High-rise building pipeline support assembly
By designing a high-rise building pipeline support assembly including an installation mechanism and a support mechanism, the problems of low adjustability and poor adaptability in the prior art are solved, stable installation and efficient fixation of the pipeline body are achieved, and the adaptability and stability of the components are improved.
Patent Information
- Application Number
- CN202520094914.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2035-01-15
AI Technical Summary
The existing high-rise building pipeline bracket components have low adjustability, and the specifications of bracket components need to be measured and formulated during installation, and the adaptability is poor.
A high-rise building pipeline bracket assembly is designed including an installation mechanism and a support mechanism. The installation mechanism adopts the two-end limit and upper and lower limits, and the pipe body is carefully adjusted and held by the limiting plate, positioning nut, support pad and clamping pad. The support mechanism adopts double-end support and triangular support, and the components are fixed and installed on the top of the building through collars, pillars, struts and fixing screws.
It realizes stable installation and efficient fixation of the pipeline body, improves the adaptability and stability of the bracket assembly, and ensures the safety and reliability of the pipeline system.
Smart Images

Figure CN222543226U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline supports, in particular to a pipeline support component for a high-rise building. Background Art
[0002] A high-rise building refers to a building whose height far exceeds that of a conventional multi-story building. Specifically, it usually refers to a residential building with a height greater than 27 meters and a non-single-story factory building, warehouse and other civil buildings with a height greater than 24 meters. High-rise buildings are an important part of the city due to their height and number of floors. They are characterized by high efficiency, high land utilization rate and conservation of land resources. When designing high-rise buildings, it is necessary to consider multiple factors such as structural safety, earthquake resistance, fire escape, ventilation and lighting to ensure the safety, comfort and environmental protection and energy saving of living and use. Pipeline supports are a key fixing and supporting structure used to ensure the stability and safety of pipelines, cables and other pipeline systems during installation and operation. These supports are usually made of metal, plastic, composite materials, etc., and are designed in different forms and specifications according to specific uses and environmental conditions. The functions of pipeline supports include bearing the dead weight of pipelines, resisting external loads, absorbing stress caused by thermal expansion, and maintaining the correct position and direction of pipelines.
[0003] The patent document with the patent authorization announcement number CN218783494U discloses a pipeline suspension bracket for construction engineering, which "includes a suspension bracket assembly and a use structure, the use structure includes a sliding plate, a fixed cylinder, a movable adjustment column, and a connecting long rod; the sliding plates are evenly distributed on the suspension bracket assembly, one end of the fixed cylinder is fixedly connected to the top of the sliding plate, the bottom end of the movable adjustment column passes through the top of the fixed cylinder and extends to the inside, the top of the movable adjustment column is fixedly connected to a connecting suspension block, and the sliding plate is slidably connected to the sliding groove adapted thereto, By adjusting the distance between the fixed cylinder and the movable adjustment column according to the height used, the bolts matching the threaded hole A are immediately used for threaded connection and tightening after adjustment, and then the bolts matching the threaded hole B are used for threaded connection with the top plate to tighten the ceiling, thereby achieving the effect of rapid assembly. "Based on the search of the above patents and in combination with the high-rise building pipeline support components in the prior art, it is found that the existing support components are often bolt-fixed structures with low adjustability, especially when installing, the specifications of the support components need to be measured and formulated, and the adaptability is low;
[0004] Based on this, the utility model designs a high-rise building pipeline support assembly to solve the above problems. Utility Model Content
[0005] The purpose of the utility model is to provide a pipeline support assembly for a high-rise building to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a high-rise building pipeline support assembly, comprising a support rod, a pipeline body is arranged above the support rod, a mounting mechanism is arranged on the outer side of the pipeline body, support mechanisms are arranged on the left and right sides of the mounting mechanism, the mounting mechanism comprises a first threaded rod, a second threaded rod, a first limit plate, a positioning nut and a second limit plate, a first threaded rod is arranged below the pipeline body, a second threaded rod is arranged above the pipeline body, a first limit plate is arranged on the right side of the pipeline body, a second limit plate is arranged on the left side of the pipeline body, positioning nuts are arranged on the left and right sides of the first limit plate and the second limit plate, a plurality of the positioning nuts are installed on the first threaded rod and the second threaded rod, the support mechanism comprises a first ring and a first pillar, the first ring is fixedly installed on the right end of the support rod, and the first pillar is fixedly installed on the upper end of the first ring.
[0007] Optionally, the mounting mechanism further includes a first supporting pad and a first clamping rubber pad, the first supporting pad is fixedly mounted on the middle portion of the first limiting plate, and the first clamping rubber pad is fixedly mounted on the middle portion of the first supporting pad.
[0008] Optionally, the upper end of the first support pad is threadedly connected to a first pitch-adjusting screw, and the lower end of the first support pad is threadedly connected to a second pitch-adjusting screw.
[0009] Optionally, a second supporting pad is fixedly installed in the middle of the second limiting plate, and a second clamping rubber pad is fixedly installed in the middle of the second supporting pad.
[0010] Optionally, the upper end of the second support pad is threadedly connected to a third pitch-adjusting screw, and the lower end of the second support pad is threadedly connected to a fourth pitch-adjusting screw.
[0011] Optionally, the supporting mechanism further includes a first support rod and a first fixing screw, the first support rod is fixedly mounted on the outer wall of the first support column, and the first fixing screw is mounted on the upper end of the first support rod.
[0012] Optionally, a second ring is fixedly mounted on the left end of the support rod, and a second support column is fixedly mounted on the upper end of the second ring.
[0013] Optionally, a second support rod is fixedly mounted on the outer wall of the second support column, and a second fixing screw is mounted on the upper end of the second support rod.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. In the utility model, an installation mechanism is provided. The installation mechanism adopts the method of limiting at both ends and limiting at the upper and lower ends. It can be finely adjusted according to the diameter of the pipe body, and then the pipe body can be effectively limited and clamped. The limiting plate limits the double ends of the pipe body, and the supporting pad and the clamping rubber pad support the upper and lower sides of the pipe body, so as to effectively fix the pipe body and ensure the installation stability of the pipe body.
[0016] 2. In the utility model, a supporting mechanism is provided. The supporting mechanism adopts a double-end support and a triangular support method, and the component can be fixedly installed on the top of the building as a whole. The triangular support method can provide effective stability and effectively improve the stability of the pipeline body supported by the component. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model in a three-dimensional front view;
[0018] Figure 2 It is a schematic structural diagram of the utility model in a plane front view;
[0019] Figure 3 This is a schematic diagram of the structure of the utility model when viewed from above;
[0020] Figure 4 The structure of the utility model is schematically shown in a three-dimensional cutaway view. Figure 1 ;
[0021] Figure 5 It is a schematic diagram of the structure of the utility model from a plan view;
[0022] Figure 6 The structure of the utility model is schematically shown in a three-dimensional cutaway view. Figure 2 ;
[0023] Figure 7 For this utility model Figure 6 A schematic diagram of the structure at the center showing a three-dimensional magnification;
[0024] Figure 8 It is a schematic diagram of the structure of the utility model in a three-dimensional top view.
[0025] In the figure: 1. support rod; 2. pipe body; 3. installation mechanism; 301. first threaded rod; 302. second threaded rod; 303. first limit plate; 304. positioning nut; 305. second limit plate; 306. first support pad; 307. first clamping rubber pad; 308. first pitch-adjusting screw; 309. second pitch-adjusting screw; 310. second support pad; 311. second clamping rubber pad; 312. third pitch-adjusting screw; 313. fourth pitch-adjusting screw; 4. supporting mechanism; 401. first collar; 402. first pillar; 403. first support rod; 404. first fixing screw; 405. second collar; 406. second pillar; 407. second support rod; 408. second fixing screw. DETAILED DESCRIPTION
[0026] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] See also Figures 1 to 8 In an embodiment of the utility model, a pipeline support assembly for a high-rise building includes a support rod 1, a pipeline body 2 is arranged above the support rod 1, a mounting mechanism 3 is arranged on the outside of the pipeline body 2, and support mechanisms 4 are arranged on the left and right sides of the mounting mechanism 3. The mounting mechanism 3 includes a first threaded rod 301, a second threaded rod 302, a first limiting plate 303, a positioning nut 304 and a second limiting plate 305. The first threaded rod 301 is arranged below the pipeline body 2, the second threaded rod 302 is arranged above the pipeline body 2, the first limiting plate 303 is arranged on the right side of the pipeline body 2, and the second limiting plate 305 is arranged on the left side of the pipeline body 2. Positioning nuts 304 are arranged on the left and right sides of the first limiting plate 303 and the second limiting plate 305. A plurality of positioning nuts 304 are installed on the first threaded rod 301, the second threaded rod 302, the first limiting plate 303, the positioning nut 304 and the second limiting plate 305. The threaded rod 301 and the second threaded rod 302, the mounting mechanism 3 also includes a first support pad 306 and a first clamping rubber pad 307, the first support pad 306 is fixedly mounted in the middle of the first limiting plate 303, the first clamping rubber pad 307 is fixedly mounted in the middle of the first supporting pad 306, the upper end of the first supporting pad 306 is threadedly connected with a first pitch-adjusting screw 308, the lower end of the first supporting pad 306 is threadedly connected with a second pitch-adjusting screw 309, the middle part of the second limiting plate 305 is fixedly mounted with a second support pad 310, the middle part of the second supporting pad 310 is fixedly mounted with a second clamping rubber pad 311, the upper end of the second supporting pad 310 is threadedly connected with a third pitch-adjusting screw 312, and the lower end of the second supporting pad 310 is threadedly connected with a fourth pitch-adjusting screw 313;
[0030] See also Figure 6 and Figure 7 When the installation mechanism 3 is initially used, the pipe body 2 is first placed between the first limit plate 303 and the second limit plate 305, and then the positioning nut 304 is adjusted so that the first limit plate 303 and the second limit plate 305 are close to each other and clamp the pipe body 2, and then the first adjustment screw 308 is screwed to adjust the upper part of the first clamping rubber pad 307, and then the second adjustment screw 309 is screwed to adjust the lower part of the first clamping rubber pad 307, so that the first clamping rubber pad 307 is tightly fitted and clamped to the pipe body 2. Similarly, the third adjustment screw 312 is screwed to adjust the upper part of the second clamping rubber pad 311, and then the fourth adjustment screw 313 is screwed to adjust the lower part of the second clamping rubber pad 311, so that the second clamping rubber pad 311 is tightly fitted and clamped to the pipe body 2. According to the above operation, multiple pipe bodies 2 can be clamped to achieve an adjustable clamping effect.
[0031] The installation mechanism 3 adopts the method of limiting at both ends and limiting at the upper and lower ends, which can be finely adjusted according to the diameter of the pipe body 2, and then the pipe body 2 is effectively limited and clamped. The limiting plate limits the two ends of the pipe body 2, and the supporting pad and the clamping rubber pad support the upper and lower sides of the pipe body 2, so as to effectively fix the pipe body 2 and ensure the installation stability of the pipe body 2.
[0032] The supporting mechanism 4 includes a first ring 401 and a first pillar 402. The first ring 401 is fixedly installed on the right end of the supporting rod 1, and the first pillar 402 is fixedly installed on the upper end of the first ring 401. The supporting mechanism 4 also includes a first support rod 403 and a first fixing screw 404. The first support rod 403 is fixedly installed on the outer wall of the first pillar 402, and the first fixing screw 404 is installed on the upper end of the first support rod 403. The second ring 405 is fixedly installed on the left end of the supporting rod 1, and the second pillar 406 is fixedly installed on the upper end of the second ring 405. The second support rod 407 is fixedly installed on the outer wall of the second pillar 406, and the second fixing screw 408 is installed on the upper end of the second support rod 407.
[0033] See also Figure 8 The supporting mechanism 4 adopts a triangular supporting structure, and the component can be installed on the building as a whole. When in use, the component can be fixedly installed in the designated area by a plurality of first fixing screws 404 and second fixing screws 408;
[0034] Among them, the support mechanism 4 adopts the double-end support and triangular support method, which can fix the entire assembly on the top of the building. The triangular support method can provide effective stability and effectively improve the stability of the assembly supporting the pipeline body 2;
[0035] The working principle of the utility model is as follows: first, the installation mechanism 3 adopts the method of limiting at both ends and limiting at the upper and lower ends, and the first limiting plate 303 and the second limiting plate 305 are used to limit the pipe body 2 at both ends, and at the same time, the support plate and the clamping rubber pad support the upper and lower sides of the pipe body 2, and the positioning nut 304 is adjusted to make the first limiting plate 303 and the second limiting plate 305 close to each other and clamp the pipe body 2, and then the upper and lower parts of the first clamping rubber pad 307 are adjusted by screwing the first adjusting screw 308 and the second adjusting screw 309, and the upper and lower parts of the second clamping rubber pad 311 are adjusted by screwing the third adjusting screw 312 and the fourth adjusting screw 313, so as to achieve an adjustable clamping effect, effectively fix the pipe body 2, ensure its installation stability, and at the same time, support Mechanism 4 adopts a triangular support structure, and the component is fixedly installed on the top of the building as a whole through the right side support structure composed of the first ring 401, the first pillar 402, the first strut 403 and the first fixing screw 404, and the left side support structure composed of the second ring 405, the second pillar 406, the second strut 407 and the second fixing screw 408. The triangular support method provides effective stability and further improves the stability of the pipeline body 2 supported by the component. Combining the above design and operation, this high-rise building pipeline support component can be finely adjusted according to the diameter of the pipeline body 2 to achieve effective limit clamping operation. At the same time, the component is fixedly installed on the building as a whole through double-end support and triangular support, thereby improving the installation stability and safety of the pipeline body 2.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pipeline support assembly for a high-rise building, comprising a support rod (1), a pipeline body (2) being arranged above the support rod (1), characterized in that: The outer side of the pipeline body (2) is provided with a mounting mechanism (3), and the left and right sides of the mounting mechanism (3) are both provided with supporting mechanisms (4), and the mounting mechanism (3) comprises a first threaded rod (301), a second threaded rod (302), a first limit plate (303), a positioning nut (304) and a second limit plate (305), the first threaded rod (301) is provided below the pipeline body (2), the second threaded rod (302) is provided above the pipeline body (2), the first limit plate (303) is provided on the right side of the pipeline body (2), and the second threaded rod (302) is provided on the right side of the pipeline body (2). A second limiting plate (305) is arranged on the left side of the pipeline body (2); positioning nuts (304) are arranged on the left and right sides of the first limiting plate (303) and the second limiting plate (305); a plurality of the positioning nuts (304) are mounted on the first threaded rod (301) and the second threaded rod (302); the supporting mechanism (4) comprises a first ring (401) and a first pillar (402); the first ring (401) is fixedly mounted on the right end of the supporting rod (1); and the first pillar (402) is fixedly mounted on the upper end of the first ring (401).
2. A high-rise building pipeline support assembly according to claim 1, characterized in that: The mounting mechanism (3) further comprises a first supporting pad (306) and a first clamping rubber pad (307); the first supporting pad (306) is fixedly mounted in the middle of the first limiting plate (303); and the first clamping rubber pad (307) is fixedly mounted in the middle of the first supporting pad (306).
3. A high-rise building pipeline support assembly according to claim 2, characterized in that: The upper end of the first support pad (306) is threadedly connected to a first pitch-adjusting screw (308), and the lower end of the first support pad (306) is threadedly connected to a second pitch-adjusting screw (309).
4. A high-rise building pipeline support assembly according to claim 1, characterized in that: A second support pad (310) is fixedly mounted in the middle of the second limiting plate (305), and a second clamping rubber pad (311) is fixedly mounted in the middle of the second support pad (310).
5. A high-rise building pipeline support assembly according to claim 4, characterized in that: The upper end of the second support pad (310) is threadedly connected to a third pitch-adjusting screw (312), and the lower end of the second support pad (310) is threadedly connected to a fourth pitch-adjusting screw (313).
6. A high-rise building pipeline support assembly according to claim 1, characterized in that: The supporting mechanism (4) further comprises a first support rod (403) and a first fixing screw (404); the first support rod (403) is fixedly mounted on the outer wall of the first support column (402); and the first fixing screw (404) is mounted on the upper end of the first support rod (403).
7. A high-rise building pipeline support assembly according to claim 1, characterized in that: A second ring (405) is fixedly mounted on the left end of the support rod (1), and a second support column (406) is fixedly mounted on the upper end of the second ring (405).
8. A high-rise building pipeline support assembly according to claim 7, characterized in that: A second support rod (407) is fixedly mounted on the outer wall of the second support rod (406), and a second fixing screw (408) is mounted on the upper end of the second support rod (407).
Citation Information
Patent Citations
Pipeline suspension support for constructional engineering
CN218783494U