Position control structure for concrete tubular pile stand column
By designing the position control structure for concrete pipe pile columns, the problem of the transposition of arc-shaped steel beef legs during the connection process is solved, the stable positioning of the steel column cap is achieved, and the construction quality and efficiency of foundation pit projects are improved.
Patent Information
- Application Number
- CN202421872769.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-08-05
AI Technical Summary
During the connection process of the combined steel support and concrete pipe pile columns, the arc-shaped steel beef legs are prone to displacement due to accidents, affecting the forming effect of the combined steel support and the construction quality of the foundation pit project.
A position-controlled structure for concrete pipe pile columns is designed, including steel column caps, square steel, steel joists, clasp hoops, pulling steel and bolts. Through the fixing and connection of these components, the displacement of the steel column caps is limited.
It effectively prevents the steel column cap from displaced due to external forces during installation, optimizes the connection method between pipe pile columns and steel joists, improves the stability and safety of construction, and shortens construction time.
Smart Images

Figure CN222575507U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of foundation pit support engineering construction facilities, in particular to a position control structure for concrete pipe pile columns. Background Art
[0002] With the shortage of land resources in my country's central cities, urban buildings are developing towards super-high-rise buildings and deep foundation pits. In order to avoid redundant design of foundation pits, reasonably reduce the cost of foundation pit support and shorten the construction period of foundation pits, more and more foundation pit support forms have emerged. The combination of combined steel support + concrete pipe pile column is a common form of foundation pit support structure. Combined steel support is a commonly used construction technology in modern construction projects, especially in deep foundation pit support structures.
[0003] When connecting the composite steel support and the pipe pile column, the arc-shaped steel corbel is required to be fixedly connected. However, during the connection process, the arc-shaped steel corbel often moves unexpectedly, thus affecting the final forming effect of the composite steel support and the construction quality of the foundation pit project. Utility Model Content
[0004] In order to make up for the above shortcomings, the utility model provides a positioning structure for concrete pipe pile columns, aiming to improve the problem in the prior art that the arc-shaped steel corbels often produce accidental displacement during the connection process, thereby affecting the final forming effect of the combined steel support and the construction quality of the foundation pit project.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a position control structure for a concrete pipe pile column, comprising:
[0006] A pipe pile column, wherein a steel column cap is sleeved on the top of the pipe pile column;
[0007] Square steel, which is arranged on the top of the steel column cap;
[0008] A steel joist is arranged on the top of the steel column cap;
[0009] A clamp is sleeved on the outside of the pipe pile column, and a tension steel is clamped on the outside of the square steel. One end of the tension steel is inserted into the inside of the clamp, and a bolt is threadedly connected inside one end of the tension steel. Both ends of the bolt are threadedly connected to the inside of the clamp. The tension steel is used to limit the steel column cap.
[0010] As a further description of the above technical solution:
[0011] One side of the clamp is fixedly connected with a rubber strip.
[0012] As a further description of the above technical solution:
[0013] The front and rear ends of the steel support beam are fixedly connected with stiffening ribs, and the stiffening ribs are used to increase the strength of the steel support beam.
[0014] As a further description of the above technical solution:
[0015] A slot is provided at the bottom end of the steel support beam, and one end of the tension steel close to the square steel is slidably connected inside the slot, and the slot is used to fix the tension rod.
[0016] As a further description of the above technical solution:
[0017] It also includes a positioning groove, which is opened at the top of the steel column cap. A positioning rod is slidably connected inside the positioning groove. One end of the positioning rod is fixedly connected to the bottom end of the square steel. The positioning rod is used to fix the square steel.
[0018] As a further description of the above technical solution:
[0019] One side of the steel column cap is fixedly connected to a fixing frame, a connecting rod is rotatably connected inside the fixing frame, a sleeve is slidably connected to the outside of one end of the connecting rod, one end of the sleeve passes through the fixing frame and the steel column cap in sequence, a spring is wrapped around the outside of the connecting rod, and the spring is used to provide elastic force to the sleeve.
[0020] As a further description of the above technical solution:
[0021] A sliding groove is provided on the outside of the connecting rod, a handle is fixedly connected to the outside of one end of the connecting rod away from the sleeve, a screw is slidably connected inside the sliding groove, and one end of the screw is threadedly connected to the inside of the sleeve.
[0022] The utility model has the following beneficial effects:
[0023] In the utility model, the steel column cap is sleeved onto the outside of the top end of the pipe pile, and two square steels are fixed on the top, then the steel support beam is placed between the two square steels, and the tension steel is clamped onto the outside of the square steel, and the two parts of the clamp are respectively placed on both sides of the pipe pile column and the bottom end of the tension steel is clamped, and the clamp is fixed to the outside of the pipe pile column and the tension steel is fixed at the same time by bolts, in this way, the steel column cap can be prevented from being displaced due to external force during the installation of the steel support beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a stereoscopic diagram of a pipe pile column of a position control structure for a concrete pipe pile column of the utility model;
[0025] Figure 2 This is a three-dimensional diagram of a position control structure for a concrete pipe pile column of the utility model;
[0026] Figure 3 This is a structural schematic diagram of a steel support beam used for a position control structure of a concrete pipe pile column according to the utility model;
[0027] Figure 4 This is a three-dimensional diagram of a fixing frame of a position control structure for a concrete pipe pile column according to the utility model;
[0028] Figure 5 This is a schematic structural diagram of a sleeve of a position control structure for a concrete pipe pile column according to the utility model;
[0029] Figure 6 This is a structural schematic diagram of a steel column cap of a position control structure for a concrete pipe pile column according to the utility model;
[0030] Figure 7 The utility model is a structural schematic diagram of a pull rod of a position control structure for a concrete pipe pile column.
[0031] Legend:
[0032] 1. Pipe pile column; 2. Steel column cap; 3. Square steel; 4. Steel support beam; 5. Stiffening rib plate; 6. Hoop; 7. Tension steel; 8. Rubber strip; 9. Bolt; 10. Fixing frame; 11. Slot; 12. Positioning groove; 13. Sleeve; 14. Screw; 15. Connecting rod; 16. Spring; 17. Handle; 18. Slide groove; 19. Positioning rod. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0034] Reference Figure 1-7The utility model provides an embodiment: a position control structure for a concrete pipe pile column, comprising a pipe pile column 1, a steel column cap 2 is sleeved on the top of the pipe pile column 1, the thickness of the steel column cap 2 is 5 mm, and the steel column cap 2 is processed by factory finalization, so that the overall stability of the steel column cap 2 is good and the bearing capacity is strong. Square steels 3 are arranged on the front and rear sides of the top of the steel column cap 2, and the square steels 3 are connected to the steel column cap 2 by welding. A steel support beam 4 is placed on the top of the steel column cap 2, and the steel support beam 4 is only placed on the top of the steel column cap 2 and there is no connection between the two. The steel support beam 4 is an I-shaped Structure, a clamp 6 is sleeved on the outside of the pipe pile column 1, and the clamp 6 can be divided into two parts. When the clamp 6 needs to be sleeved on the outside of the pipe pile column 1, the two parts of the clamp 6 are separated, and the two parts of the clamp 6 are respectively placed on both sides of the pipe pile column 1 and connected, and the two square steels 3 are clamped with tension steels 7 on the outside, and one end of the two tension steels 7 is inserted on both sides of the inside of the clamp 6, and the one end of the two tension steels 7 is threadedly connected with bolts 9, and both ends of multiple bolts 9 are threadedly connected to the inside of the clamp 6, and threaded holes for the bolts 9 to pass through are opened on the tension steel 7 and the clamp 6.
[0035] The earth at the top of the pipe pile column 1 is excavated, the height is determined according to the elevation reference point, and the pile head of the pipe pile column 1 is cut according to the measurement data. Then, the steel column cap 2 is sleeved onto the outside of the top of the pipe pile, and two square steels 3 are placed on both sides of the top of the steel column cap 2, and the square steels 3 are fixed to the top of the steel column cap 2 by double-sided welding, so that the two square steels 3 and the steel column cap 2 form a groove, and the steel column cap 2 is rotated to align the angle of the groove formed by the two square steels 3 with the steel support beam 4, and the steel support beam 4 is placed inside the groove formed by the two square steels 3.
[0036] The tension steel 7 is clamped to the outside of the square steel 3, and the two parts of the hoop 6 are placed on both sides of the pipe pile column 1 for docking and clamping the bottom end of the tension steel 7, and the hoop 6 is fixed to the outside of the pipe pile column 1 with a bolt 9. At the same time, the tension steel 7 is fixed (the bolt 9 is inserted from the threaded hole on the stirrup on one side, and then inserted into the threaded hole on the tension steel 7, and then extended out of the threaded hole on the stirrup on the other side and tightened to fix the stirrup and the tension steel 7). The steel column cap 2 can be limited by the fixed tension steel 7 to prevent the steel column cap 2 from moving due to external force. In this way, the connection method between the pipe pile column 1 and the steel support beam 4 is optimized, which is convenient for the installation of the staff and the rapid adjustment and positioning of the steel column cap 2, thereby improving the integrity of the connection position between the pipe pile column 1 and the steel support beam 4 and greatly reducing the construction time. It solves the problem of long assembly time of the traditional pipe pile column 1 and the steel support beam 4 and easy deformation of the steel bracket at the connection node, and can ensure the stability and safety of the connection process between the pipe pile column 1 and the steel support beam 4.
[0037] A rubber strip 8 is fixedly connected to one side of the clamp 6, and the rubber strip 8 is used to increase the friction between the clamp 6 and the pipe pile column 1, so as to prevent the inside of the clamp 6 from being too smooth and being displaced due to external force.
[0038] The front and rear ends of the steel support beam 4 are fixedly connected with stiffening ribs 5, which are inserted into the steel support beam 4 and then fixed to both sides of the belly of the steel support beam 4 by welding to strengthen the nodes.
[0039] Slots 11 are provided on both the front and rear sides of the bottom end of the steel support beam 4, and the ends of the two drawn steels 7 close to the square steel 3 are slidably connected inside the slots 11. When the drawn steels 7 are clamped to the outside of the square steel 3, one end of the drawn steels 7 can be extended into the slots 11 to preliminarily fix the drawn steels 7.
[0040] Two positioning grooves 12 are provided on both the front and rear sides of the top of the steel column cap 2, and positioning rods 19 are slidably connected inside the multiple positioning grooves 12. The top ends of the multiple positioning rods 19 are respectively fixedly connected to the two ends of the square steel 3. When the square steel 3 is placed on the top of the steel column cap 2, the positioning rods 19 can be extended into the positioning grooves 12 to preliminarily fix the square steel 3.
[0041] The two sides of the steel column cap 2 are fixedly connected to the fixing frame 10, and one side of the two fixing frames 10 and the two sides of the steel column cap 2 are provided with through holes for the sleeve 13 to pass through. The two fixing frames 10 are rotatably connected with connecting rods 15 inside, and the outer sides of one end of the two connecting rods 15 are slidably connected with the sleeves 13. The other ends of the two sleeves 13 penetrate the fixing frame 10 and the side walls of the steel column cap 2. The other ends of the two connecting rods 15 are surrounded by springs 16, and the other ends of the two springs 16 are fixedly connected to one side of the fixing frame 10. After the steel column cap 2 is sleeved to the outside of the pipe pile column 1, the spring 16 can be used to push the two sleeves 13 to penetrate the fixing frame 10 and the steel column cap 2 (that is, the two sleeves 13 respectively pass through the through holes on the two fixing frames 10 and the through holes on both sides of the steel column cap 2 in turn), and contact the two sides of the pipe pile column 1 to preliminarily position the steel column cap 2. The end of the sleeve 13 in contact with the pipe pile column 1 is provided with a convex pattern, which can increase the friction between the sleeve 13 and the pipe pile column 1.
[0042] A sliding groove 18 is provided on the outside of the two connecting rods 15. The sliding groove 18 is curved and opened on the outside of the connecting rod 15. A handle 17 is fixedly connected to the outside of one end of the two pull rods away from the sleeve 13. Screws 14 are slidably connected inside the two sliding grooves 18. The other ends of the two screws 14 are threadedly connected inside the sleeve 13. When the handle 17 is rotated by hand, the connecting rod 15 rotates, and the screw 14 slides in the sliding groove 18 toward the end close to the handle 17. As the screw 14 slides in the sliding groove 18, the sleeve 13 can be pulled back into the fixing frame 10, thereby releasing the positioning of the sleeve 13 on the steel column cap 2. When the screw 14 slides into the corner of the sliding groove 18, the retracted sleeve 13 can be limited and fixed.
[0043] Working principle: Dig up the earth at the top of the pipe pile column 1, then determine the height according to the elevation reference point, then cut the pile head of the pipe pile column 1 according to the measurement data, then put the steel column cap 2 on the outside of the top of the pipe pile, and place two square steels 3 on both sides of the top of the steel column cap 2, and fix the square steel 3 to the top of the steel column cap 2 by double-sided welding to form a groove with the steel column cap 2, then rotate the steel column cap 2 to adjust the angle of the groove, and place the steel support beam 4 into the groove formed by the two square steels 3, then turn the handle 17 to make the screw 14 slide inside the slide groove 18, when the screw 14 slides out of the corner of the slide groove 18 and moves along with the connecting rod 15 The rotating screw 14 will move inside the slide groove 18 toward the end of the connecting rod 15 close to the sleeve 13, so that the spring 16 can push the sleeve 13 to penetrate the fixing frame 10 and the steel column cap 2, and contact the two sides of the pipe pile column 1 to preliminarily position the steel column cap 2, and place the steel support beam 4 into the groove formed by the two square steels 3. At the same time, the tension steel 7 is clamped to the outside of the square steel 3 and the two parts of the clamp 6 are respectively placed on both sides of the pipe pile column 1 to clamp the bottom end of the tension steel 7. The clamp 6 is fixed to the outside of the pipe pile column 1 with bolts 9 and the tension steel 7 is fixed at the same time. The steel column cap 2 can be limited by the fixed tension steel 7 to prevent the steel column cap 2 from moving due to external force.
[0044] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A position control structure for a concrete pipe pile column, characterized in that: include A pipe pile column (1), wherein a steel column cap (2) is sleeved on the top end of the pipe pile column (1); Square steel (3), the square steel (3) being arranged on the top of the steel column cap (2); A steel support beam (4) is arranged on the top of the steel column cap (2); A hoop (6) is sleeved on the outside of the pipe pile column (1), and a tension steel (7) is clamped on the outside of the square steel (3). One end of the tension steel (7) is inserted into the inside of the hoop (6). A bolt (9) is threadedly connected to the inside of one end of the tension steel (7). Both ends of the bolt (9) are threadedly connected to the inside of the hoop (6). The tension steel (7) is used to restrict the steel column cap (2).
2. A position control structure for a concrete pipe pile column according to claim 1, characterized in that: One side of the clamp (6) is fixedly connected to a rubber strip (8).
3. A position control structure for a concrete pipe pile column according to claim 1, characterized in that: The front and rear ends of the steel support beam (4) are both fixedly connected with stiffening ribs (5), and the stiffening ribs (5) are used to increase the strength of the steel support beam (4).
4. A position control structure for a concrete pipe pile column according to claim 1, characterized in that: A slot (11) is provided at the bottom end of the steel support beam (4), and one end of the tension steel (7) close to the square steel (3) is slidably connected inside the slot (11), and the slot (11) is used to fix the tension rod.
5. A position control structure for a concrete pipe pile column according to claim 1, characterized in that: It also includes a positioning groove (12) which is opened at the top of the steel column cap (2), a positioning rod (19) is slidably connected inside the positioning groove (12), one end of the positioning rod (19) is fixedly connected to the bottom end of the square steel (3), and the positioning rod (19) is used to fix the square steel (3).
6. A position control structure for a concrete pipe pile column according to claim 1, characterized in that: One side of the steel column cap (2) is fixedly connected to a fixing frame (10), the fixing frame (10) is rotatably connected to a connecting rod (15) inside, one end of the connecting rod (15) is slidably connected to a sleeve (13) outside, one end of the sleeve (13) passes through the fixing frame (10) and the steel column cap (2) in sequence, and a spring (16) is wrapped around the outside of the connecting rod (15), and the spring (16) is used to provide elastic force to the sleeve (13).
7. A position control structure for a concrete pipe pile column according to claim 6, characterized in that: A sliding groove (18) is provided on the outside of the connecting rod (15); a handle (17) is fixedly connected to the outside of one end of the connecting rod (15) away from the sleeve (13); a screw (14) is slidably connected inside the sliding groove (18); one end of the screw (14) is threadedly connected to the inside of the sleeve (13).