Pressure testing machine for high-pressure pipe fitting forming production

By setting up parts such as moving plates, screws and other components on the test bench of the pressure test machine for forming and producing high-pressure pipe fittings, the twisting rods are used to drive the push frame to move, and the clamping ring gradually approaches to clamp the high-pressure pipe fittings, the problem of possible position deviation in the high-pressure pipe fittings during the test is solved, and the accuracy and reliability of the test are improved.

CN222561448UActive Publication Date: 2025-03-04NANJING HUAMAI AUTOMOTIVE PARTS MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420980902.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2025-03-04
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

In pressure test, high-pressure pipe fittings may not be in a vertical horizontal line with the pressure plate, resulting in position offset and affecting the pressure test results.

Method used

A pressure tester for forming and producing high-pressure pipe fittings is designed. By setting a moving plate, a screw, an auxiliary strip, an auxiliary block, a first rotating column and a clamping ring on the test bench, the twisting rod drives the push frame to move, and the clamping ring gradually approaches to clamp the high-pressure pipe fittings to ensure the firmness and stability of the test.

Benefits of technology

Through stable clamping of the clamping ring, the position deviation of the high-pressure pipe fittings during the test is avoided, and the accuracy and reliability of the pressure test are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222561448U_ABST
    Figure CN222561448U_ABST
Patent Text Reader

Abstract

The utility model discloses a pressure testing machine for high-pressure pipe fitting forming production, which comprises a testing machine body and a pressure plate, the pressure plate is arranged on one side of the testing machine body, a testing table is arranged at the top of the testing machine body, two horizontal rods are arranged in the testing table, one end of each horizontal rod is sleeved with a moving plate, and the other end of each horizontal rod is sleeved with a pressing plate. Supporting frames are arranged on one sides of the two moving plates correspondingly, lead screws are arranged in the two supporting frames correspondingly, one ends of the two lead screws are sleeved with pushing frames correspondingly, and the moving plates, the lead screws, auxiliary strips, auxiliary blocks, first rotating columns and clamping rings are arranged, after twisting rods are rotated clockwise, the pushing frames are driven to move leftwards at one ends of the lead screws; and the two clamping rings are gradually close to each other, so that the distance between the two clamping rings can be continuously adjusted, after one end of a first rotating column is embedded into a supporting block and a first concave hole, a pushing frame and an auxiliary block can be limited and fixed, and the stability of the clamping rings is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pressure testing machines, in particular to a pressure testing machine for high-pressure pipe fitting forming production. Background Art

[0002] The pressure testing machine for high-pressure pipe fittings forming production is a device designed specifically for pressure testing of high-pressure pipe fittings during the forming production process. This testing machine plays a vital role in the production line of high-pressure pipe fittings, and can ensure that the pressure resistance and sealing performance of the pipe fittings meet the predetermined standards. The core component of the pressure testing machine is the sensor, which is responsible for converting physical quantities (i.e. pressure) into electrical signals. When the high-pressure pipe fittings being tested are subjected to pressure, the sensor can sense the changes in pressure and generate corresponding electrical signals, thereby testing the pressure resistance of the high-pressure pipe fittings.

[0003] The pressure testing machine can test the compressive performance of high-pressure pipe fittings to ensure that the pressure resistance of the pipe fittings reaches the predetermined standard. The table top of the pressure testing machine is mostly open, and high-pressure pipe fittings can only be placed on its surface. The pressure plate is used to apply pressure to the top of the high-pressure pipe fitting. When the pressure plate contacts the top of the high-pressure pipe fitting, the high-pressure pipe fitting may not be in a vertical horizontal line with the pressure plate. After being squeezed, it may shift in position and move left and right, which will affect the results of the pressure test. Therefore, it is particularly important to design a pressure testing machine for high-pressure pipe fitting forming production. Utility Model Content

[0004] The purpose of the utility model is to provide a pressure testing machine for high-pressure pipe forming production, so as to solve the problem proposed in the above background technology that the high-pressure pipe may not be in a vertical horizontal line with the pressure plate, and after being squeezed, it may be displaced and move left and right, thereby affecting the result of the pressure test.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pressure testing machine for high-pressure pipe fitting forming production, comprising a testing body and a pressure plate, the pressure plate being arranged on one side of the testing body, a testing table being arranged on the top of the testing body, two horizontal bars being arranged inside the testing table, one end of each of the two horizontal bars being provided with a moving plate, one side of each of the two moving plates being provided with a supporting frame, the inside of each of the two supporting frames being provided with a screw rod, one end of each of the two screw rods being provided with a pushing frame, the inside of each of the two pushing frames being provided with an auxiliary strip, one end of each of the two auxiliary strips being provided with an auxiliary block, and one side of each of the two auxiliary blocks being provided with a clamping ring.

[0006] As a preferred technical solution of the utility model, positioning strips are provided on both sides of the two auxiliary blocks, one side of the two clamping rings is respectively fixedly connected to one end of the two adjacent positioning strips, and the two auxiliary blocks are respectively movably mounted on one end of the two auxiliary strips.

[0007] As a preferred technical solution of the utility model, the top ends of the two auxiliary blocks are both provided with support blocks, and one side of the two pushing frames are both provided with a plurality of first recessed holes.

[0008] As a preferred technical solution of the utility model, a first rotating column is provided on one side of the two support blocks, and one end of the two first rotating columns is respectively connected to the internal threads of the plurality of first recessed holes.

[0009] As a preferred technical solution of the utility model, the two pushing frames are respectively threadedly sleeved on one end of the two screw rods, and a torsion rod is rotatably installed on one side of the two moving plates.

[0010] As a preferred technical solution of the utility model, one end of the two torsion rods is fixedly connected to one end of the two screw rods respectively.

[0011] As a preferred technical solution of the utility model, a plurality of second recessed holes are opened on both sides of the top of the test bench, and a second rotating column is provided on the top of the two moving plates, and one end of the two second rotating columns is respectively connected to the internal threads of the plurality of second recessed holes.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. The utility model is a pressure testing machine for high-pressure pipe forming production. By setting a moving plate, a screw rod, an auxiliary strip, an auxiliary block, a first rotating column and a clamping ring, after the torsion rod is rotated clockwise, the push frame is driven to move leftward at one end of the screw rod, and the two clamping rings are gradually approached, so that the outer surface of the high-pressure pipe fitting can be clamped, which increases the firmness of the pressure test of the high-pressure pipe fitting. The auxiliary block can move left and right at one end of the auxiliary strip, so that the distance between the two clamping rings can continue to be adjusted. After one end of the first rotating column is embedded into the inside of the support block and the first concave hole, the three are threadedly connected, and then the push frame and the auxiliary block can be limited and fixed, thereby ensuring the stability of the clamping ring.

[0014] 2. The utility model is a pressure testing machine for high-pressure pipe forming production. By setting a positioning bar, a horizontal rod, a second rotating column and a second concave hole, the clamping ring and the auxiliary block are connected by two positioning bars. Through the movement of the auxiliary block, the clamping ring will be driven to move under the action of the positioning bar. The moving plate and one end of the horizontal rod are movably sleeved, and the area where the two clamping rings move on the surface of the test bench can be continuously adjusted. After one end of the second rotating column is connected to the internal thread of the moving plate and the second concave hole, the moving plate can be limited to the top of the test bench. At this time, the support frame remains stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a front view structural schematic diagram of the utility model;

[0016] Figure 2 For the utility model Figure 1 The enlarged view of point A in the middle;

[0017] Figure 3 It is a partial front view structural schematic diagram of the utility model;

[0018] Figure 4 It is a partial top view of the structure of the utility model.

[0019] In the figure: 1. test body; 2. pressure plate; 3. test bench; 4. horizontal rod; 5. moving plate; 6. support frame; 7. torsion rod; 8. screw rod; 9. push frame; 10. auxiliary bar; 11. auxiliary block; 12. positioning bar; 13. clamping ring; 14. support block; 15. first rotating column; 16. first recessed hole; 17. second rotating column; 18. second recessed hole. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-4 The utility model provides a technical solution of a pressure testing machine for high-pressure pipe forming production:

[0022] Embodiment 1:

[0023] like Figure 1-3As shown, a pressure testing machine for high-pressure pipe forming production comprises a testing machine body 1 and a pressure plate 2, the pressure plate 2 is arranged on one side of the testing machine body 1, a testing table 3 is arranged on the top of the testing machine body 1, two horizontal rods 4 are arranged inside the testing table 3, one end of the two horizontal rods 4 are sleeved with a moving plate 5, one side of the two moving plates 5 are arranged with a supporting frame 6, the two supporting frames 6 are arranged with a screw rod 8 inside, one end of the two screw rods 8 are sleeved with a pushing frame 9, the two pushing frames 9 are arranged with an auxiliary strip 10 inside, one end of the two auxiliary strips 10 are sleeved with an auxiliary block 11, one side of the two auxiliary blocks 11 are arranged with a clamping ring 13, the distance between the two clamping rings 13 can be further adjusted, after one end of the first rotating column 15 is embedded into the support block 14 and the first recessed hole 16, the three are threadedly connected, and then the pushing frame 9 and the auxiliary block 11 can be limited and fixed, thereby ensuring the stability of the clamping ring 13.

[0024] Embodiment 2:

[0025] Based on the first embodiment, Figure 1 and Figure 4 As shown, the two pushing frames 9 are respectively threadedly sleeved with one end portion of the two screw rods 8, and the torsion rod 7 is rotatably installed on one side of the two moving plates 5. A plurality of second recessed holes 18 are opened on both sides of the top of the test bench 3, and a second rotating column 17 is arranged on the top of the two moving plates 5. One end of the two second rotating columns 17 is respectively connected with the internal threads of the plurality of second recessed holes 18. The utility model is a pressure testing machine for high-pressure pipe forming production, which is provided with a positioning bar 12, a horizontal rod 4, a second rotating column 17 and a second recessed hole 18. The clamping ring 13 and the auxiliary block 11 are connected by two positioning bars 12. Through the movement of the auxiliary block 11, under the action of the positioning bar 12, the clamping ring 13 will be driven to move, and the moving plate 5 and one end of the horizontal rod 4 are movably sleeved.

[0026] Working principle: The pressure testing machine for high-pressure pipe fittings forming production is a device designed for pressure testing of high-pressure pipe fittings during the forming production process. This testing machine plays a vital role in the production line of high-pressure pipe fittings and can ensure that the pressure resistance and sealing performance of the pipe fittings meet the predetermined standards. The core component of the pressure testing machine is the sensor, which is responsible for converting the physical quantity, namely pressure, into an electrical signal. When the high-pressure pipe fitting being tested is subjected to pressure, the sensor can sense the change in pressure and generate a corresponding electrical signal, thereby testing the pressure resistance of the high-pressure pipe fitting. The staff can manually place the high-pressure pipe fitting on the surface of the test bench 3 and between the two clamping rings 13. At this time, after the staff rotates the two torsion rods 7 clockwise in turn, the outer surface of the push frame 9 is always in contact with the inner surface of the support frame 6. In the process of rotating the torsion rod 7, the screw rod 8 is driven to rotate at the same time, and then the push frame 9 is driven to move to the left at one end of the screw rod 8, and the two clamping rings 13 gradually approach each other, so that the high The outer surface of the pressure pipe fitting is clamped, which increases the firmness of the pressure test of the high-pressure pipe fitting and avoids the test deviation caused by the shaking of the high-pressure pipe fitting. The auxiliary block 11 can move left and right at one end of the auxiliary bar 10, so the distance between the two clamping rings 13 can be further adjusted. After one end of the first rotating column 15 is embedded in the interior of the support block 14 and the first concave hole 16, the three are threadedly connected, and then the pushing frame 9 and the auxiliary block 11 can be limited and fixed to ensure the stability of the clamping ring 13. The clamping ring 13 and the auxiliary block 11 are connected by two positioning bars 12. Through the movement of the auxiliary block 11, under the action of the positioning bar 12, the clamping ring 13 will be driven to move. The moving plate 5 and one end of the horizontal rod 4 are movably sleeved, and the area where the two clamping rings 13 move on the surface of the test bench 3 can be further adjusted. After one end of the second rotating column 17 is connected to the internal thread of the moving plate 5 and the second concave hole 18, the moving plate 5 can be limited at the top of the test bench 3. At this time, the support frame 6 remains stable.

[0027] In the description of the present invention, it is necessary to understand that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0028] In the present invention, unless otherwise clearly stipulated and limited, for example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, for ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pressure testing machine for high-pressure pipe forming production, comprising a testing machine body (1) and a pressure plate (2), wherein the pressure plate (2) is arranged on one side of the testing machine body (1), characterized in that: A test bench (3) is arranged on the top of the test machine body (1), and two horizontal rods (4) are arranged inside the test bench (3), and one end of each of the two horizontal rods (4) is sleeved with a moving plate (5), and one side of each of the two moving plates (5) is arranged with a support frame (6), and the inside of each of the two support frames (6) is provided with a screw rod (8), and one end of each of the two screw rods (8) is sleeved with a pushing frame (9), and the inside of each of the two pushing frames (9) is provided with an auxiliary strip (10), and one end of each of the two auxiliary strips (10) is sleeved with an auxiliary block (11), and one side of each of the two auxiliary blocks (11) is provided with a clamping ring (13).

2. A pressure testing machine for high-pressure pipe forming production according to claim 1, characterized in that: Positioning strips (12) are provided on both sides of the two auxiliary blocks (11), one side of the two clamping rings (13) is respectively fixedly connected to one end of two adjacent positioning strips (12), and the two auxiliary blocks (11) are respectively movably sleeved on one end of the two auxiliary strips (10).

3. A pressure testing machine for high-pressure pipe forming production according to claim 2, characterized in that: The top ends of the two auxiliary blocks (11) are each provided with a supporting block (14), and one side of the two pushing frames (9) is each provided with a plurality of first recessed holes (16).

4. A pressure testing machine for high-pressure pipe forming production according to claim 3, characterized in that: A first rotating column (15) is provided on one side of each of the two supporting blocks (14), and one end of each of the two first rotating columns (15) is respectively connected to the internal threads of the plurality of first recessed holes (16).

5. The pressure testing machine for high-pressure pipe forming production according to claim 1, characterized in that: The two pushing frames (9) are respectively threadedly sleeved on one end of the two screw rods (8), and a torsion rod (7) is rotatably mounted on one side of the two moving plates (5).

6. A pressure testing machine for high-pressure pipe forming production according to claim 5, characterized in that: One end of the two torsion rods (7) is fixedly connected to one end of the two screw rods (8) respectively.

7. The pressure testing machine for high-pressure pipe forming production according to claim 1, characterized in that: A plurality of second recessed holes (18) are provided on both sides of the top of the test bench (3), a second rotating column (17) is provided on the top of the two movable plates (5), and one end of the two second rotating columns (17) is respectively connected to the internal threads of the plurality of second recessed holes (18).