Scale for constructional engineering
By designing a ruler for construction projects with mounting grooves and frame rods, the problem that the level cannot observe the scale marks of the scale in the dense areas of steel bars is solved, and the elevation measurement and positioning in this case is achieved to ensure the measurement accuracy during construction.
Patent Information
- Application Number
- CN202421080484.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-05-17
AI Technical Summary
During the construction process, when the steel bars are dense, the leveling instrument cannot directly observe the scale mark on the side of the ruler, making it difficult to leave the elevation mark on the position of the ruler.
A ruler for construction projects was designed, with equidistantly distributed installation grooves at both ends of the ruler body. The mounting plate is clamped on both sides of the ruler, and the frame rod is inserted on the mounting plate. The measuring plate corresponds to the scale body, and the scale line matches. The frame rod bypasses the blocked steel bars, so that the level can observe the scale line on the measurement plate.
It realizes that when measuring elevation in dense areas of steel bars, it can effectively bypass the shading, ensuring that the measuring staff can accurately locate the steel bars at any position, and avoid inconvenient position adjustment due to the unpoured concrete panels.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction engineering, and in particular relates to a ruler for construction engineering. Background Art
[0002] Elevation measurement refers to the process of measuring the vertical height of the ground, structures or other objects. This measurement is usually used in civil engineering, construction and geographic surveying to determine the height difference or relative height between different locations. When measuring elevation, professional measuring equipment such as level, total station or laser rangefinder is required, and the elevation position is determined with a ruler.
[0003] When measuring the elevation on the construction panel, it is necessary to use measuring instruments such as a level to observe the scale lines on the elevation to judge the elevation position. The elevation needs to be placed on the steel bars to facilitate leaving elevation marks on the steel bars. When the steel bar skeleton is dense and the adjacent steel bars block the level's line of sight, the level cannot directly observe the scale lines on one side of the ruler, which is not conducive to leaving elevation marks on the position where the ruler is placed. Utility Model Content
[0004] The utility model provides a ruler for construction engineering, which has the characteristic of solving the problem that it is not conducive to leaving elevation marks on the ruler setting position after the adjacent steel bars of a relatively dense steel bar skeleton block the sight line of a level instrument.
[0005] The utility model provides the following technical scheme: comprising a ruler body, both ends of the ruler body are provided with a plurality of equally spaced mounting grooves, the mounting grooves are snap-connected with mounting plates, the two mounting plates are provided with a plurality of slide grooves, one side of the ruler body is provided with a measuring plate, the measuring plate is provided with a plurality of threaded grooves corresponding to the slide grooves, the threaded grooves are connected with a rack rod, one end of the rack rod is connected to the threaded groove through a connector, the rack rod is slidably connected to the inner wall of the slide groove, the ruler body and the measuring plate are provided with matching scale lines, the mounting grooves are opened at positions corresponding to the scale lines, the other side of the ruler body is slidably connected to two slide plates, and one side of the slide plate is slidably connected to two clamping plates.
[0006] A vertical groove is provided at the connection between the ruler body and the slide plate, a limit rod is fixedly connected to the inner wall of the vertical groove, a limit plate is fixedly connected to one end of the slide plate, the limit plate is slidably connected to the limit rod, and a sliding hole matching the limit rod is provided on the limit plate.
[0007] Among them, two fixed plates are fixedly connected to one side of the skateboard, a sliding rod is fixedly connected between the two fixed plates, the sliding rod passes through the clamping plate, a spring is fixedly connected between the clamping plate and the fixed plate, and the spring is sleeved on the outer wall of the sliding rod.
[0008] Wherein, one end of the mounting plate is fixedly connected with two mounting blocks corresponding to the mounting grooves, and the mounting blocks are engaged with the mounting grooves.
[0009] Wherein, a card slot is provided at the bottom of the ruler body, a card plate is card-engaged and connected to the inner wall of the card slot, and a support rod is fixedly connected to the bottom end of the card plate.
[0010] The beneficial effect of the utility model is that after the mounting plates are clamped on both sides of the ruler body through the plurality of mounting grooves opened on the ruler body, the mounting rods erected on the mounting plates can correspond to equal sections of the ruler body, and the scales on the measuring plates can correspond to the scales on the ruler body, so that when the device is performing elevation measurement, the measuring plates can be erected in front of the ruler body through the mounting rods, so that the staff can measure and locate the elevation height of the position according to the scale lines on the measuring plates, and the device can facilitate the measurement staff to perform elevation positioning work on steel bars at any position.
[0011] The parts not involved in the device are the same as those in the prior art or can be implemented by using the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0013] Figure 2 It is a schematic diagram of the three-dimensional split structure in the utility model;
[0014] Figure 3 It is a schematic diagram of the movement of the mounting plate in the utility model;
[0015] Figure 4 For this utility model Figure 2 A is an enlarged schematic diagram.
[0016] In the figure: 1. ruler body; 11. mounting groove; 12. vertical groove; 13. limit rod; 14. clamping groove; 15. clamping plate; 151. support rod; 2. mounting plate; 21. mounting block; 22. slide groove; 23. measuring plate; 231. threaded groove; 24. rack rod; 241. connector; 3. slide plate; 31. limit plate; 311. slide hole; 32. fixing plate; 33. splint; 34. slide rod; 341. spring. DETAILED DESCRIPTION
[0017] See also Figure 1-Figure 4The utility model provides the following technical solutions: including a ruler body 1, a plurality of equally spaced mounting grooves 11 are provided at both ends of the ruler body 1, mounting plates 2 are engaged and connected to the mounting grooves 11, a plurality of slide grooves 22 are provided on the two mounting plates 2, a measuring plate 23 is provided on one side of the ruler body 1, a plurality of threaded grooves 231 corresponding to the slide grooves 22 are provided on the measuring plate 23, a frame rod 24 is connected to the threaded groove 231, one end of the frame rod 24 is connected to the threaded groove 231 through a connector 241, the frame rod 24 is slidably connected to the inner wall of the slide groove 22, matching scale lines are provided on the ruler body 1 and the measuring plate 23, the opening position of the mounting groove 11 corresponds to the scale lines, two slide plates 3 are slidably connected to the other side of the ruler body 1, and two clamping plates 33 are slidably connected to one side of the slide plate 3.
[0018] In this embodiment: the ruler body 1 is used for construction surveyors to perform elevation positioning work during floor construction. By placing the ruler body 1 against the steel bars on the floor surface, the surveyors can observe the scale lines on the ruler body 1 through the level meter to measure the height. Since the level meter is set at a fixed position, when the level meter is used to perform elevation positioning work on steel bars at different positions, when the level meter and the steel bar position to be measured and positioned need to be positioned at the steel bar skeleton position, and since the steel bar skeleton is relatively dense, the ruler body 1 is attached to the steel bar skeleton for positioning. After the level meter is leveled, the height is fixed, which is easy to use The sight line of the level instrument is blocked by the steel bar, so that the level instrument cannot directly observe the scale line on one side of the scale body 1, which is not conducive to the elevation positioning of the steel bar at the position where the scale body 1 is attached, and it is impossible to ensure that when measuring the 50-centimeter casting line, the steel bar at a certain position needs to be wrapped with tape. At this time, the scale body 1 is blocked, which is not conducive to observing the scale line on the level instrument, which is not conducive to the surveyor to adjust the height of the scale body 1, resulting in the inability to wrap the tape. At this time, the device can use the installation grooves 11 opened on both sides of it to make the mounting plate 2 correspond to the mounting grooves 11, so that it can be installed on the scale On both sides of the ruler body 1, the slide groove 22 provided on the mounting plate 2 allows the frame rod 24 to be inserted into the inner wall thereof. According to the position of the steel bar to be blocked, the frame rod 24 is installed in the slide groove 22 at a position displaced from the steel bar. After the frame rod 24 is inserted into the slide groove 22, one end of the frame rod 24 can be connected to the thread groove 231 provided on the measuring plate 23 and corresponding to the slide groove 22 through the connector 241, so that the measuring plate 23 can be installed under the frame rod 24, so that the measuring plate 23 can be kept horizontally corresponding to one side of the ruler body 1, so that the scale lines on the measuring plate 23 can match the scale lines on one side of the ruler body 1, so that the measuring plate 23 can be installed horizontally corresponding to the ... The measuring plate 23 can bypass the obstructed steel bars through the rack 24, so that the spirit level can directly observe the scale lines on the measuring plate 23. Since the measuring plate 23 corresponds to the scale body 1, the staff can measure and locate the elevation height of the position according to the scale lines on the measuring plate 23, so that the device can facilitate the surveying personnel to perform elevation positioning work on steel bars at any position, avoiding the need to change the elevation positioning position after being obstructed by nearby steel bars. Since the concrete panel has not been poured at this time, it is not convenient to transfer it, and at the same time avoid adjusting the position of the spirit level, thereby facilitating the surveying personnel to perform elevation positioning work required for concrete pouring.
[0019] A vertical groove 12 is provided at the connection between the ruler body 1 and the slide plate 3, and a limiting rod 13 is fixedly connected to the inner wall of the vertical groove 12, and a limiting plate 31 is fixedly connected to one end of the slide plate 3, and the limiting plate 31 is slidably connected to the limiting rod 13, and a sliding hole 311 matching the limiting rod 13 is provided on the limiting plate 31; the vertical groove 12 provided on the ruler body 1 is used to connect with the limiting plate 31 fixedly connected to one end of the slide plate 3, so that the limiting plate 31 is penetrated by the limiting rod 13 fixedly connected to the inner wall of the vertical groove 12, so that the limiting plate 31 can be limited, so that the slide plate 3 can be on one side of the ruler body 1 and slide up and down, so that the two clamping plates 33 slidably connected on one side of the slide plate 3 can be adjusted to the staggered position of the required steel bars and the transverse frame, so that the clamping plates 33 can be clamped on the steel bars, ensuring that the steel bars are clamped by the clamping plates 33, so that the ruler body 1 can maintain vertical correspondence with the steel bars.
[0020] Two fixed plates 32 are fixedly connected to one side of the slide plate 3, and a sliding rod 34 is fixedly connected between the two fixed plates 32. The sliding rod 34 passes through the clamping plate 33, and a spring 341 is fixedly connected between the clamping plate 33 and the fixed plate 32. The spring 341 is sleeved on the outer wall of the sliding rod 34; the two fixed plates 32 fixedly connected to one side of the slide plate 3 are used to install and fix the sliding rod 34, so that the clamping plate 33 is limited on the sliding rod 34 by the penetration of the sliding rod 34, so that the clamping plate 33 slides horizontally on the sliding rod 34, and the clamping plate 33 is supported by the spring 341, so that the two clamping plates 33 can be clamped on the steel bar when the device is in use, and the upper and lower groups of clamping plates 33 are clamped on the steel bar, so that the ruler body 1 can correspond vertically to the steel bar to ensure its verticality.
[0021] One end of the mounting plate 2 is fixedly connected to two mounting blocks 21 corresponding to the mounting grooves 11, and the mounting blocks 21 are engaged with the mounting grooves 11; the mounting blocks 21 fixedly connected to one end of the mounting plate 2 are used to engage with the inner wall of the mounting groove 11, so that the mounting plate 2 can be detachably mounted on the outer wall of the ruler body 1 to support and erect the measuring plate 23.
[0022] A card slot 14 is provided at the bottom of the ruler body 1, and a card plate 15 is snap-connected to the inner wall of the card slot 14, and a support rod 151 is fixedly connected to the bottom end of the card plate 15; the card slot 14 is used to enable the card plate 15 to be installed and snap-connected to its inner wall, so that the support rod 151 fixedly connected to the bottom end of the card plate 15 can be supported on the ground, so that the support rod 151 can prevent unsolidified concrete from accumulating at the bottom of the ruler body 1 when the device is in use, thereby affecting the measurement accuracy of the ruler body 1.
[0023] The working principle and use process of the utility model are as follows: when the device is used to perform elevation measurement, by attaching the ruler body 1 to the steel bar, when the scale on the ruler body 1 is blocked by the nearby steel bar skeleton, two mounting plates 2 can be mounted on both sides of the ruler body 1, so that the measuring plate 23 is inserted on the mounting plate 2 through the frame rod 24, and the measuring plate 23 is erected in front of the mounting plate 2. The measuring plate 23 is provided with scale lines matching the ruler body 1, so that the staff can measure and locate the elevation height of the position according to the scale lines on the measuring plate 23, so that the device can facilitate the surveying personnel to perform elevation positioning work on the steel bars at any position, avoid the need to change the elevation positioning position after being blocked by the nearby steel bars, because the concrete panel is not poured at this time and it is not convenient to transfer, and at the same time avoid adjusting the position of the level, so as to facilitate the surveying personnel to perform elevation positioning work required for concrete pouring.
Claims
1. A ruler for construction engineering, comprising a ruler body (1), characterized in that: Both ends of the ruler body (1) are provided with a plurality of equally spaced mounting grooves (11), the mounting grooves (11) are snap-connected with mounting plates (2), the two mounting plates (2) are provided with a plurality of slide grooves (22), one side of the ruler body (1) is provided with a measuring plate (23), the measuring plate (23) is provided with a plurality of thread grooves (231) corresponding to the slide grooves (22), the thread grooves (231) are connected with a frame rod (24), one end of the frame rod (24) is connected to the thread groove (231) through a connector (241), the frame rod (24) is slidably connected to the inner wall of the slide groove (22), the ruler body (1) and the measuring plate (23) are provided with matching scale lines, the mounting grooves (11) are provided at positions corresponding to the scale lines, the other side of the ruler body (1) is slidably connected with two slide plates (3), one side of the slide plate (3) is slidably connected with two clamping plates (33).
2. A construction engineering ruler according to claim 1, characterized in that: A vertical groove (12) is provided at the connection between the ruler body (1) and the slide plate (3); a limit rod (13) is fixedly connected to the inner wall of the vertical groove (12); a limit plate (31) is fixedly connected to one end of the slide plate (3); the limit plate (31) is slidably connected to the limit rod (13); and a sliding hole (311) matching the limit rod (13) is provided on the limit plate (31).
3. A construction engineering ruler according to claim 1, characterized in that: Two fixed plates (32) are fixedly connected to one side of the slide plate (3), a slide rod (34) is fixedly connected between the two fixed plates (32), the slide rod (34) passes through the clamping plate (33), a spring (341) is fixedly connected between the clamping plate (33) and the fixed plate (32), and the spring (341) is sleeved on the outer wall of the slide rod (34).
4. A construction engineering ruler according to claim 1, characterized in that: Two mounting blocks (21) corresponding to the mounting grooves (11) are fixedly connected to one end of the mounting plate (2), and the mounting blocks (21) are engaged with the mounting grooves (11).
5. A construction engineering ruler according to claim 1, characterized in that: A clamping groove (14) is provided at the bottom of the ruler body (1), a clamping plate (15) is clamped and connected to the inner wall of the clamping groove (14), and a support rod (151) is fixedly connected to the bottom end of the clamping plate (15).