Building engineering pipeline mounting structure
By designing a pipeline installation structure including support frame, support wheel, fixed frame, movable frame and clamping frame, the problems of high labor intensity and safety hazards during traditional pipeline installation are solved, and a more efficient pipeline installation process is achieved.
Patent Information
- Application Number
- CN202421347396.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-06-13
AI Technical Summary
When installing traditional pipelines, multiple staff members need to lift and move bulky pipelines, resulting in high labor intensity and safety hazards.
A construction engineering pipeline installation structure is designed, including a support frame, a rotary-installed support wheel, a fixing frame, a movable frame and a clamping frame. Through the mutual cooperation of these components, the pipe docking and installation are achieved.
There is no need to lift the moving pipe for docking and installation, which reduces the labor intensity of staff, makes the operation more convenient and quick, and improves the efficiency of pipeline installation.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a pipeline installation structure for construction engineering. Background Art
[0002] Construction engineering is a part of construction engineering. It refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. In the process of building, pipelines need to be installed. When installing pipelines, the construction engineering pipeline installation structure needs to be used.
[0003] In the prior art, there are the following problems:
[0004] During traditional pipeline installation, multiple pipelines need to be docked. During docking, the installation equipment is placed in a suitable position, and then personnel lift and move the pipe ports to the installation equipment, so that the installation equipment docks multiple pipes, thereby installing the pipes. Usually, pipelines in construction projects are relatively heavy. During pipeline installation, multiple workers are required to lift and move the pipelines, which increases the labor force of the workers and easily causes safety hazards. Utility Model Content
[0005] The purpose of the utility model is to provide a construction engineering pipeline installation structure to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering pipeline installation structure, including a support frame and support wheels rotatably installed on the front and rear sides of the support frame, two fixed frames are fixedly installed on the inner side of the support frame, and the two fixed frames are front-to-back corresponding to each other, and two movable frames are slidably installed on the inner side of the support frame, and the two movable frames are located on one side of the fixed frame and correspond to each other front-to-back, a first clamping frame is movably installed on the inner side of each of the fixed frames, and a second clamping frame is movably connected to the inner side of each of the movable frames.
[0007] By placing multiple pipes at the positions where they need to be installed, the ports of the pipes are aligned, by lifting the support frame and placing it on the outsides of the relative ports of two pipes, by driving the first clamping frame in the two fixed frames to move together, a port of one pipe is clamped and fixed, by driving the two second clamping frames to move together, the port of the other pipe is clamped and fixed, by pushing the movable frame to move to the left, the port of the other pipe is simultaneously driven to move to the left to dock with the port of the first pipe, there is no need to lift and move the pipes for docking and installation, the labor intensity of the staff is reduced, the operation is convenient and quick, and after the docking and installation is completed, the support frame can be easily pushed to move to the next pipe port for docking and installation using the support wheels and the ground rolling support, thereby improving the installation efficiency of the pipes during construction.
[0008] Preferably, a plurality of fixing rods are fixedly installed on the inner side of the support frame, and two handles are fixedly connected to the front and rear sides of the support frame. The fixing rods can improve the structural strength of the support frame and prevent the support frame from bending. The handles can be used to easily lift the support frame and push the support frame to move.
[0009] Preferably, two fixing plates are fixedly installed on the inner side of the support frame, the two fixing plates are respectively located on one side of the two movable frames, one side of the two fixing plates is fixedly connected to a first telescopic rod, and the output ends of the two first telescopic rods are respectively fixedly connected to the two movable frames. The fixing plate can support and fix one end of the first telescopic rod, so that the first telescopic rod can easily drive the movable frame to move left and right.
[0010] Preferably, two support rods are fixedly installed on the front and rear sides of the support frame, respectively, and the four support rods are respectively located on the outside of the fixed frame and the movable frame, and an inclined plate is fixedly connected between the top of each support rod and the support frame, and a support wheel is rotatably installed on the outside of each support rod. The support rod can support the support wheel and make the support wheel rotate at the same time, and the inclined plate can improve the structural strength of the support rod and prevent the support rod from bending upward.
[0011] Preferably, two slide bars are fixedly installed on the inner side of each of the fixed frame and the movable frame, and each of the two slide bars is located at the top and bottom of a first clamping frame or a second clamping frame, and two sliders are fixedly installed on the outer side of each of the first clamping frame and the second clamping frame, and each of the slide bars passes through a slider, and the sliders are slidably connected with the slide bars. When the first clamping frame and the second clamping frame move, the sliders are synchronously driven to move along the slide bars, and the first clamping frame and the second clamping frame can be prevented from bending when moving by the sliders moving along the slide bars.
[0012] Preferably, a sliding sleeve is fixedly installed on the top and bottom of each movable frame, the sliding sleeve is slidably connected to the support frame, a second telescopic rod is fixedly installed on the inner side of each fixed frame and movable frame, the output end of each second telescopic rod is fixedly connected to the first clamping frame or the second clamping frame, and an anti-skid pad is fixedly installed on the inner side of the first clamping frame and the second clamping frame. The sliding sleeve can make the movable frame slide left and right along the support frame, the second telescopic rod can drive the first clamping frame and the second clamping frame to move, and the anti-skid pad can prevent the pipe from sliding when clamping.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] By providing cooperation among a fixed frame, a movable frame and supporting wheels, and by placing a plurality of pipes at positions where they need to be installed, the ports of the pipes are aligned, and by lifting the supporting frame and placing it on the outsides of the relative ports of two pipes, the two first clamping frames are moved together by the fixed frame to clamp and fix the port of one pipe, and the two second clamping frames are moved together by the movable frame to clamp and fix the port of the other pipe, and by driving the movable frame to move to the left, the port of the other pipe is simultaneously driven to move to the left to dock with the port of the first pipe, and there is no need to lift and move the pipes for docking and installation, thereby reducing the labor intensity of the staff and making the operation convenient and quick, and by using the supporting wheels and the ground rolling support after the docking and installation is completed, the supporting frame can be conveniently pushed to move to the next pipe port for docking and installation, thereby improving the installation efficiency of the pipes during the construction of the building project. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0016] Figure 2 This is a schematic diagram of the support frame structure of the utility model;
[0017] Figure 3 It is a schematic diagram of the cutaway structure of the fixing frame of the utility model.
[0018] In the figure: 1, support frame; 2, fixed rod; 3, fixed plate; 4, handle; 5, support wheel; 6, fixed frame; 7, first clamping frame; 8, movable frame; 9, second clamping frame; 10, sliding sleeve; 11, first telescopic rod; 12, support rod; 13, inclined plate; 14, sliding rod; 15, sliding block; 16, second telescopic rod; 17, anti-slip pad. DETAILED DESCRIPTION
[0019] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
[0020] The utility model provides Figure 1-3 The construction engineering pipeline installation structure shown includes a support frame 1 and support wheels 5 rotatably installed on the front and rear sides of the support frame 1. Two fixed frames 6 are fixedly installed on the inner side of the support frame 1, and the two fixed frames 6 are front-to-back corresponding. Two movable frames 8 are slidably installed on the inner side of the support frame 1. The two movable frames 8 are located on one side of the fixed frame 6 and correspond front-to-back. A first clamping frame 7 is movably installed on the inner side of each fixed frame 6, and a second clamping frame 9 is movably connected to the inner side of each movable frame 8.
[0021] A plurality of fixing rods 2 are fixedly installed on the inner side of the support frame 1, and two handles 4 are fixedly connected to the front and rear sides of the support frame 1;
[0022] Two fixed plates 3 are fixedly installed on the inner side of the support frame 1. The two fixed plates 3 are respectively located on one side of the two movable frames 8. One side of the two fixed plates 3 is fixedly connected to a first telescopic rod 11. The output ends of the two first telescopic rods 11 are respectively fixedly connected to the two movable frames 8.
[0023] Two support rods 12 are fixedly installed on the front and rear sides of the support frame 1, respectively. The four support rods 12 are respectively located on the outside of the fixed frame 6 and the movable frame 8. An inclined plate 13 is fixedly connected between the top of each support rod 12 and the support frame 1. A support wheel 5 is rotatably installed on the outside of each support rod 12.
[0024] Two slide bars 14 are fixedly installed on the inner side of each fixed frame 6 and movable frame 8, and each two slide bars 14 are located at the top and bottom of a first clamping frame 7 or a second clamping frame 9. Two sliders 15 are fixedly installed on the outer side of each first clamping frame 7 and the second clamping frame 9, and each slide bar 14 passes through a slider 15, and the slider 15 is slidably connected with the slide bar 14;
[0025] A sliding sleeve 10 is fixedly installed on the top and bottom of each movable frame 8, and the sliding sleeve 10 is slidably connected to the support frame 1. A second telescopic rod 16 is fixedly installed on the inner side of each fixed frame 6 and the movable frame 8. The output end of each second telescopic rod 16 is fixedly connected to the first clamping frame 7 or the second clamping frame 9 respectively. Anti-slip pads 17 are fixedly installed on the inner sides of the first clamping frame 7 and the second clamping frame 9.
[0026] The working principle of the construction engineering pipeline installation structure according to the embodiment is as follows: by placing multiple pipelines at the positions where they need to be installed, the ports of the pipelines are aligned, the support frame 1 is lifted by the handle 4 and placed outside the opposite ports of two pipelines, and the second telescopic rod 16 in the fixing frame 6 is activated to extend the second telescopic rod 16, and the two first clamping frames 7 are pushed to move together, so as to clamp and fix the port of one pipeline;
[0027] By starting the second telescopic rod 16 in the movable frame 8, the two second clamping frames 9 are pushed to move together, and the port of another pipe is clamped and fixed. The slider 15 slides along the slide rod 14 to prevent the first clamping frame 7 and the second clamping frame 9 from being skewed during movement. The sliding sleeve 10 can facilitate the sliding of the movable frame 8 along the support frame 1.
[0028] Start the first telescopic rod 11 to extend the first telescopic rod 11, push the movable frame 8 to move left, and simultaneously drive the port of another pipe to move left to dock with the port of the first pipe. There is no need to lift and move the pipe for docking and installation, which reduces the labor intensity of the staff and is convenient and quick to operate. After the docking and installation are completed, the support frame 1 can be easily pushed to move to the next pipe port for docking and installation by using the support wheels 5 and the ground rolling support, thereby improving the installation efficiency of the pipes during construction projects.
[0029] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.
Claims
1. A construction engineering pipeline installation structure, comprising a support frame (1) and support wheels (5) rotatably mounted on the front and rear sides of the support frame (1), characterized in that: Two fixed frames (6) are fixedly installed on the inner side of the support frame (1), and the two fixed frames (6) correspond to each other front to back. Two movable frames (8) are slidably installed on the inner side of the support frame (1), and the two movable frames (8) are located on one side of the fixed frame (6) and correspond to each other front to back. A first clamping frame (7) is movably installed on the inner side of each fixed frame (6), and a second clamping frame (9) is movably connected to the inner side of each movable frame (8).
2. The construction engineering pipeline installation structure according to claim 1 is characterized in that: A plurality of fixing rods (2) are fixedly mounted on the inner side of the support frame (1), and two handles (4) are fixedly connected to the front and rear sides of the support frame (1).
3. The construction engineering pipeline installation structure according to claim 1 is characterized in that: Two fixed plates (3) are fixedly installed on the inner side of the support frame (1), and the two fixed plates (3) are respectively located on one side of the two movable frames (8). One side of the two fixed plates (3) is fixedly connected to a first telescopic rod (11), and the output ends of the two first telescopic rods (11) are respectively fixedly connected to the two movable frames (8).
4. The construction engineering pipeline installation structure according to claim 1 is characterized in that: Two support rods (12) are fixedly mounted on the front and rear sides of the support frame (1), respectively. The four support rods (12) are respectively located on the outside of the fixed frame (6) and the movable frame (8). An inclined plate (13) is fixedly connected between the top of each support rod (12) and the support frame (1), and a support wheel (5) is rotatably mounted on the outside of each support rod (12).
5. The construction engineering pipeline installation structure according to claim 1 is characterized in that: Two sliding bars (14) are fixedly installed on the inner side of each of the fixed frame (6) and the movable frame (8), and each of the two sliding bars (14) is located at the top and bottom of a first clamping frame (7) or a second clamping frame (9). Two sliding blocks (15) are fixedly installed on the outer side of each of the first clamping frame (7) and the second clamping frame (9), and each of the sliding bars (14) passes through a sliding block (15), and the sliding block (15) is slidably connected to the sliding bar (14).
6. The construction engineering pipeline installation structure according to claim 1, characterized in that: A sliding sleeve (10) is fixedly installed on the top and bottom of each movable frame (8), and the sliding sleeve (10) is slidably connected to the support frame (1). A second telescopic rod (16) is fixedly installed on the inner side of each fixed frame (6) and the movable frame (8), and the output end of each second telescopic rod (16) is fixedly connected to the first clamping frame (7) or the second clamping frame (9), respectively. Anti-slip pads (17) are fixedly installed on the inner sides of the first clamping frame (7) and the second clamping frame (9).