Road surface crack pouring device for road maintenance

By introducing a stirring mechanism into the pavement seam filling device, the bubbles in the asphalt are discharged, which solves the problem that bubbles cannot be discharged in the prior art, and improves the quality and efficiency of the seam filling.

CN222541246UActive Publication Date: 2025-02-28合肥市治超人员管理站
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421250979.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-02-28
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

The existing pavement seam filling device cannot be effectively discharged when the asphalt is heated and dissolved, resulting in poor crack filling and affecting the quality of the seam filling.

Method used

A highway maintenance pavement seam filling device is designed, including a stirring mechanism, which stirs the asphalt flowing into the hopper through the mixing head, discharges air bubbles, and ensures that the asphalt enters the cracks through the width limiting assembly and the flow guide groove.

Benefits of technology

By ejecting bubbles in the asphalt, the quality and compactness of the filling joints are improved, and the fluidity of the asphalt is increased and the efficiency of the filling joints is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222541246U_ABST
    Figure CN222541246U_ABST
Patent Text Reader

Abstract

A road surface crack pouring device for road maintenance comprises a frame which drives other parts to move in the crack direction, and further comprises an asphalt box which is erected on the frame; the flow guide mechanism is communicated with the asphalt tank; the width limiting assembly is attached to the side wall of the pavement crack, and asphalt enters the crack through the width limiting assembly; the stirring mechanism is used for stirring the asphalt of the flow guide mechanism; the lifting mechanism is connected with the stirring mechanism, and the lifting mechanism drives the stirring mechanism to vertically move. Asphalt flowing into the receiving hopper is stirred through rotation of the stirring head, bubbles in the asphalt are discharged, the probability that the bubbles are wrapped in crack asphalt is reduced, the crack pouring quality is improved, meanwhile, the fluidity of the asphalt is improved through stirring, the asphalt rapidly enters cracks, and the crack pouring efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway maintenance, and more specifically, particularly to a highway maintenance pavement crack filling device. Background Art

[0002] Asphalt pavement cracks are one of the major early diseases of asphalt pavement that are most likely to cause other diseases under heavy traffic. Effective measures need to be taken for preventive maintenance and repair, otherwise it will cause damage to a larger area of ​​the road.

[0003] Existing pavement grouting devices all dissolve asphalt and directly inject it into the cracks through pipes. In this way, some bubbles generated when the asphalt is heated and dissolved cannot be discharged, resulting in incomplete filling of the cracks and affecting the quality of the grouting. Utility Model Content

[0004] In order to overcome the above-mentioned shortcomings, the utility model aims to provide a road maintenance pavement crack filling device, which can discharge bubbles through stirring to fill the cracks densely.

[0005] A road maintenance pavement grouting device comprises a frame and also includes: an asphalt box, which is mounted on the frame; a diversion mechanism, which is connected to the asphalt box; a width limiting component, which is in contact with the side wall of a road crack and asphalt enters the crack through the width limiting component; a stirring mechanism, which stirs the asphalt in the diversion mechanism; and a lifting mechanism, which is connected to the stirring mechanism and drives the stirring mechanism to move.

[0006] Furthermore, the diversion mechanism includes a drainage pipe, a receiving hopper and a diversion groove, the drainage pipe connects the asphalt tank and the receiving hopper, the receiving hopper is an inverted cone, and the bottom of the receiving hopper is fixedly connected to the diversion groove.

[0007] Furthermore, two supporting wheels are provided at the bottom of the guide groove, and the distance between the supporting wheels is greater than the width of the crack.

[0008] Furthermore, the width limiting component includes a track rod, two movable plates, a spring cavity and a tension spring, the track rod is fixedly connected to the top of the front end of the guide groove, the top of the movable plate is slidably connected to the track rod, the spring cavity is arranged on both sides of the track rod, and the tension spring connects the top of the movable plate and the spring cavity.

[0009] Furthermore, a triangular pyramid block is provided at the bottom of the movable plate, a guard plate is fixedly connected to the side wall of the movable plate, and the bottom of the guard plate is located above the triangular pyramid block.

[0010] Furthermore, the stirring mechanism includes a stirring head, a transmission rod and a motor, and the transmission rod connects the top of the stirring head and the output end of the motor.

[0011] Furthermore, the outer diameters at both ends of the stirring head are smaller than the outer diameter in the middle of the stirring head, and a plurality of stirring blades are fixedly connected to the side wall of the stirring head.

[0012] Furthermore, the lifting mechanism includes a track plate, a lifting plate, a rotating shaft plate and a threaded rod, the track plate is fixedly connected to the side wall of the asphalt box, the lifting plate is slidably connected to the lifting plate, the motor is connected to the bottom of the lifting plate, the rotating shaft plate is fixedly connected to the side wall of the track plate, and the threaded rod passes through the lifting plate and is rotatably connected to the rotating shaft plate.

[0013] Furthermore, two slide rails are protruded from the side wall of the track plate, and two recesses are provided at the rear end of the lifting plate, and the recesses are slidably connected to the slide rails.

[0014] Furthermore, a connecting rod passes through the bottom of the track plate, one end of the connecting rod is fixedly connected to the bottom of the guide groove, and the other end of the connecting rod is provided with a smoothing wheel.

[0015] Compared with the prior art, the beneficial effects of the utility model are:

[0016] ① The asphalt flowing into the receiving hopper is stirred by rotating the stirring head to discharge the bubbles in the asphalt, reduce the probability of bubbles being wrapped in the cracked asphalt, and improve the quality of the grouting. At the same time, the fluidity of the asphalt is increased by stirring, so that the asphalt can quickly enter the cracks and increase the efficiency of the grouting. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0018] Figure 1 The present invention is a schematic diagram of the overall structure of a road maintenance pavement crack filling device.

[0019] Figure 2 The present invention is a schematic diagram of a width limiting mechanism in a road maintenance pavement grouting device.

[0020] Figure 3 The present invention is a schematic diagram of a mixing structure and a lifting mechanism in a road maintenance pavement grouting device.

[0021] In the figure: 1. frame; 2. asphalt box; 3. guide mechanism; 31. drainage pipe; 311. valve; 32. receiving hopper; 33. guide trough; 331. support wheel; 4. width limiting component; 41. track rod; 42. moving plate; 421. triangular pyramid block; 422. guard plate; 43. spring chamber; 44. tension spring; 5. stirring mechanism; 51. stirring head; 52. transmission rod; 53. motor; 6. lifting mechanism; 61. track plate; 611. slide rail; 62. lifting plate; 63. rotating shaft plate; 64. threaded rod; 641. handle; 7. connecting rod; 8. smoothing wheel. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] like Figure 1 As shown, a road maintenance pavement grouting device includes a frame 1, which drives other components to move along the crack direction, and also includes: an asphalt box 2, which is mounted on the frame 1; a diversion mechanism 3, which is connected to the asphalt box 2; a width limiting component 4, which is in contact with the side wall of the road crack, and asphalt enters the crack through the width limiting component 4; a stirring mechanism 5, which stirs the asphalt of the diversion mechanism 3; a lifting mechanism 6, which is connected to the stirring mechanism 5, and the lifting mechanism 6 drives the stirring mechanism 5 to move vertically.

[0024] The diversion mechanism 3 includes a drainage pipe 31, a receiving hopper 32 and a diversion groove 33. The drainage pipe 31 connects the asphalt tank 2 and the receiving hopper 32. A valve 311 is provided on the drainage pipe 31. The valve 311 is opened and closed to control whether the asphalt can pass through the drainage pipe 31 and enter the receiving hopper 32. The receiving hopper 32 is an inverted cone. The upper area of ​​the receiving hopper 32 is larger than the bottom area. The bottom of the receiving hopper 32 is fixedly connected to the diversion groove 33. The asphalt flows from the bottom of the receiving hopper 32 into the diversion groove 33. The diversion groove 33 is inclined toward the direction of the cracks in the road. The asphalt flows along the diversion groove 33 toward the cracks. The state of the asphalt can be observed when the asphalt passes through the diversion groove 33. If the asphalt has poor fluidity or condensation, it can be discovered and adjusted in time.

[0025] Two support wheels 331 are provided at the bottom of the guide groove 33. The distance between the support wheels 331 is greater than the width of the crack. The support wheels 331 assist the movement of the guide groove 33. At the same time, the support wheels 331 can enhance the bearing capacity of the guide groove 33 and make the guide groove 33 more stable.

[0026] like Figure 2As shown, the width limiting component 4 is located at the front end of the guide groove 33, and the asphalt flows into the crack through the width limiting component 4. The width limiting component 4 prevents the asphalt from flowing out. The width limiting component 4 includes a track rod 41, two movable plates 42, a spring cavity 43 and a tension spring 44. The front end opening of the guide groove 33 shrinks toward the middle. The track rod 41 is fixed to the top of the front end of the guide groove 33. The bottom of the track rod 41 has an inner concave to form a slideway. The top of the movable plate 42 is slidably connected to the track rod 41. The spring cavity 43 is arranged on both sides of the track rod 41. The tension spring 44 connects the movable plate 42. The top and spring cavity 43, when the tension spring 44 is in a normal state, the two movable plates 42 are at the two ends of the track rod 41, and a triangular pyramid block 421 is provided at the bottom of the movable plate 42. Before grouting, the two movable plates 42 are pulled toward the middle, and the bottom of the triangular pyramid block 421 is placed into the crack. Under the tension of the tension spring 44, the two movable plates 42 move to both sides, and the side walls of the movable plates 42 fit into the crack, thus ensuring that all the asphalt can flow into the crack, reducing the waste of asphalt and preventing the asphalt from being scattered in other places on the road and affecting the appearance.

[0027] A guard plate 422 is fixedly connected to the side wall of the movable plate 42. The guard plate 422 is perpendicular to the movable plate 42. The bottom of the guard plate 422 is located above the triangular pyramid block 421. The guard plate 422 will not enter the crack. When the movable plate 42 moves toward the middle of the guide groove 33, the guard plate 422 covers the gap between the movable plate 42 and the side wall of the guide groove 33, so that the asphalt can only flow out from between the two movable plates 42.

[0028] like Figure 3 As shown, the stirring mechanism 5 includes a stirring head 51, a transmission rod 52 and a motor 53. The transmission rod 52 connects the top of the stirring head 51 and the output end of the motor 53. After the motor 53 is started, the motor 53 drives the transmission rod 52 and the stirring head 51 to rotate together. The asphalt flowing into the receiving hopper 32 is stirred by the rotation of the stirring head 51, so that the bubbles in the asphalt are discharged, reducing the probability of bubbles being wrapped in the cracked asphalt, improving the quality of the grouting, and at the same time increasing the fluidity of the asphalt through stirring, so that the asphalt can quickly enter the cracks and increase the efficiency of the grouting.

[0029] The outer diameters at both ends of the stirring head 51 are smaller than the outer diameter in the middle of the stirring head 51. A number of stirring blades are fixedly connected to the side walls of the stirring head 51. The stirring head 51 protruding in the middle prevents the asphalt from moving toward the receiving hopper 32. When the stirring head 51 moves downward, the asphalt discharge speed slows down. When the stirring head 51 moves upward, the asphalt discharge speeds up. The position of the stirring head 51 is controlled by the lifting mechanism 6.

[0030] The lifting mechanism 6 includes a track plate 61, a lifting plate 62, a rotating shaft plate 63 and a threaded rod 64. The track plate 61 is welded to the side wall of the asphalt box 2, the track plate 61 is vertically arranged, the lifting plate 62 is slidably connected to the lifting plate 62, and a motor 53 is connected to the bottom of the lifting plate 62. The lifting plate 62 drives the motor 53 to move, and further drives the stirring head 51 to move up and down. The rotating shaft plate 63 is welded to the side wall of the track plate 61, the threaded rod 64 penetrates the lifting plate 62 and is rotatably connected to the rotating shaft plate 63, the threaded rod 64 is screwed to the lifting plate 62, and a handle 641 is provided on the top of the threaded rod 64, and the threaded rod 64 is rotated by the handle 641.

[0031] Two slide rails 611 are protruding from the side wall of the track plate 61, and two recesses are provided at the rear end of the lifting plate 62, which are slidably connected to the slide rails 611. When the stirring head 51 needs to be raised or lowered, the handle 641 is turned to drive the lifting plate 62 to move, and the slide rails 611 limit the left and right rotation of the grooves, further limiting the lifting plate 62 to only vertical movement.

[0032] A connecting rod 7 is passed through the bottom of the track plate 61, one end of the connecting rod 7 is fixedly connected to the bottom of the guide groove 33, and the other end of the connecting rod 7 is provided with a smoothing wheel 8. After the asphalt is filled, the asphalt is flattened with the road surface by rolling the smoothing wheel 8.

[0033] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A road maintenance pavement caulking device, comprising a frame (1), characterized in that: Also includes: An asphalt tank (2), the asphalt tank (2) being mounted on the vehicle frame (1); A flow guiding mechanism (3), the flow guiding mechanism (3) being in communication with the asphalt tank (2); A width limiting component (4), wherein the width limiting component (4) is in contact with a side wall of a road crack, and asphalt enters the crack through the width limiting component (4); A stirring mechanism (5), wherein the stirring mechanism (5) stirs the asphalt in the diversion mechanism (3); A lifting mechanism (6), wherein the lifting mechanism (6) is connected to the stirring mechanism (5), and the lifting mechanism (6) drives the stirring mechanism (5) to move.

2. A road maintenance pavement caulking device according to claim 1, characterized in that: The flow guiding mechanism (3) comprises a flow guiding pipe (31), a receiving hopper (32) and a flow guiding groove (33); the flow guiding pipe (31) is connected with the asphalt tank (2) and the receiving hopper (32); the receiving hopper (32) is in an inverted cone shape; the bottom of the receiving hopper (32) is fixedly connected to the flow guiding groove (33).

3. A road maintenance pavement caulking device according to claim 2, characterized in that: Two supporting wheels (331) are provided at the bottom of the guide groove (33), and the distance between the supporting wheels (331) is greater than the width of the crack.

4. A road maintenance pavement grouting device according to claim 3, characterized in that: The width limiting component (4) comprises a track rod (41), two movable plates (42), a spring cavity (43) and a tension spring (44); the track rod (41) is fixedly connected to the top of the front end of the guide groove (33); the top of the movable plate (42) is slidably connected to the track rod (41); the spring cavity (43) is arranged on both sides of the track rod (41); and the tension spring (44) connects the top of the movable plate (42) and the spring cavity (43).

5. A road maintenance pavement caulking device according to claim 4, characterized in that: A triangular pyramid block (421) is provided at the bottom of the movable plate (42), a guard plate (422) is fixedly connected to the side wall of the movable plate (42), and the bottom of the guard plate (422) is located above the triangular pyramid block (421).

6. A road maintenance pavement caulking device according to claim 5, characterized in that: The stirring mechanism (5) comprises a stirring head (51), a transmission rod (52) and a motor (53), wherein the transmission rod (52) connects the top of the stirring head (51) and the output end of the motor (53).

7. A road maintenance pavement caulking device according to claim 6, characterized in that: The outer diameters at both ends of the stirring head (51) are smaller than the outer diameter in the middle of the stirring head (51), and a plurality of stirring blades are fixedly connected to the side wall of the stirring head (51).

8. A road maintenance pavement caulking device according to claim 7, characterized in that: The lifting mechanism (6) comprises a track plate (61), a lifting plate (62), a rotating shaft plate (63) and a threaded rod (64); the track plate (61) is fixedly connected to the side wall of the asphalt box (2); the lifting plate (62) is slidably connected to the lifting plate (62); the bottom of the lifting plate (62) is connected to the motor (53); the rotating shaft plate (63) is fixedly connected to the side wall of the track plate (61); and the threaded rod (64) passes through the lifting plate (62) and is rotatably connected to the rotating shaft plate (63).

9. A road maintenance pavement caulking device according to claim 8, characterized in that: The side wall of the track plate (61) is protruded with two slide rails (611), and the rear end of the lifting plate (62) is provided with two recesses, and the recesses are slidably connected to the slide rails (611).

10. A road maintenance pavement caulking device according to claim 9, characterized in that: A connecting rod (7) passes through the bottom of the track plate (61), one end of the connecting rod (7) is fixed to the bottom of the guide groove (33), and the other end of the connecting rod (7) is provided with a smoothing wheel (8).