Metal mine debris sampler
By designing a metal mine debris sampler, using the combination of multi-layer screen and material suction machine, the problem of debris and dust mixing during metal mine sampling is solved, and efficient debris sorting and dust filtration are achieved. Improve sampling efficiency and detection accuracy.
Patent Information
- Application Number
- CN202420918925.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2034-04-29
AI Technical Summary
During the sampling process of metal mines, the drilling rig drills out a mixture of metal debris and dust, which leads to secondary filtration during subsequent testing, which increases labor intensity and the active metal may react with water, reducing the accuracy of the detection results.
A metal mine chip sampler was designed, including a plate truck, sorting box, suction machine, screen and feeding board. The debris were input into the sorting box through the suction machine, and the particle volume was used to use a multi-layer screen to perform particle volume. Sorting size and filtration of dust avoid manual secondary filtration.
It effectively improves the sampling efficiency of metal mine debris, reduces the labor intensity of subsequent testing, and improves the accuracy of the test results.
Smart Images

Figure CN222514471U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of metal mine sampling, in particular to a metal mine debris sampler. Background Art
[0002] Metal mines refer to mines that specialize in mining metal mineral resources, mainly including non-ferrous metals and precious metals such as gold, silver, copper, iron, aluminum, and zinc. The mining process of these mines involves multiple links such as geological exploration, rock drilling and blasting, mine construction, and mineral processing.
[0003] Before mining a metal mine, it is necessary to sample and test the metal ore components inside it to determine whether it is worth mining. When sampling, it is necessary to use a drill to drill holes on the surface of the metal mine. The debris discharged from the drill hole is the sampling sample. The operator needs to test these debris to see if there are mineable metal components.
[0004] However, when a drill drills a hole in the surface of a metal mine, not only may metal debris be drilled out, but the metal debris will also be drilled into debris along with dust by the drill. Operators need to collect these debris mixed with the dust to prevent the on-site picking from easily missing some metal samples. However, before the subsequent metal inspection, the metal mixed with dust needs to be cleaned. This step increases the labor intensity of subsequent inspection personnel. At the same time, some more active metals may react when encountering water, which can easily reduce the accuracy of the subsequent inspection results of the finished product. In view of this, a metal mine debris sampler is provided to overcome the above-mentioned defects. Utility Model Content
[0005] The utility model aims to solve the shortcomings in the prior art and proposes a metal mine debris sampler.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a metal mine debris sampler, including a cart, a sorting box is fixedly connected to the top of the cart, a suction machine is fixedly connected to the lower front end of the sorting box, the suction machine input end is fixedly connected to a suction plate, the suction machine output end is fixedly connected to a feed pipe, frames are fixedly connected to the upper, middle and lower parts of the sorting box, a first screen, a second screen and a third screen are fixedly connected to the inner side of the frame, a first discharge chute is opened above the front and rear surfaces of the sorting box, a second discharge chute is opened in the middle of the front and rear surfaces of the sorting box, a third discharge chute is opened in the middle of the front and rear surfaces of the sorting box, extension plates are fixedly connected to the front and rear end surfaces of the sorting box, the top of the extension plate is in contact with a receiving plate, and a magnetic block is fixedly connected to the inner end surface of the receiving plate.
[0007] As a further description of the above technical solution: the top right side of the feed pipe is fixedly connected to the top of the sorting box, the inner end surface of the receiving plate is in contact with the front and rear surfaces of the sorting box, and the front and rear surfaces of the sorting box are magnetically attracted to the magnetic block. The debris accumulated on the surface after the drill rig drills a hole in the metal mine can be collected, and the debris can be sorted according to the particle size. At the same time, the dust mixed in the debris can be filtered to prevent the need for secondary filtration of the debris mixed with dust when manual sampling of the debris is required.
[0008] As a further description of the above technical solution: the number of the frames is three, and the frames are distributed at the upper, middle and lower positions inside the sorting box, the first screen inside the frame is distributed at the upper position inside the sorting box, the second screen inside the frame is distributed at the middle position inside the sorting box, and the third screen inside the frame is distributed at the lower position inside the sorting box, so that the debris entering the sorting box can be graded and screened.
[0009] As a further description of the above technical solution: the cross-sectional shape of the frame is an isosceles trapezoid, and the frame has two inclined surfaces distributed at the front and rear positions inside the sorting box. The left and right length of the frame is the same as the length from left to right inside the sorting box, so that metal debris falling on the first screen, the second screen and the third screen can follow the inclined surface to move toward the receiving plates arranged on the front and rear surfaces of the sorting box.
[0010] As a further description of the above technical solution: the width of the first discharge trough on the front and rear surfaces of the sorting box is twice that of the second discharge trough, and the width of the second discharge trough on the front and rear surfaces of the sorting box is twice that of the third discharge trough, which can prevent debris with a particle volume larger than the first discharge trough, the second discharge trough and the third discharge trough from being blocked inside the sorting box and unable to be discharged from the first discharge trough, the second discharge trough and the third discharge trough.
[0011] As a further description of the above technical solution: the pore size of the first screen is three times the pore size of the second screen, and the pore size of the second screen is twice the pore size of the third screen. Debris of different sizes can be sorted, and debris with large particles automatically moves from top to bottom to the receiving plate.
[0012] As a further description of the above technical solution: a plurality of circular holes are opened on the front and rear surfaces of the sorting box, and the diameter and depth of the circular holes opened on the front and rear surfaces of the sorting box are the same as the cross-sectional diameter and length of the magnetic blocks, the circular holes opened on the front and rear surfaces of the sorting box and their distribution are the same as the number and distribution of the magnetic blocks, and the magnetic blocks are used to insert into the grooves on the front and rear surfaces of the sorting box to limit and fix the connecting plate, thereby improving the installation efficiency of the connecting plate.
[0013] The utility model has the following beneficial effects:
[0014] The metal mine debris sampler designed by the utility model can, through design coordination, collect the debris accumulated on the surface of the metal mine after the drill rig drills a hole, and sort the debris according to the particle size, and filter the dust mixed in the debris, so as to avoid the need for secondary filtration of the debris mixed with dust when manually sampling the debris, thereby effectively improving the sampling efficiency of the metal mine debris, and the receiving plate for collecting the sorted debris can be disassembled, so that the operator can dump and detect the debris inside it, and a magnetic block is arranged on the inner end surface of the receiving plate, and the magnetic block is used to be inserted into the grooves on the front and rear surfaces of the sorting box to limit and fix the receiving plate, thereby improving the installation efficiency of the receiving plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the cross-sectional three-dimensional structure of the sorting box of the utility model;
[0017] Figure 3 This is a schematic diagram of the overall structure of the framework of the utility model;
[0018] Figure 4 It is a schematic diagram of the three-dimensional structure of the material receiving plate of the utility model after being flipped 180 degrees horizontally.
[0019] Legend:
[0020] 1. Cart; 2. Sorting box; 3. Suction machine; 4. Suction plate; 5. Feed pipe; 6. Frame; 7. First screen; 8. First discharge chute; 9. Extension plate; 10. Receiving plate; 11. Second screen; 12. Third screen; 13. Second discharge chute; 14. Third discharge chute; 15. Magnetic block. DETAILED DESCRIPTION
[0021] Reference Figure 1-4The utility model provides a metal mine debris sampler, including a cart 1, a sorting box 2 is welded on the top of the cart 1, a suction machine 3 is fixed by bolts below the front end of the sorting box 2, a suction plate 4 is arranged at the input end of the suction machine 3, a feeding pipe 5 is fixed at the output end of the suction machine 3 by bolts, a frame 6 is welded at the top, middle and bottom of the sorting box 2, a first screen 7, a second screen 11 and a third screen 12 are welded inside the frame 6, a first discharge trough 8 is provided above the front and rear surfaces of the sorting box 2, a second discharge trough 13 is provided in the middle of the front and rear surfaces of the sorting box 2, and a third discharge trough 14 is provided in the middle of the front and rear surfaces of the sorting box 2 , extension plates 9 are welded to the front and rear end surfaces of the sorting box 2, the top of the extension plate 9 is in contact with the receiving plate 10, the inner end surface of the receiving plate 10 is connected to the magnetic block 15 by adhesive, the top of the right side of the feeding pipe 5 is fixedly connected to the top of the sorting box 2, the inner end surface of the receiving plate 10 is in contact with the front and rear surfaces of the sorting box 2, and the front and rear surfaces of the sorting box 2 are magnetically attracted to the magnetic block 15. The debris accumulated on the surface after the drilling rig drills a hole in the metal mine can be collected, and the debris can be sorted according to the particle size. At the same time, the dust mixed in the debris can be filtered to prevent the need for secondary filtration of the debris mixed with dust when manually sampling the debris.
[0022] As a further implementation scheme of the above technical scheme: the number of frames 6 is three, and the frames 6 are distributed at the upper, middle and lower positions inside the sorting box 2, the first screen 7 inside the frame 6 is distributed at the upper position inside the sorting box 2, the second screen 11 inside the frame 6 is distributed at the middle position inside the sorting box 2, and the third screen 12 inside the frame 6 is distributed at the lower position inside the sorting box 2, so that the debris entering the sorting box 2 can be graded and screened.
[0023] As a further implementation scheme of the above technical scheme: the cross-sectional shape of the frame 6 is an isosceles trapezoid, and the frame 6 has two inclined surfaces distributed at the front and rear positions inside the sorting box 2, and the left and right lengths of the frame 6 are the same as the length from left to right inside the sorting box 2, so that the metal debris falling on the first screen 7, the second screen 11 and the third screen 12 can follow the inclined surfaces to move toward the receiving plate 10 arranged on the front and rear surfaces of the sorting box 2.
[0024] As a further implementation scheme of the above technical scheme: the width of the first discharge trough 8 on the front and rear surfaces of the sorting box 2 is twice that of the second discharge trough 13, and the width of the second discharge trough 13 on the front and rear surfaces of the sorting box 2 is twice that of the third discharge trough 14, which can prevent debris with a particle volume larger than the first discharge trough 8, the second discharge trough 13 and the third discharge trough 14 from being blocked inside the sorting box 2 and unable to be discharged from the first discharge trough 8, the second discharge trough 13 and the third discharge trough 14.
[0025] As a further implementation scheme of the above technical scheme: the pore size of the first screen 7 is three times the pore size of the second screen 11, and the pore size of the second screen 11 is twice the pore size of the third screen 12, so that debris of different sizes can be sorted, and debris with large particles automatically moves from top to bottom to the receiving plate 10.
[0026] As a further implementation scheme of the above technical scheme: a plurality of circular holes are opened on the front and rear surfaces of the sorting box 2, and the diameter and depth of the circular holes opened on the front and rear surfaces of the sorting box 2 are the same as the cross-sectional diameter and length of the magnetic block 15, the circular holes opened on the front and rear surfaces of the sorting box 2 and their distribution are the same as the number and distribution of the magnetic block 15, and the magnetic block 15 is used to insert into the grooves on the front and rear surfaces of the sorting box 2 to limit and fix the receiving plate 10, thereby improving the installation efficiency of the receiving plate 10.
[0027] Working principle:
[0028] When using the utility model, the drill is first used to drill holes on the surface of the metal mine, and the drilled debris is accumulated on the outside of the hole. Then the cart 1 is pushed, and at the same time, six receiving plates 10 are placed above the extension plate 9, and then the receiving plate 10 is moved to the position of the sorting box 2 until the magnetic block 15 on the inner end surface of the receiving plate 10 is inserted into the groove on the front and rear surfaces of the sorting box 2, and the magnetic block 15 is magnetically fixed to the sorting box 2, and then the suction machine 3 on the left side of the sorting box 2 on the top of the cart 1 is opened, and the suction machine 3 sucks the debris through the suction plate 4, and sends the debris into the sorting box 2 through the feed pipe 5, and the debris falls downward from the upper part of the sorting box 2, and first falls on the first screen 7 on the inner side of the frame 6, and the debris with a particle volume smaller than the pores of the first screen 7 passes through the first screen 7 to move to the second screen 11, and the debris with a particle volume larger than the pores of the first screen 7 moves from the first screen 7 to the first discharge chute 8, and falls from the first discharge chute 8 to the receiving The material plate 10, and the debris that passes through the first screen 7 and moves to the second screen 11 falls on the second screen 11, the debris with a particle volume smaller than the pores of the second screen 11 passes through the second screen 11 and moves to the third screen 12, and the debris with a particle volume larger than the pores of the second screen 11 moves from the second screen 11 to the second discharge chute 13 and also enters the receiving plate 10, and finally passes through the second screen 11 and moves to the third screen 12 and falls on the third screen 12, debris with a particle volume smaller than the pores of the third sieve 12 passes through the third sieve 12 to move to the bottom of the sorting box 2 and is discharged from the sorting box 2, while debris with a particle volume larger than the pores of the third sieve 12 moves from the third sieve 12 to the third discharge chute 14, and most of the debris discharged from the sorting box 2 is dust. This filtering method can prevent the need for secondary filtration of debris mixed with dust when manual sampling of debris is performed, thereby effectively improving the sampling efficiency of metal mine debris.
[0029] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A metal mine debris sampler, comprising a cart (1), characterized in that: A sorting box (2) is fixedly connected to the top of the cart (1), a suction machine (3) is fixedly connected to the lower front end of the sorting box (2), a suction plate (4) is fixedly connected to the input end of the suction machine (3), a conveying pipe (5) is fixedly connected to the output end of the suction machine (3), a frame (6) is fixedly connected to the top, middle and bottom of the sorting box (2), a first screen (7), a second screen (11) and a third screen (12) are fixedly connected to the inner side of the frame (6), a first discharge trough (8) is provided above the front and rear surfaces of the sorting box (2), a second discharge trough (13) is provided in the middle of the front and rear surfaces of the sorting box (2), and a third discharge trough (14) is provided in the middle of the front and rear surfaces of the sorting box (2), an extension plate (9) is fixedly connected to the front and rear end surfaces of the sorting box (2), a top of the extension plate (9) contacts a receiving plate (10), and a magnetic block (15) is fixedly connected to the inner end surface of the receiving plate (10).
2. A metal mine debris sampler according to claim 1, characterized in that: The top right side of the material conveying pipe (5) is fixedly connected to the top of the sorting box (2), the inner end surface of the material receiving plate (10) is in contact with the front and rear surfaces of the sorting box (2), and the front and rear surfaces of the sorting box (2) are magnetically attracted to the magnetic block (15).
3. A metal mine debris sampler according to claim 1, characterized in that: The number of the frames (6) is three, and the frames (6) are distributed at the upper, middle and lower positions inside the sorting box (2); the first screen (7) inside the frame (6) is distributed at the upper position inside the sorting box (2); the second screen (11) inside the frame (6) is distributed at the middle position inside the sorting box (2); and the third screen (12) inside the frame (6) is distributed at the lower position inside the sorting box (2).
4. A metal mine debris sampler according to claim 1, characterized in that: The cross-sectional shape of the frame (6) is an isosceles trapezoid, and the frame (6) has two inclined surfaces distributed at the front and rear positions inside the sorting box (2), and the left-right length of the frame (6) is the same as the length from left to right inside the sorting box (2).
5. The metal mine debris sampler according to claim 1, characterized in that: The width of the first discharge trough (8) on the front and rear surfaces of the sorting box (2) is twice that of the second discharge trough (13), and the width of the second discharge trough (13) on the front and rear surfaces of the sorting box (2) is twice that of the third discharge trough (14).
6. A metal mine debris sampler according to claim 1, characterized in that: The pore size of the first sieve (7) is three times the pore size of the second sieve (11), and the pore size of the second sieve (11) is twice the pore size of the third sieve (12).
7. A metal mine debris sampler according to claim 1, characterized in that: The front and rear surfaces of the sorting box (2) are provided with a plurality of circular holes, and the diameter and depth of the circular holes provided on the front and rear surfaces of the sorting box (2) are the same as the cross-sectional diameter and length of the magnetic block (15), and the number and distribution of the circular holes provided on the front and rear surfaces of the sorting box (2) are the same as those of the magnetic block (15).