Tombstone mounting structure
By adopting the fixed hole structure of the base, monument and tombstone in the tombstone installation structure, combined with ribbed steel bars and stainless steel tenon parts, the problem of fragile structure of the existing tombstone tenon parts is solved, and a more solid and resource-saving tombstone installation effect is achieved.
Patent Information
- Application Number
- CN202421001850.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-05-10
AI Technical Summary
Due to the natural brittleness of the stone, the mortise structure of the existing tombstone is easily damaged during the carving and transportation process, resulting in the entire monument being invalidated and the waste of natural stone resources.
The fixed hole structure of the base, the stele seat and the tombstone is adopted. Through the combination of ribbed steel bars and stainless steel tenons, the firm connection between the stele seat and the base and the tombstone and the stele seat is achieved, avoiding the fragility of the traditional tenon-and-joint structure.
It improves the firmness of the tombstone installation, reduces the stone loss rate, reduces the waste of stone resources, and solves the error and uneven problems of traditional mortise structures during carving and installation.
Smart Images

Figure CN222576297U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tomb products, in particular to a tombstone installation structure. Background Art
[0002] Regarding the installation of tombstones, most of the mortise and tenon parts of tombstones are made by integral carving. Due to the natural brittleness of the stone, the mortise and tenon structure is not easy to be successfully carved, and there is also loss during transportation. Once damaged, the entire tombstone will be scrapped, and natural stone resources will be seriously wasted.
[0003] Secondly, the existing connection structure between the tombstone and the base is composed of an inverted trapezoidal tenon at the bottom of the tombstone, a tenon groove slightly larger than the tenon excavated at the top of the base, a rectangular tenon and a tenon groove excavated at the bottom of the base with a length and width slightly larger than the tenon and a height half of the tenon. When the tombstone is installed, the tenon is inserted into the tenon groove from top to bottom, and the installation is completed.
[0004] Due to the natural brittleness of stone, the mortise and tenon structure is not easy to carve successfully, and there is also loss during transportation. If it is damaged, the entire stele will be scrapped, and natural stone resources will be seriously wasted. Utility Model Content
[0005] The utility model aims to provide a tombstone installation structure to solve the problem of fragility of the mortise and tenon joint structure in the prior art.
[0006] The utility model provides the following technical solutions:
[0007] A tombstone installation structure includes a base, wherein the base is buried under the ground and has a first fixing hole on the surface;
[0008] A monument base, the monument base is arranged above the base, a second fixing hole is arranged on the setting surface of the monument base, the second fixing hole penetrates the monument base, and the first fixing member is inserted into the second fixing hole to connect with the base;
[0009] The tombstone is located above the tombstone base, and a third fixing hole is arranged at the bottom. A second fixing piece is inserted into the third fixing hole to be connected with the tombstone base.
[0010] Preferably, the first fixing hole and the second fixing hole are located on the same straight line in the longitudinal direction;
[0011] Preferably, the second fixing hole and the third fixing hole are located on the same straight line in the longitudinal direction;
[0012] Preferably, the number of the first fixing hole, the second fixing hole and the third fixing hole are all 2.
[0013] Preferably, the second fixing hole is filled with cement mortar.
[0014] Preferably, the second fixing member is a solid column tenon member.
[0015] Preferably, the first fixing member is a ribbed steel bar.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] The utility model is mainly composed of four parts: a tombstone, a monument base and a pedestal. Firstly, the installation structure of the monument base and the underground foundation adopts ribbed steel bars, which are more firm than the traditional method of using stone materials and are easier to level during installation.
[0018] Secondly, the use of stainless steel tenons between the tombstone and the base has a much lower stone loss rate than the traditional one-piece stone tenon method, which effectively reduces the waste of stone resources. In the traditional method, the tenon and mortise structure is prone to errors during carving, resulting in the tombstone and the base not being completely fitted and not being flat. The utility model avoids this problem due to its low drilling difficulty and high dimensional accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is the front view of the utility model.
[0020] Figure 2 It is a side view of the utility model.
[0021] Figure 3 It is a side sectional view of the utility model.
[0022] The following are the descriptions of the reference numerals:
[0023] Base-1; tombstone base-2; tombstone-3; first fixing member-21; second fixing member-31; stone box-4; cover plate-41. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.
[0025] like Figure 1-3 As shown, a tombstone installation structure comprises, from bottom to top, a base 1 located below the ground surface, then a pedestal 2 located above the ground surface, and then a tombstone 3.
[0026] Furthermore, the surface of the base 1 is provided with a first fixing hole; the surface of the monument base 2 is provided with a second fixing hole, the second fixing hole penetrates the monument base 2, and the first fixing member 21 is inserted into the second fixing hole to connect with the base 1;
[0027] In this embodiment, the first fixing member 21 is preferably a ribbed steel bar.
[0028] The tombstone 3 is located above the tombstone base 2 , and a third fixing hole is arranged at the bottom thereof. The second fixing member 31 is inserted into the third fixing hole and connected to the tombstone base 2 .
[0029] The first fixing hole, the second fixing hole, and the third fixing hole are conventional technologies, which are known to those skilled in the art, and therefore are not marked in the drawings.
[0030] In this embodiment, the second fixing member 31 is preferably a solid column tenon. To further facilitate assembly and hole opening, the first fixing hole and the second fixing hole are preferably located on the same straight line in the longitudinal direction, and the second fixing hole and the third fixing hole are located on the same straight line in the longitudinal direction; at the same time, the number of the first fixing hole, the second fixing hole, and the third fixing hole are 2 respectively, distributed on the left and right sides of the base 1, the monument base 2, and the tombstone 3.
[0031] like Figure 3 As shown, the utility model comprises five parts: a base 1, a monument base 2, a tombstone 3, a stainless steel solid tenon and a ribbed steel tenon. In addition, a stone box 4 is placed inside the base 1, a cover plate 41 is placed on the upper surface of the stone box 4, a third fixing hole is drilled at the left and right sides of the center of the bottom of the tombstone 3, and a second fixing hole is drilled at the corresponding position on the top of the monument base 2 and penetrates to the bottom. When the monument base 2 is installed, the ribbed steel tenon is inserted from top to bottom into the second fixing hole and penetrates into the first fixing hole of the base 1. After the monument base 2 is initially fixed, the cement mortar 5 is filled in the second fixing hole to a height not exceeding half of the height of the monument base 2. After air drying, the monument base 2 is fixed. When installing the tombstone 3, the upper end of the stainless steel tenon is inserted into the third fixing hole and poured with cement mortar. After air-drying and fixing, a sufficient amount of cement mortar is poured into the second fixing hole until it overflows, and then the stainless steel tenon at the bottom of the tombstone 3 is vertically inserted into the corresponding hole at the top of the tombstone base 2. After ensuring that the tombstone 3 is level and stable, the excess cement mortar is scraped off. After the cement mortar is air-dried, the installation of the tombstone 3 is completed.
[0032] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A tombstone installation structure, characterized in that: include: A base (1), the base (1) being buried under the ground surface and having a first fixing hole arranged on its surface; A monument base (2), the monument base (2) being arranged above the base (1), the monument base (2) being provided with a second fixing hole on its setting surface, the second fixing hole penetrating the monument base (2), the second fixing hole being inserted with a first fixing member (21) to be connected with the base (1); A tombstone (3), the tombstone (3) is located above the tombstone base (2), a third fixing hole is arranged at the bottom, a second fixing member (31) is inserted into the third fixing hole and connected to the tombstone base (2).
2. A tombstone installation structure as claimed in claim 1, characterized in that: The first fixing hole and the second fixing hole are located on the same straight line in the longitudinal direction.
3. A tombstone installation structure as claimed in claim 2, characterized in that: The second fixing hole and the third fixing hole are located on the same straight line in the longitudinal direction.
4. A tombstone installation structure as claimed in claim 3, characterized in that: The number of the first fixing hole, the second fixing hole and the third fixing hole is 2.
5. A tombstone installation structure as claimed in claim 4, characterized in that: The second fixing hole is filled with cement mortar (5).
6. A tombstone installation structure as claimed in claim 1, characterized in that: The first fixing member (21) is a ribbed steel bar.
7. A tombstone installation structure as claimed in claim 1, characterized in that: The second fixing member (31) is a solid column tenon member.