[0021] 3. The design of the fixing components provides strong support and guarantee for the installation and connection of the pipeline. The setting of the support plate and the support frame can provide stable support and fixation for the pipeline to prevent the pipeline from displacement or deformation. The cooperation of the limit ring and the clamp can firmly clamp the end of the pipeline to achieve reliable connection between pipelines. The introduction of electric push rods and pressing sheets further improves the automation and accuracy of pipeline connection and reduces the difficulty and intensity of manual operation. This modular and standardized pipeline fixing and connection solution not only improves the installation efficiency and quality, but also reduces the labor intensity and safety risks of construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of a construction pipeline for a building project in the utility model;
[0023] Figure 2 It is a cross-sectional structural schematic diagram of the utility model;
[0024] Figure 3 It is a schematic diagram of the enlarged structure of A in the utility model;
[0025] Figure 4 This is a schematic diagram of the structure of the speed regulating assembly in the utility model;
[0026] Figure 5 It is a schematic cross-sectional structural diagram of the speed regulating assembly in the utility model.
[0027] In the figure: 1. pipeline body; 2. filter screen; 3. impurity collection box; 4. impurity discharge port; 5. guide rod; 6. impurity bearing plate; 7. sealing rubber ring; 8. adjusting threaded screw; 9. fixed tube; 10. movable tube; 11. motor; 12. turning handle; 13. threaded rod; 14. sliding rod; 15. elastic sheet; 16. sliding block; 17. sliding groove; 18. support plate; 19. support frame; 20. limiting ring; 21. screw; 22. clamping piece; 23. short tube; 24. electric push rod; 25. pressing piece. DETAILED DESCRIPTION
[0028] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0029] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.
[0030] In the present invention, unless otherwise specified, directions such as "up" and "down" are usually used in reference to the directions shown in the drawings, or in reference to the vertical, perpendicular or gravity direction; similarly, for ease of understanding and description, "left" and "right" are usually used in reference to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directions are not used to limit the present invention.
[0031] See also Figure 1-5A construction pipeline for a building project comprises a pipeline body 1, on which a flow component is arranged, the flow component comprises a filter screen 2, an impurity collecting box 3, an impurity discharge port 4, a guide rod 5, an impurity bearing plate 6, a sealing rubber ring 7 and an adjusting threaded screw 8, the filter screen 2 is installed inside the pipeline body 1, the impurity collecting box 3 is fixedly installed at the bottom of the pipeline body 1, the impurity discharge port 4 is opened on one side of the impurity collecting box 3, the guide rod 5 is installed inside the impurity collecting box 3, the impurity bearing plate 6 is slidably installed on the guide rod 5, the sealing rubber ring 7 is installed on the outside of the impurity bearing plate 6, the sealing rubber ring 7 is fitted with the inner side of the impurity collecting box 3, the adjusting threaded screw 8 is threadedly connected with the impurity bearing plate 6 and the impurity collecting box 3, a speed regulating component is installed at one end of the pipeline body 1, the speed regulating component comprises a fixed pipe 9, a moving pipe 10 and a motor 11, the fixed pipe 9 is installed at one end of the pipeline body 1, the moving pipe 10 is slidably connected to the inner side of the fixed pipe 9, and the motor 11 is fixedly installed on the fixed pipe 9.
[0032] A turning handle 12 is installed at the bottom of the adjusting threaded screw 8 .
[0033] A threaded rod 13 is connected to the output end of the motor 11 , one end of the threaded rod 13 is connected to the moving tube 10 , and a sliding rod 14 is slidably connected between the fixed tube 9 and the moving tube 10 .
[0034] An elastic piece 15 is connected to one end of the moving tube 10 , and a sliding block 16 is connected to one end of the elastic piece 15 .
[0035] The fixed tube 9 is provided with a sliding groove 17 , which is matched with the sliding block 16 .
[0036] In the present embodiment, during use, water flows along the inside of the pipe body 1. At this time, there will be some impurities in the water flow. During the flow of the water flow, the impurities will be blocked by the filter screen 2, and the impurities will flow to the impurity carrier plate 6. After the impurities are collected to a certain extent, they need to be cleaned in time. At this time, the handle 12 is manually turned to drive the adjusting threaded screw 8 to rotate, thereby driving the impurity carrier plate 6 to move up and down, and in the guiding process of the guide rod 5, the impurity carrier plate 6 cooperates with the sealing rubber ring 7 to move more conveniently. After the impurity carrier plate 6 moves to the bottom of the impurity collection box 3, the impurities are taken out along the impurity discharge port 4. When it is necessary to adjust the flow speed of the water flow inside the pipe body 1 When the motor 11 is started manually, the motor 11 is driven to rotate the threaded rod 13 at the output end, and then the moving tube 10 is driven to slide along the fixed tube 9 under the promotion of the sliding rod 14. During the movement of the moving tube 10, the elastic sheet 15 is driven to expand and contract, thereby driving the sliding block 16 to slide in the sliding groove 17 on the fixed tube 9. When the sliding block 16 moves along the sliding groove 17 to the end of the fixed tube 9 close to the motor 11, the water flow increases. When the water flow needs to be reduced or even stopped, the motor 11 is driven in reverse manually to drive the threaded rod 13 to rotate in the opposite direction, and then the moving tube 10 is driven to move under the cooperation of the sliding rod 14, thereby driving the sliding block 16 to move in the opposite direction, thereby reducing the flow of water.
[0037] See also Figure 1-3 As an implementation method of a construction engineering pipeline for a fixed component: a fixed component is arranged on the outside of the pipeline body 1, and the fixed component includes a support plate 18, a support frame 19 and a limiting ring 20. The support plate 18 is arranged at the lower end of the pipeline body 1, the support frame 19 is fixedly installed on the support plate 18, and the limiting ring 20 is fixedly installed on the support frame 19.
[0038] A screw rod 21 is threadedly connected on the limiting ring 20 , a clamping piece 22 is connected to the top of the screw rod 21 , the clamping piece 22 fits with the pipe body 1 , and a short tube 23 is provided on one side of the pipe body 1 .
[0039] An electric push rod 24 is installed on the top of the short tube 23 , and a pressing piece 25 is connected to the output end of the electric push rod 24 . The pressing piece 25 fits with the pipeline body 1 .
[0040] More specifically, when fixing the pipe body 1, the two ends of the pipe body 1 are manually placed into the limiting ring 20 and the short tube 23 respectively. At this time, the electric push rod 24 is manually started to drive the pressure plate 25 at the output end to move, thereby completing the clamping process for one end of the pipe body 1, and the screw rod 21 is manually rotated to drive the screw rod 21 to move in the limiting ring 20, thereby driving the clamping plate 22 to fit with one end of the pipe body 1, thereby completing the fixing process.
[0041] In summary, the overall equipment is in use or running: during use, the water flows along the inside of the pipe body 1. At this time, there will be some impurities in the water flow. During the flow of the water, it will be blocked by the filter baffle 2, and the impurities will flow to the impurity carrier plate 6. After the impurities are collected to a certain extent, they need to be cleaned in time. At this time, the handle 12 is manually turned to drive the adjusting threaded screw 8 to rotate, thereby driving the impurity carrier plate 6 to move up and down, and during the guiding process of the guide rod 5, the impurity carrier plate 6 cooperates with the sealing rubber ring 7 to move more conveniently. After the impurity carrier plate 6 moves to the bottom of the impurity collection box 3, the impurities are taken out along the impurity discharge port 4. When the water flow rate inside the pipe body 1 needs to be adjusted, the impurities are removed along the impurity discharge port 4. When the degree is adjusted, the motor 11 is started manually to drive the threaded rod 13 at the output end to rotate, and then the moving tube 10 is driven to slide along the fixed tube 9 under the promotion of the sliding rod 14. During the movement of the moving tube 10, the elastic sheet 15 is driven to expand and contract, thereby driving the sliding block 16 to slide in the sliding groove 17 on the fixed tube 9. When the sliding block 16 moves along the sliding groove 17 to the end of the fixed tube 9 close to the motor 11, the water flow increases. When the water flow needs to be reduced or even stopped, the motor 11 is driven in the reverse direction by manual operation to drive the threaded rod 13 to rotate in the reverse direction, and then the moving tube 10 is driven to move under the cooperation of the sliding rod 14, thereby driving the sliding block 16 to move in the reverse direction, thereby reducing the flow of water.
[0042] When fixing the pipe body 1, the two ends of the pipe body 1 are manually placed into the limiting ring 20 and the short tube 23 respectively. At this time, the electric push rod 24 is manually started to drive the pressure plate 25 at the output end to move, thereby completing the clamping process for one end of the pipe body 1, and the screw rod 21 is manually rotated to drive the screw rod 21 to move in the limiting ring 20, thereby driving the clamping plate 22 to fit with one end of the pipe body 1, so as to complete the fixing process.
[0043] In all the schemes mentioned above, the connection between two parts can be selected according to actual conditions by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which are not described here one by one. In the above, all fixed connections are preferably welded. Although the embodiments of the utility model have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.
Claims
1. A construction pipeline for a building project, comprising a pipeline body (1), characterized in that: The pipeline body (1) is provided with a flow assembly, and the flow assembly comprises a filter screen (2), an impurity collection box (3), an impurity discharge port (4), a guide rod (5), an impurity bearing plate (6), a sealing rubber ring (7) and an adjusting threaded screw (8); the filter screen (2) is installed inside the pipeline body (1); the impurity collection box (3) is fixedly installed at the bottom of the pipeline body (1); the impurity discharge port (4) is opened on one side of the impurity collection box (3); the guide rod (5) is installed inside the impurity collection box (3); and the impurity bearing plate (6) is slidably installed on the guide rod (5). The sealing rubber ring (7) is installed on the outside of the impurity bearing plate (6), the sealing rubber ring (7) is in contact with the inner side of the impurity collecting box (3), the adjusting threaded screw (8) is threadedly connected with the impurity bearing plate (6) and the impurity collecting box (3), a speed regulating assembly is installed at one end of the pipeline body (1), the speed regulating assembly comprises a fixed tube (9), a movable tube (10) and a motor (11), the fixed tube (9) is installed at one end of the pipeline body (1), the movable tube (10) is slidably connected to the inner side of the fixed tube (9), and the motor (11) is fixedly installed on the fixed tube (9).
2. A construction engineering pipeline according to claim 1, characterized in that: A turning handle (12) is installed at the bottom of the adjusting threaded screw rod (8).
3. A construction engineering construction pipeline according to claim 2, characterized in that: The output end of the motor (11) is connected to a threaded rod (13), one end of the threaded rod (13) is connected to the moving tube (10), and a sliding rod (14) is slidably connected between the fixed tube (9) and the moving tube (10).
4. A construction engineering construction pipeline according to claim 3, characterized in that: One end of the moving tube (10) is connected to an elastic sheet (15), and one end of the elastic sheet (15) is connected to a sliding block (16).
5. A construction engineering construction pipeline according to claim 4, characterized in that: The fixed tube (9) is provided with a sliding groove (17), and the sliding groove (17) is adapted to the sliding block (16).
6. A construction pipeline for construction engineering according to any one of claims 1 to 5, characterized in that: A fixing assembly is arranged on the outside of the pipeline body (1), and the fixing assembly comprises a support plate (18), a support frame (19) and a limiting ring (20); the support plate (18) is arranged at the lower end of the pipeline body (1), the support frame (19) is fixedly mounted on the support plate (18), and the limiting ring (20) is fixedly mounted on the support frame (19).
7. A construction pipeline for construction engineering according to claim 6, characterized in that: A screw rod (21) is threadedly connected to the limiting ring (20), a clamping piece (22) is connected to the top of the screw rod (21), the clamping piece (22) is fitted with the pipe body (1), and a short tube (23) is provided on one side of the pipe body (1).
8. A construction pipeline for construction engineering according to claim 7, characterized in that: An electric push rod (24) is installed on the top of the short tube (23), and a pressing sheet (25) is connected to the output end of the electric push rod (24), and the pressing sheet (25) is in contact with the pipeline body (1).