By introducing an electric push rod-driven lifting mechanism into the central air-conditioning energy efficiency detection device, the automatic upward docking of the fixed frame is realized, and the time-consuming and labor-intensive detection process in the prior art is solved, and the detection efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202420496984.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The existing central air-conditioning energy efficiency detection device needs to manually lift and stabilize the rectangular frame during use, which makes the detection process time-consuming and labor-intensive and affects the detection efficiency.
An air conditioner energy efficiency detection device is designed, using an electric push rod to drive the lifting mechanism, and the fixed frame is driven upward to connect with the air outlet of the central air conditioner fan coil through the electric push rod to form a sealing structure to realize automatic detection.
Through the automated docking process, the detection efficiency is improved, the time and energy of manual operation is reduced, and the accuracy and stability of the detection is enhanced.
Smart Images

Figure CN222528955U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of central air-conditioning detection, in particular to an air-conditioning energy efficiency detection device. Background Art
[0002] The central air conditioning system consists of one or more cold and heat source systems and multiple air conditioning systems. This system is different from traditional refrigerant air conditioners (such as single units, VRV) that centrally process air to achieve comfort requirements. The principle of liquid vaporization refrigeration is used to provide the required cooling capacity for the air conditioning system to offset the heat load of the indoor environment; the heating system provides the required heat for the air conditioning system to offset the cooling and heating loads of the indoor environment. Generally, after the central air conditioner is produced, it is necessary to test its energy efficiency ratio so that it can be classified according to energy saving.
[0003] For example, the Chinese patent publication number is CN213364247U, and the technical solution disclosed in the patent document is as follows: a central air-conditioning energy efficiency detection device, including a rectangular frame and a fixed frame, the bottom of the rectangular frame is connected to a connecting bucket, and a temperature detector is fixedly installed on the front side of the rectangular frame, the bottom of the connecting bucket is connected to a connecting pipe, a flow meter is arranged on the connecting pipe, and a heat insulation layer is fixedly connected to the inner wall of the rectangular frame. In the utility model, the energy efficiency detection device can simply and quickly detect the energy efficiency ratio of the central air-conditioning, and the fixed frame can be easily replaced through the coordinated use of the frame-type mounting groove, the frame-type mounting strip, the first magnet and the second magnet, so as to connect central air-conditioning fan coils of different sizes, and the sealing performance is increased through the coordinated use of the sealing gasket, the frame-type sealing groove and the frame-type sealing ring, so as to prevent the loss of air volume and increase the accuracy of the detection.
[0004] However, when the above-mentioned prior art is used, it is necessary to cooperate with the fixed frame to lift the rectangular frame and connect it to the air outlet of the central air conditioner, and during the detection process, it is necessary to hold the rectangular frame to keep it stable, which makes the detection process time-consuming and labor-intensive, and affects the detection efficiency. Utility Model Content
[0005] 1. Technical issues to be solved
[0006] In view of the deficiencies in the prior art, the utility model provides an air-conditioning energy efficiency detection device.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an air-conditioning energy efficiency detection device, comprising a base plate, a fixed frame is arranged above the base plate, a connecting pipe is arranged at the bottom of the fixed frame, and a lifting mechanism is arranged at the top of the base plate; the lifting mechanism comprises an electric push rod, a fixed plate and an L-shaped rod, the electric push rod is fixedly installed on the top of the base plate, the fixed plate is fixedly installed on the output end of the electric push rod, a hole is opened in the center of the fixed plate, the L-shaped rod is fixedly installed at the bottom of the fixed plate, and the connecting pipe passes through the hole and is movably connected with the hole.
[0009] Preferably, a universal wheel is fixedly installed at the bottom of the base plate, a push rod is fixedly installed at the top of the base plate, a flow meter is installed on the connecting pipe, and a temperature detector is fixedly installed on the front of the fixed frame. The universal wheel is provided to facilitate the movement of the device, and a brake pad is provided on the universal wheel. The temperature detector can measure the cooling temperature of the central air-conditioning, and the flow meter can measure the air volume of the central air-conditioning. The energy efficiency ratio of the central air-conditioning can be obtained by multiplying the cooling capacity by the air volume and then dividing it by the rated power of the central air-conditioning.
[0010] Preferably, a clamping mechanism is provided on the outside of the connecting tube, and the clamping mechanism includes a slide groove, a connecting rod, a spring, a limit rod, and a clamping plate. The slide groove is opened on the top of the fixed plate, one end of the connecting rod is slidably connected to the inside of the slide groove, and the clamping plate is fixedly connected to the other end of the connecting rod. There are two clamping mechanisms, which are symmetrically arranged on the left and right sides of the connecting tube.
[0011] Preferably, the spring is arranged inside the slide groove, and the two ends are fixedly connected to the outer wall of the connecting rod and the inner wall of the slide groove respectively. The limit rod is fixedly connected to the top of the fixed plate, and passes through the connecting rod and is slidably connected to the connecting rod. By setting the spring, the splint can be driven to reset, and when the splint clamps the connecting pipe, the spring can provide a certain clamping force. By setting the limit rod, the connecting rod can move stably left and right.
[0012] Preferably, a connecting block 1 and a connecting block 2 are provided on the outside of the connecting pipe, the connecting block 1 is arranged on the top of the connecting block 2, the connecting block 1 and the connecting block 2 are movably connected with a fixing pin, the connecting block 1 is fixedly connected to the splint on the left side of the connecting pipe, and the connecting block 2 is fixedly connected to the splint on the right side of the connecting pipe, and after the connecting block 1 and the connecting block 2 are aligned, the fixing pin can be inserted to prevent the two splints from separating, so that the two form a circular sleeve to surround the connecting pipe.
[0013] Preferably, a magnet is fixedly mounted on the top of the limit rod, and the connecting rod is made of iron, so that when the splint is pulled away from the connecting tube, the connecting rod contacts the magnet and the two are adsorbed together, thereby achieving the purpose of fixing the splint without having to keep pulling the splint.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the utility model provides an air conditioner energy efficiency detection device, which has the following
[0016] Beneficial effects:
[0017] 1. An air conditioner energy efficiency testing device moves the device to a suitable position, passes the connecting pipe through the hole, supports the fixed frame with multiple L-shaped rods distributed in a circular array, aligns the fixed frame with the air outlet of the central air conditioner fan coil, starts the electric push rod to drive the fixed frame to move up and dock with the air outlet of the central air conditioner fan coil to form a sealing structure, and then energy efficiency testing can be performed without manual docking and protection stability, thereby improving the efficiency of testing.
[0018] 2. This air conditioner energy efficiency detection device further improves the stability of the connecting pipe by setting two clamps to clamp the connecting pipe. After the two clamps surround the connecting pipe, a fixing pin is used to pass through connecting block one and connecting block two to avoid separation of the two clamps and improve clamping stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0020] Figure 1 It is a schematic diagram of the structure of the utility model;
[0021] Figure 2 It is a structural schematic diagram of the clamping mechanism of the utility model;
[0022] Figure 3 It is an enlarged view of A of the utility model;
[0023] In the figure: 1. bottom plate; 2. fixed frame; 3. connecting pipe; 4. lifting mechanism; 41. electric push rod; 42. fixed plate; 43. L-shaped rod; 5. clamping mechanism; 51. slide groove; 52. connecting rod; 53. spring; 54. limit rod; 55. clamping plate; 6. connecting block 1; 7. connecting block 2; 8. magnet; 9. push rod; 10. universal wheel. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0025] Example 1
[0026] like Figure 1-3As shown, the utility model provides an air conditioner energy efficiency detection device, including a base plate 1, a fixed frame 2 is arranged above the base plate 1, a connecting pipe 3 is arranged at the bottom of the fixed frame 2, and a lifting mechanism 4 is arranged on the top of the base plate 1; the lifting mechanism 4 includes an electric push rod 41, a fixed plate 42 and an L-shaped rod 43, the electric push rod 41 is fixedly installed on the top of the base plate 1, the fixed plate 42 is fixedly installed on the output end of the electric push rod 41, a hole is opened in the center of the fixed plate 42, the L-shaped rod 43 is fixedly installed at the bottom of the fixed plate 42, and the connecting pipe 3 is arranged on the bottom of the fixed plate 42. It is movably connected with the holes through the holes, a universal wheel 10 is fixedly installed on the bottom of the base plate 1, a push rod 9 is fixedly installed on the top of the base plate 1, a flow meter is installed on the connecting pipe 3, and a temperature detector is fixedly installed on the front of the fixed frame 2. The universal wheel 10 is provided to facilitate the movement of the device. A brake pad is provided on the universal wheel 10. The temperature detector can measure the cooling temperature of the central air-conditioning, and the flow meter can measure the air volume of the central air-conditioning. The energy efficiency ratio of the central air-conditioning can be obtained by multiplying the cooling capacity by the air volume and then dividing it by the rated power of the central air-conditioning.
[0027] In this embodiment, the fixed frame 2 can form a sealing structure with the air outlet of the central air-conditioning fan coil, and the flow meter and the temperature detector can cooperate to detect energy efficiency. The above are all existing technologies and are not the main innovation points. Without further elaboration, the device is moved to a suitable position, the connecting pipe 3 is passed through the hole, and a plurality of L-shaped rods 43 distributed in a circular array support the fixed frame 2. The fixed frame 2 is aligned with the air outlet of the central air-conditioning fan coil, and the electric push rod 41 is started to drive the fixed frame 2 to move up and dock with the air outlet of the central air-conditioning fan coil to form a sealing structure. Energy efficiency testing can be performed without manual docking and protection stability, thereby improving the efficiency of testing.
[0028] Example 2
[0029] like Figure 1-3As shown, on the basis of Example 1, the utility model provides a technical solution: preferably, a clamping mechanism 5 is provided on the outside of the connecting pipe 3, and the clamping mechanism 5 includes a slide groove 51, a connecting rod 52, a spring 53, a limiting rod 54, and a clamping plate 55. The slide groove 51 is opened at the top of the fixed plate 42, one end of the connecting rod 52 is slidably connected to the inside of the slide groove 51, and the clamping plate 55 is fixedly connected to the other end of the connecting rod 52. There are two clamping mechanisms 5, which are symmetrically arranged on the left and right sides of the connecting pipe 3. The spring 53 is arranged in the inside of the slide groove 51, and the two ends are respectively fixedly connected to the outer wall of the connecting rod 52 and the inner wall of the slide groove 51, and the limiting rod 54 is fixedly connected to the top of the fixed plate 42 and passes through the connecting rod 52 and The connecting rod 52 is slidably connected, and the spring 53 can be set to drive the clamping plate 55 to reset, and when the clamping plate 55 clamps the connecting pipe 3, the spring 53 can provide a certain clamping force, and the limiting rod 54 is set to make the connecting rod 52 move left and right stably. A connecting block 1 6 and a connecting block 2 7 are set on the outside of the connecting pipe 3. The connecting block 1 6 is set on the top of the connecting block 2 7. The connecting block 1 6 and the connecting block 2 7 are movably connected with a fixing pin 13. The connecting block 1 6 is fixedly connected to the clamping plate 55 on the left side of the connecting pipe 3, and the connecting block 2 7 is fixedly connected to the clamping plate 55 on the right side of the connecting pipe 3. After the connecting block 1 6 and the connecting block 2 7 are aligned, the fixing pin 13 can be inserted to prevent the two clamping plates 55 from separating, so that the two form a circular sleeve to surround the connecting pipe 3.
[0030] In this embodiment, two clamps 55 are provided to clamp the connecting pipe 3 to further improve the stability of the connecting pipe 3. After the two clamps 55 surround the connecting pipe 3, a fixing pin is used to pass through the connecting block 1 6 and the connecting block 2 7 to prevent the two clamps 55 from separating, thereby improving the clamping stability.
[0031] Example 3
[0032] like Figure 1-3 As shown, based on Example 1, the utility model provides a technical solution: preferably, a magnet 8 is fixedly installed on the top of the limiting rod 54.
[0033] In this embodiment, the connecting rod 52 is made of iron, so when the splint 55 is pulled away from the connecting pipe 3, the connecting rod 52 contacts the magnet 8 and the two are adsorbed together, thereby achieving the purpose of fixing the splint 55 without having to keep pulling the splint 55.
[0034] The working principle of this air conditioner energy efficiency detection device is described in detail below.
[0035] like Figure 1-3As shown, when in use, by moving the device to a suitable position, passing the connecting pipe 3 through the hole, a plurality of L-shaped rods 43 distributed in a circular array support the fixed frame 2, aligning the fixed frame 2 with the air outlet of the central air-conditioning fan coil, starting the electric push rod 41 to drive the fixed frame 2 to move up and dock with the air outlet of the central air-conditioning fan coil to form a sealing structure, energy efficiency testing can be carried out without manual docking and protection stability, thereby improving the efficiency of testing; by setting two clamping plates 55 to clamp the connecting pipe 3, the stability of the connecting pipe 3 is further improved. After the two clamping plates 55 surround the connecting pipe 3, a fixing pin is used to pass through the connecting block 1 6 and the connecting block 2 7 to avoid separation of the two clamping plates 55 and improve the clamping stability.
Claims
1. An air conditioner energy efficiency detection device, comprising a base plate (1), characterized in that: A fixed frame (2) is arranged above the bottom plate (1), a connecting pipe (3) is arranged at the bottom of the fixed frame (2), and a lifting mechanism (4) is arranged at the top of the bottom plate (1); The lifting mechanism (4) comprises an electric push rod (41), a fixing plate (42) and an L-shaped rod (43); the electric push rod (41) is fixedly mounted on the top of the bottom plate (1); the fixing plate (42) is fixedly mounted on the output end of the electric push rod (41); a hole is provided at the center of the fixing plate (42); the L-shaped rod (43) is fixedly mounted on the bottom of the fixing plate (42); and the connecting pipe (3) passes through the hole and is movably connected to the hole.
2. The air conditioner energy efficiency detection device according to claim 1, characterized in that: A universal wheel (10) is fixedly mounted on the bottom of the base plate (1), a push rod (9) is fixedly mounted on the top of the base plate (1), a flow meter is mounted on the connecting pipe (3), and a temperature detector is fixedly mounted on the front of the fixed frame (2).
3. The air conditioner energy efficiency detection device according to claim 1, characterized in that: A clamping mechanism (5) is arranged outside the connecting pipe (3), and the clamping mechanism (5) comprises a slide groove (51), a connecting rod (52), a spring (53), a limiting rod (54), and a clamping plate (55). The slide groove (51) is opened on the top of the fixed plate (42), one end of the connecting rod (52) is slidably connected to the inside of the slide groove (51), and the clamping plate (55) is fixedly connected to the other end of the connecting rod (52).
4. The air conditioner energy efficiency detection device according to claim 3, characterized in that: The spring (53) is arranged inside the slide groove (51), and its two ends are respectively fixedly connected to the outer wall of the connecting rod (52) and the inner wall of the slide groove (51); the limiting rod (54) is fixedly connected to the top of the fixing plate (42), and passes through the connecting rod (52) and is slidably connected to the connecting rod (52).
5. The air conditioner energy efficiency detection device according to claim 3, characterized in that: The outside of the connecting pipe (3) is provided with a connecting block 1 (6) and a connecting block 2 (7), the connecting block 1 (6) is arranged on the top of the connecting block 2 (7), and the connecting block 1 (6) and the connecting block 2 (7) are movably connected with a fixing pin (13).
6. The air conditioner energy efficiency detection device according to claim 3, characterized in that: A magnet (8) is fixedly mounted on the top of the limiting rod (54).
Citation Information
Patent Citations
Central air conditioner energy efficiency detection device