Double-pile-casing structure for underwater pile foundation construction
By introducing electric telescopic rods into the double-cabin structure constructed underwater pile foundation, the movement of the inner cabin is solved, and the problem that the double-cabin structure in the prior art cannot change the position of the inner cabin is reduced, and manpower and money are reduced. loss.
Patent Information
- Application Number
- CN202421191428.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-05-29
AI Technical Summary
The existing double-carriage structure cannot directly change the position of the inner carriage after installation, resulting in loss of manpower and money.
A double-bore guard structure for underwater pile foundation construction is designed. The block is fixedly connected to the inner wall of the outer casing, and the placing block is slidingly connected to the moving groove, and the placing groove is fixedly connected to the electric telescopic rod, and the electric telescopic rod is close to the end. Connect the inner casing between them to realize the movement of the inner casing.
When it is necessary to change the position between the outer casing and the inner casing, the inner casing can be moved through the activation of the electric telescopic rod and its position can be changed without the need to re-release the outer casing, avoiding the loss of manpower and money.
Smart Images

Figure CN222525345U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of double casings, in particular to a double casing structure used for underwater pile foundation construction. Background Art
[0002] The construction of bored piles is divided into two parts: hole formation and pile formation. Therefore, the inspection of pile foundation can be divided into two parts: hole formation quality inspection and pile formation quality inspection. Among them, hole formation is the first link in the construction of bored piles. Since the hole formation operation is completed underground and underwater, the quality control is difficult. Complex geological conditions or mistakes in construction may cause hole collapse, diameter reduction, pile hole deviation, excessive sediment thickness and other problems. Pile quality inspection can be divided into bearing capacity inspection and integrity inspection.
[0003] The existing double casing structure has certain drawbacks. When the double casing is installed, when the position of the casing needs to be changed, the position of the inner casing cannot be changed directly, resulting in loss of manpower and money. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the shortcomings of the prior art, the present invention provides a double casing structure for underwater pile foundation construction, which solves certain drawbacks of the existing double casing structure. When the double casing is installed, when the position of the casing needs to be changed, the position of the inner casing cannot be directly changed, resulting in a loss of manpower and money.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a double casing structure for underwater pile foundation construction, comprising an outer casing, the circumferential inner wall of the outer casing is fixedly connected with four placement blocks, the interiors of the four placement blocks are slidably connected with movable grooves, the interiors of the four movable grooves are fixedly connected with electric telescopic rods, an inner casing is connected between the adjacent ends of the four electric telescopic rods, the outer casing and the inner casing cooperate with each other, the upper end of the inner casing is fixedly connected with a connecting plate, the upper end of the outer casing is fixedly connected with a fixing plate, the upper end of the fixing plate is fixedly connected with a soft plate, the soft plate is connected to the outer surface of the connecting plate, and the soft plate cooperates with the outer casing and the inner casing.
[0008] Preferably, the lower end of the outer casing is fixedly connected to a bottom plate, and the upper end of the bottom plate is slidably connected to the lower end of the inner casing.
[0009] Preferably, the four placing blocks are provided with limiting grooves inside, the four limiting grooves are slidably connected with first sliders inside, and the close ends of the four first sliders are fixedly connected to the far ends of the four electric telescopic rods respectively.
[0010] Preferably, two moving blocks are fixedly connected to the outer surface of the outer casing.
[0011] Preferably, sealing rings are fixedly mounted on the outer surface of the inner casing and the inner surface of the connecting plate, and the sealing rings cooperate with the bottom plate and the connecting plate.
[0012] Preferably, the ends of the two moving blocks that are far away from each other are both provided with a card slot.
[0013] Preferably, the four electric telescopic rods are all connected to an external PLC control panel signal.
[0014] Beneficial Effects
[0015] The new utility model provides a double casing structure for underwater pile foundation construction. It has the following beneficial effects:
[0016] When the position between the outer casing and the inner casing needs to be changed, the electric telescopic rod is started to move the inner casing placed inside the outer casing. Since the electric telescopic rod slides inside the moving groove, the position of the inner casing can be changed inside the outer casing. At this time, there is no need to lower the outer casing again, which causes loss of manpower and money. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the practical structure of the new invention;
[0018] Figure 2 This is the first practical stereogram of the new invention;
[0019] Figure 3 This is the second practical stereogram of the present invention;
[0020] Figure 4 This is the first practical cross-sectional view of the present invention.
[0021] In the figure: 1. outer casing; 2. inner casing; 3. bottom plate; 4. connecting plate; 5. fixing plate; 6. soft plate; 7. placement block; 8. moving groove; 9. electric telescopic rod; 10. moving block; 11. card slot; 12. sealing ring. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the practical embodiments of the new model to clearly and completely describe the technical solutions in the practical embodiments of the new model. Obviously, the described embodiments are only part of the embodiments of the new model, not all of them. Based on the embodiments in the new model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the new model.
[0023] See also Figure 1-4 The present invention provides a technical solution: a double casing structure for underwater pile foundation construction, comprising an outer casing 1, the circumferential inner wall of the outer casing 1 is fixedly connected with four placement blocks 7, the interiors of the four placement blocks 7 are slidably connected with moving grooves 8, the interiors of the four moving grooves 8 are fixedly connected with electric telescopic rods 9, the adjacent ends of the four electric telescopic rods 9 are connected with an inner casing 2, the outer casing 1 and the inner casing 2 cooperate with each other, the upper end of the inner casing 2 is fixedly connected with a connecting plate 4, the upper end of the outer casing 1 is fixedly connected with a fixing plate 5, the upper end of the fixing plate 5 is fixedly connected with a soft plate 6, the soft plate 6 is connected to the outer surface of the connecting plate 4, and the soft plate 6 cooperates with the outer casing 1 and the inner casing 2.
[0024] During operation, when the position between the outer casing 1 and the inner casing 2 needs to be changed, the electric telescopic rod 9 is started, and the inner casing 2 placed inside the outer casing 1 can be moved by the electric telescopic rod 9. Since the electric telescopic rod 9 slides inside the moving groove 8, the inner casing 2 can be changed inside the outer casing 1. At this time, there is no need to lower the outer casing 1 again, thereby causing loss of manpower and money. The electric telescopic rod 9 is the prior art. The working principle of the electric telescopic rod is mainly based on motor drive and spiral combination transmission structure. In the electric telescopic rod, the motor is the core component, which controls the extension and contraction of the telescopic rod by rotation. When the motor is started, the output shaft generates a rotational force, which is transmitted to the telescopic rod through the connector of the telescopic rod, thereby driving the extension and contraction of the telescopic rod. When the motor stops working, the telescopic rod will also stop extending and be fixed at the current length.
[0025] See also Figure 1-4 The present invention provides a technical solution: the lower end of the outer casing 1 is fixedly connected with a bottom plate 3, and the upper end of the bottom plate 3 is slidably connected with the lower end of the inner casing 2.
[0026] During operation, the bottom plate 3 can prevent the silt in the water from entering the outer casing 1 and the inner casing 2 .
[0027] See also Figure 1-4The present invention provides a technical solution: the four placement blocks 7 are provided with limiting grooves inside, the four limiting grooves are slidably connected with first sliders inside, and the close ends of the four first sliders are fixedly connected to the far ends of the four electric telescopic rods 9 respectively.
[0028] During operation, the first slider is fixedly connected to the electric telescopic rod 9, so as to limit the movement of the electric telescopic rod 9.
[0029] See also Figure 1-4 The present invention provides a technical solution: two moving blocks 10 are fixedly connected to the outer surface of the outer casing 1 .
[0030] During operation, the outer casing 1 can be moved better through the two 20 .
[0031] See also Figure 1-4 The present invention provides a technical solution: a sealing ring 12 is fixedly installed on the outer surface of the inner casing 2 and the inner surface of the connecting plate 4, and the sealing ring 12 cooperates with the bottom plate 3 and the connecting plate 4.
[0032] During operation, the sealing ring 12 cooperates with the bottom plate 3 and the connecting plate 4 to prevent external water and cement from entering between the outer casing 1 and the inner casing 2 .
[0033] See also Figure 1-4 The present invention provides a technical solution: the two moving blocks 10 are provided with a card slot 11 at their ends which are far away from each other.
[0034] During operation, the moving block 10 can be moved better through the card slot 11 .
[0035] See also Figure 1-4 The present invention provides a technical solution: the four electric telescopic rods 9 are all connected to the external PLC control board signal.
[0036] During operation, the movement of the four electric telescopic rods 9 can be controlled through an external PLC control panel.
[0037] In summary, when the position between the outer casing 1 and the inner casing 2 needs to be changed, the electric telescopic rod 9 is started, and the inner casing 2 placed inside the outer casing 1 can be moved by the electric telescopic rod 9. Since the electric telescopic rod 9 slides inside the moving groove 8, the position of the inner casing 2 can be changed inside the outer casing 1. At this time, there is no need to lower the outer casing 1 again, which causes loss of manpower and money.
[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0039] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A double casing structure for underwater pile foundation construction, comprising an outer casing (1), characterized in that: Four placement blocks (7) are fixedly connected to the circumferential inner wall of the outer casing (1), and movable grooves (8) are slidably connected inside the four placement blocks (7). Electric telescopic rods (9) are fixedly connected inside the four movable grooves (8), and the inner casing (2) is connected between the adjacent ends of the four electric telescopic rods (9). The outer casing (1) and the inner casing (2) cooperate with each other, and the upper end of the inner casing (2) is fixedly connected to a connecting plate (4), and the upper end of the outer casing (1) is fixedly connected to a fixing plate (5), and the upper end of the fixing plate (5) is fixedly connected to a soft plate (6), and the soft plate (6) is connected to the outer surface of the connecting plate (4), and the soft plate (6) cooperates with the outer casing (1) and the inner casing (2).
2. A double casing structure for underwater pile foundation construction according to claim 1, characterized in that: The lower end of the outer casing (1) is fixedly connected to a bottom plate (3), and the upper end of the bottom plate (3) is slidably connected to the lower end of the inner casing (2).
3. The double casing structure for underwater pile foundation construction according to claim 1 is characterized in that: Limiting grooves are provided inside the four placement blocks (7), and first sliding blocks are slidably connected inside the four limiting grooves. The close ends of the four first sliding blocks are fixedly connected to the far ends of the four electric telescopic rods (9), respectively.
4. The double casing structure for underwater pile foundation construction according to claim 1 is characterized in that: Two moving blocks (10) are fixedly connected to the outer surface of the outer casing (1).
5. The double casing structure for underwater pile foundation construction according to claim 1 is characterized in that: A sealing ring (12) is fixedly mounted on the outer surface of the inner casing (2) and the inner surface of the connecting plate (4), and the sealing ring (12) cooperates with the bottom plate (3) and the connecting plate (4).
6. A double casing structure for underwater pile foundation construction according to claim 4, characterized in that: The two moving blocks (10) are each provided with a clamping slot (11) at the ends away from each other.
7. A double casing structure for underwater pile foundation construction according to claim 1, characterized in that: The four electric telescopic rods (9) are all connected to an external PLC control panel signal.