Denitration and desulfurization waste heat recovery equipment

By designing gears and bevel gear mechanisms driven by the drive motor, the effective movement of the annular blade on the inner wall of the waste heat absorption chamber is achieved, which solves the problem of difficulty in moving the blade downward and difficult to remove scale in the prior art, and improves the removal efficiency and practicality of the device.

CN222543813UActive Publication Date: 2025-02-28JIANGSU KENLE ENERGY CONSERVATION & ENVIRONMENTAL SCI-TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202323461485.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2025-02-28
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

In the prior art, the water flow drives the blade to rotate, making it difficult for the blade to move downward, and it is impossible to effectively remove the scale from the indoor wall of the waste heat absorption chamber, and the scale after removal is difficult to remove, reducing the practicality of the device.

Method used

A waste heat recovery equipment for denitrification and desulfurization is designed. The drive motor drives the reciprocating screws to rotate, and the annular blade is driven to move up and down in the waste heat absorption chamber through the gears and bevel gear mechanisms to effectively remove scales, and the circular adapter block is driven down through the hydraulic rod to remove scales.

Benefits of technology

The ring blade is effectively moved up and down the inner wall of the waste heat absorption chamber, which can remove scale well, and conveniently remove scale through hydraulic drive, improving the practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model provides denitration and desulfurization waste heat recovery equipment, and relates to the technical field of boiler equipment. The waste heat recovery equipment for denitration and desulfurization comprises a waste heat recovery boiler, a circular ring seat is fixedly connected to the interior of the waste heat recovery boiler, and a first circular adaptive block is arranged in the circular ring seat. According to the waste heat recovery equipment for denitration and desulfurization, the output end of a driving motor drives a reciprocating lead screw to rotate, the reciprocating lead screw is connected with a second rack through a nut pair, the second rack can slide on a second limiting rod in a reciprocating mode and is in meshed connection with a second gear, and a rotating rod drives a second bevel gear to rotate; a second bevel gear is meshed with two first bevel gears, the two first gears are driven to rotate through two rotating rods, the two first gears are both meshed with two first racks, and an annular scraper knife is driven through two connecting plates to move up and down in a reciprocating mode in a waste heat absorption chamber; and the annular scraper knife can be used for well removing scale on the inner wall of the waste heat absorption chamber.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to waste heat recovery equipment, in particular to waste heat recovery equipment for denitration and desulfurization, belonging to the technical field of boiler equipment. Background Art

[0002] A boiler is an energy conversion device. The energy input into the boiler includes chemical energy and electrical energy in the fuel. The boiler outputs steam, high-temperature water or organic heat carrier with a certain amount of thermal energy. The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's lives, or can be converted into mechanical energy through a steam power device, or the mechanical energy can be converted into electrical energy through a generator. A boiler that provides hot water is called a hot water boiler, which is mainly used for life and also has a small number of applications in industrial production.

[0003] The disclosure is of CN217083382U, a boiler waste heat recovery device for desulfurization and denitrification, comprising a waste heat recovery boiler, a waste heat absorption chamber arranged in the inner cavity of the waste heat recovery boiler, a top column arranged on the top wall of the inner cavity of the waste heat absorption chamber, a return spring arranged in the inner cavity of the top column, a rack arranged at the lower end of the inner cavity of the top column, a cross bar arranged at the lower end of the rack, first rings arranged at both ends of the cross bar, a support column arranged at the lower end of the first ring, and a scraper arranged at the lower end of the support column.

[0004] Although there are many benefits in the above scheme, there are also the following disadvantages: 1. The water flow drives the blades to rotate, so that the shovel can move downward quickly, thereby scraping off the scale on the inner wall of the waste heat absorption chamber. However, the way in which the water flow drives the blades to rotate makes it difficult to move the shovel downward under the limiting action of the reset spring, and it may even be impossible to scrape off the scale on the inner wall of the waste heat absorption chamber; 2. If the scale after scraping is large, it is difficult to remove it from the waste heat absorption chamber, which reduces the practicability of the device. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] The purpose of the utility model is to provide a waste heat recovery device for denitrification and desulfurization in order to solve the above-mentioned problems, so as to solve the problems in the prior art that 1. The water flow drives the blades to rotate, so that the scraper can move downward quickly, thereby scraping away the scale on the inner wall of the waste heat absorption chamber. However, the way in which the water flow drives the blades to rotate makes it difficult to move the scraper downward under the limiting action of the reset spring, and it may even be impossible to scrape away the scale on the inner wall of the waste heat absorption chamber; 2. When the scale after scraping is large, it is difficult to remove it from the waste heat absorption chamber, which reduces the practicality of the device.

[0007] (II) Technical solution

[0008] The utility model is implemented through the following technical scheme: waste heat recovery equipment for denitrification and desulfurization comprises a waste heat recovery boiler, the waste heat recovery boiler is fixedly connected with a circular ring seat, a first circular adapter block is arranged inside the circular ring seat, a sealing assembly is arranged between the first circular adapter block and the waste heat recovery boiler, a ring-shaped scraper is arranged on the top of the first circular adapter block, the ring-shaped scraper contacts the inner wall of the waste heat recovery boiler, two connecting plates are fixedly connected with the inside of the ring-shaped scraper, the tops of the two connecting plates are fixedly connected with a first rack, the outer sides of the two first racks are meshed with a first gear, the opposite sides of the two first gears are fixedly connected with a rotating rod, one end of the two rotating rods are fixedly connected with a first bevel gear, a second bevel gear is meshed between the two first bevel gears, the top of the second bevel gear is fixedly connected with a rotating rod, the top of the rotating rod is fixedly connected with a second gear, the outer side of the second gear is meshed with a second rack, and the inside of the second rack is connected with a reciprocating screw through a nut pair.

[0009] Preferably, a base is provided at the bottom of the waste heat recovery boiler, a plurality of L-shaped fixing rods are provided between the waste heat recovery boiler and the base, and two ends of the L-shaped fixing rods are fixedly connected to the waste heat recovery boiler and the base respectively.

[0010] Preferably, a water inlet pipe and a smoke inlet pipe are installed on one side of the waste heat recovery boiler, a water outlet pipe is installed on the other side of the waste heat recovery boiler, and a valve is installed on the outside of the water outlet pipe.

[0011] Preferably, the sealing assembly includes a first circular plate, which is fixedly connected to the bottom of the first circular adapter block, a first annular sealing gasket is installed on the top of the first circular plate, the first annular sealing gasket is in contact with the circular ring seat, and a connecting rod is fixedly connected to the bottom of the first circular plate. The first annular sealing gasket is arranged to seal the connection between the first circular plate and the circular ring seat.

[0012] Preferably, the sealing assembly also includes a second circular adapter block, which is arranged inside the waste heat recovery boiler, and the second circular adapter block is fixedly connected to the bottom end of the connecting rod. A second circular plate is fixedly connected to the bottom of the second circular adapter block, and a second annular sealing gasket is installed on the top of the second circular plate. The second annular sealing gasket is in contact with the waste heat recovery boiler, and two connecting blocks are fixedly connected to the outer side of the second circular plate. Two hydraulic rods are fixedly connected to the outer side of the waste heat recovery boiler, and the bottom ends of the two hydraulic rods are fixedly connected to the two connecting blocks. The second annular sealing gasket is provided to seal the connection between the second circular plate and the waste heat recovery boiler.

[0013] Preferably, the inner sides of the two connecting plates are slidably connected with a first limit rod, the two first limit rods are fixedly connected to the top of the interior of the waste heat recovery boiler, the outer sides of the two rotating rods are rotatably connected with a fixed plate, the two fixed plates are fixedly connected to the top of the interior of the waste heat recovery boiler, and the setting of the fixed plate serves as a rotational support for the rotating rod.

[0014] Preferably, the top of the rotating rod passes through the top of the waste heat recovery boiler and is rotatably connected to the waste heat recovery boiler, both ends of the outer side of the reciprocating screw rod are rotatably connected to fixed blocks, the two fixed blocks are fixedly connected to the waste heat recovery boiler, a second limit rod is fixedly connected between the two fixed blocks, the second rack is slidably connected to the outside of the second limit rod, a driving motor is fixedly connected to the top of the waste heat recovery boiler, and the output end of the driving motor is fixedly connected to the reciprocating screw rod, and the setting of the two fixed blocks serves as a rotational support for the reciprocating screw rod.

[0015] The utility model provides a waste heat recovery device for denitration and desulfurization, which has the following beneficial effects:

[0016] 1. The waste heat recovery equipment for denitrification and desulfurization drives the reciprocating screw to rotate at the output end of the motor. The reciprocating screw is connected to the second rack through a nut pair. The second rack can slide back and forth on the second limit rod. The second rack is meshed with the second gear. The rotating rod drives the second bevel gear to rotate. The second bevel gear is meshed with the two first bevel gears. The two first gears are driven to rotate through the two rotating rods. The two first gears are meshed with the two first racks. The annular scraper is driven to move back and forth up and down in the waste heat absorption chamber through the two connecting plates. The annular scraper can remove the scale on the inner wall of the waste heat absorption chamber very well.

[0017] 2. For the waste heat recovery equipment for denitrification and desulfurization, when it is necessary to remove the scale, the personnel only need to start the two hydraulic rods, and the two connecting blocks will drive the second circular plate and the second circular adapter block to move downward away from the waste heat recovery boiler. The first circular plate and the first circular adapter block will be driven downward by the connecting rods, and the first circular adapter block can be moved out of the waste heat recovery boiler so that the personnel can remove the scale that falls on the first circular adapter block. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the internal structure of the waste heat recovery boiler of the utility model;

[0020] Figure 3 For this utility model Figure 2 A magnified view of the structure of part A;

[0021] Figure 4 This is a schematic diagram of the connecting rod structure of the utility model.

[0022]

Main component symbol description

[0023] 1. Base; 2. Waste heat recovery boiler; 3. Water inlet pipe; 4. Smoke inlet pipe; 5. Circular ring seat; 6. First circular adapter block; 7. First circular plate; 8. Connecting rod; 9. Second circular adapter block; 10. Second circular plate; 11. Hydraulic rod; 12. Water outlet pipe; 13. Annular scraper; 14. Connecting plate; 15. First rack; 16. First gear; 17. Rotating rod; 18. Fixed plate; 19. First bevel gear; 20. Second bevel gear; 21. Rotating rod; 22. Second gear; 23. Second rack; 24. Reciprocating screw. DETAILED DESCRIPTION

[0024] The embodiment of the utility model provides a waste heat recovery device for denitration and desulfurization.

[0025] See also Figure 1 , Figure 2 , Figure 3 and Figure 4, including a waste heat recovery boiler 2, a base 1 is provided at the bottom of the waste heat recovery boiler 2, a plurality of L-shaped fixing rods are provided between the waste heat recovery boiler 2 and the base 1, and the two ends of the L-shaped fixing rods are respectively fixedly connected to the waste heat recovery boiler 2 and the base 1, a water inlet pipe 3 and a smoke inlet pipe 4 are installed on one side of the waste heat recovery boiler 2, a water outlet pipe 12 is installed on the other side of the waste heat recovery boiler 2, and a valve is installed on the outside of the water outlet pipe 12, a circular seat 5 is fixedly connected inside the waste heat recovery boiler 2, and a first circular adapter block 6 is provided inside the circular seat 5, and the first circular adapter A sealing assembly is provided between the block 6 and the waste heat recovery boiler 2, an annular scraper 13 is provided on the top of the first circular adapter block 6, the annular scraper 13 contacts the inner wall of the waste heat recovery boiler 2, two connecting plates 14 are fixedly connected inside the annular scraper 13, the tops of the two connecting plates 14 are fixedly connected with first racks 15, the outer sides of the two first racks 15 are meshed with first gears 16, the opposite sides of the two first gears 16 are fixedly connected with rotating rods 17, the inner sides of the two connecting plates 14 are slidably connected with first limit rods, and the two first limit rods are fixedly connected with the inner sides of the two connecting plates 14. A limit rod is fixedly connected to the top of the waste heat recovery boiler 2, and the outer sides of the two rotating rods 17 are rotatably connected with a fixed plate 18. The two fixed plates 18 are fixedly connected to the top of the waste heat recovery boiler 2. One end of the two rotating rods 17 is fixedly connected with a first bevel gear 19. A second bevel gear 20 is meshedly connected between the two first bevel gears 19. A rotating rod 21 is fixedly connected to the top of the second bevel gear 20. The top of the rotating rod 21 is fixedly connected to a second gear 22. The outer side of the second gear 22 is meshedly connected with a second rack 23. A reciprocating screw rod 24 is connected to the inside of the second rack 23 through a nut pair. The top of the rotating rod 21 passes through the top of the waste heat recovery boiler 2 and is rotatably connected to the waste heat recovery boiler 2. Both ends of the outer side of the reciprocating screw rod 24 are rotatably connected with fixed blocks. The two fixed blocks are fixedly connected to the waste heat recovery boiler 2. A second limit rod is fixedly connected between the two fixed blocks. The second rack 23 is slidably connected to the outer side of the second limit rod. A driving motor is fixedly connected to the top of the waste heat recovery boiler 2, and the output end of the driving motor is fixedly connected to the reciprocating screw rod 24.

[0026] Specifically, by setting the annular seat 5 and the first circular adapter block 6, the upper half of the interior of the waste heat recovery boiler 2 is divided into a waste heat absorption chamber. When it is necessary to remove the scale on the inner wall of the waste heat absorption chamber, the drive motor is started. There is no specific limitation on the model of the drive motor, which shall be subject to the adaptation equipment. The output end of the drive motor drives the reciprocating screw 24 to rotate, and the reciprocating screw 24 is connected to the second rack 23 through a nut pair. The second rack 23 can slide back and forth on the second limit rod, and the second rack 23 is meshed with the second gear 22. The rotating rod 21 drives the second bevel gear 20 to rotate, and the second bevel gear 20 is meshed with the two first bevel gears 19. The two first gears 16 are driven to rotate through the two rotating rods 17. The two first gears 16 are meshed with the two first racks 15. The annular scraper 13 is driven to reciprocate up and down in the waste heat absorption chamber through the two connecting plates 14. The annular scraper 13 can remove the scale on the inner wall of the waste heat absorption chamber very well.

[0027] See also Figure 1 , Figure 2 and Figure 4 The sealing assembly includes a first circular plate 7, which is fixedly connected to the bottom of the first circular adapter block 6. A first annular sealing gasket is installed on the top of the first circular plate 7, and the first annular sealing gasket is in contact with the circular ring seat 5. A connecting rod 8 is fixedly connected to the bottom of the first circular plate 7. The sealing assembly also includes a second circular adapter block 9, which is arranged inside the waste heat recovery boiler 2, and the second circular adapter block 9 is fixedly connected to the bottom end of the connecting rod 8. A second circular plate 10 is fixedly connected to the bottom of the second circular adapter block 9, and a second annular sealing gasket is installed on the top of the second circular plate 10. The second annular sealing gasket is in contact with the waste heat recovery boiler 2. Two connecting blocks are fixedly connected to the outside of the second circular plate 10, and two hydraulic rods 11 are fixedly connected to the outside of the waste heat recovery boiler 2. The bottom ends of the two hydraulic rods 11 are fixedly connected to the two connecting blocks.

[0028] Specifically, when the scale needs to be removed, the personnel only need to start the two hydraulic rods 11, and the two connecting blocks will drive the second circular plate 10 and the second circular adapter block 9 to move downward away from the waste heat recovery boiler 2, and the first circular plate 7 and the first circular adapter block 6 will be driven downward by the connecting rod 8. The first circular adapter block 6 can be moved out of the waste heat recovery boiler 2 so that the personnel can remove the scale that falls on the first circular adapter block 6.

[0029] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A waste heat recovery device for denitration and desulfurization, comprising a waste heat recovery boiler (2), characterized in that: The waste heat recovery boiler (2) is fixedly connected to a circular seat (5), a first circular adapter block (6) is arranged inside the circular seat (5), a sealing assembly is arranged between the first circular adapter block (6) and the waste heat recovery boiler (2), an annular scraper (13) is arranged on the top of the first circular adapter block (6), the annular scraper (13) is in contact with the inner wall of the waste heat recovery boiler (2), two connecting plates (14) are fixedly connected inside the annular scraper (13), the tops of the two connecting plates (14) are fixedly connected to first racks (15), and the outer sides of the two first racks (15) are meshed and connected. A first gear (16) is connected, and a rotating rod (17) is fixedly connected to the opposite side of the two first gears (16), and one end of the two rotating rods (17) is fixedly connected to a first bevel gear (19), and a second bevel gear (20) is meshedly connected between the two first bevel gears (19), and a rotating rod (21) is fixedly connected to the top of the second bevel gear (20), and a second gear (22) is fixedly connected to the top of the rotating rod (21), and a second rack (23) is meshedly connected to the outer side of the second gear (22), and a reciprocating screw rod (24) is connected to the inside of the second rack (23) through a nut pair.

2. The waste heat recovery equipment for denitration and desulfurization according to claim 1 is characterized in that: A base (1) is provided at the bottom of the waste heat recovery boiler (2), a plurality of L-shaped fixing rods are provided between the waste heat recovery boiler (2) and the base (1), and two ends of the L-shaped fixing rods are respectively fixedly connected to the waste heat recovery boiler (2) and the base (1).

3. The waste heat recovery equipment for denitration and desulfurization according to claim 1 is characterized in that: A water inlet pipe (3) and a smoke inlet pipe (4) are installed on one side of the waste heat recovery boiler (2), and a water outlet pipe (12) is installed on the other side of the waste heat recovery boiler (2), and a valve is installed on the outside of the water outlet pipe (12).

4. The waste heat recovery equipment for denitration and desulfurization according to claim 1 is characterized in that: The sealing assembly comprises a first circular plate (7), the first circular plate (7) being fixedly connected to the bottom of a first circular adapter block (6), a first annular sealing gasket being installed on the top of the first circular plate (7), the first annular sealing gasket being in contact with the circular ring seat (5), and a connecting rod (8) being fixedly connected to the bottom of the first circular plate (7).

5. The waste heat recovery equipment for denitration and desulfurization according to claim 4 is characterized in that: The sealing assembly further comprises a second circular adapter block (9), the second circular adapter block (9) being arranged inside the waste heat recovery boiler (2), the second circular adapter block (9) being fixedly connected to the bottom end of the connecting rod (8), a second circular plate (10) being fixedly connected to the bottom of the second circular adapter block (9), a second annular sealing gasket being installed on the top of the second circular plate (10), the second annular sealing gasket being in contact with the waste heat recovery boiler (2), two connecting blocks being fixedly connected to the outside of the second circular plate (10), two hydraulic rods (11) being fixedly connected to the outside of the waste heat recovery boiler (2), the bottom ends of the two hydraulic rods (11) being fixedly connected to the two connecting blocks.

6. The waste heat recovery equipment for denitration and desulfurization according to claim 1, characterized in that: The inner sides of the two connecting plates (14) are slidably connected to a first limit rod, and the two first limit rods are fixedly connected to the internal top of the waste heat recovery boiler (2). The outer sides of the two rotating rods (17) are rotatably connected to a fixed plate (18), and the two fixed plates (18) are fixedly connected to the internal top of the waste heat recovery boiler (2).

7. The waste heat recovery equipment for denitration and desulfurization according to claim 1, characterized in that: The top end of the rotating rod (21) passes through the top end inside the waste heat recovery boiler (2) and is rotatably connected to the waste heat recovery boiler (2); both ends of the outer side of the reciprocating screw rod (24) are rotatably connected to fixed blocks; both fixed blocks are fixedly connected to the waste heat recovery boiler (2); a second limit rod is fixedly connected between the two fixed blocks; the second rack (23) is slidably connected to the outer side of the second limit rod; a driving motor is fixedly connected to the top of the waste heat recovery boiler (2); and the output end of the driving motor is fixedly connected to the reciprocating screw rod (24).

Citation Information

Patent Citations

  • Desulfurization and denitrification boiler waste heat recovery device

    CN217083382U