Self-loading, unloading, transferring and storing tool for offshore wind power tower drum
By adopting the synergistic effect of gravity detection components, hydraulic buffer components and clamping components in offshore wind power tower transportation tooling, the automatic core fixing and stable clamping of wind power tower is achieved, solving the problems of missing automatic core fixing, low loading and unloading efficiency and insufficient surface protection in the prior art, and improving transportation stability and loading and unloading efficiency.
Patent Information
- Application Number
- CN202520107988.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2035-01-17
AI Technical Summary
The existing offshore wind power tower transportation tooling lacks automatic core fixing function, has low loading and unloading efficiency, and insufficient protection of the tower surface.
A self-loading, unloading, overhead storage tool for offshore wind power towers is designed, and the synergy between gravity detection components, hydraulic buffer components and clamping components is adopted to realize automatic core fixation and stable clamping of wind power towers.
Through the automatic core fixing function, the tower is ensured to be in the central position during transportation and avoid shaking or collision; the stable clamping method adaptively adjusts the clamping force according to weight, prevents the tower displacement and protects the tower surface, improving transportation stability and loading and unloading efficiency.
Smart Images

Figure CN222592279U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wind power tower transportation, in particular to a self-loading, unloading and transporting storage tool for offshore wind power towers. Background Art
[0002] In offshore wind power projects, the wind turbine tower is the tower pole of wind power generation. It mainly plays a supporting role in the wind turbine generator set and absorbs the vibration of the unit. The tower has a special shape and a large volume. When the tower is transported and stored, it needs to be fixed with special loading and unloading and storage tooling.
[0003] A self-loading, unloading and reversing storage tool for an offshore wind turbine tower disclosed in Chinese patent publication number CN221915519U, the self-loading, unloading and reversing storage tool for an offshore wind turbine tower, through the cooperation of a placement plate, an arc-shaped support plate, fastening bolts, a first multi-stage hydraulic telescopic rod, a clamping plate, a button controller, a first bidirectional hydraulic telescopic rod, an arc-shaped top block, a second bidirectional hydraulic telescopic rod and an arc-shaped clamping block, plays a role in low-center-of-gravity installation and docking of the wind turbine tower.
[0004] However, compared with the prior art in the related field, the prior art has the following disadvantages:
[0005] The defect of lack of automatic centering function: In the existing technology, during the placement of wind turbine towers, workers need to use visual observation and experience to determine whether the tower is in the center position, which makes it difficult to ensure accuracy. As a result, the tower will shake and collide due to position deviation during transportation, increasing the risk of damage to the tower;
[0006] Low loading and unloading efficiency: When loading and unloading wind turbine towers with existing tooling, workers need to manually operate multiple clamping components and adjust their positions and clamping degrees one by one, which makes the loading and unloading process cumbersome and time-consuming;
[0007] Insufficient protection of the tower surface: When traditional tooling is used to clamp the wind turbine tower, it may easily scratch the tower surface due to unreasonable clamping methods, such as concentrated clamping points and uneven pressure. Utility Model Content
[0008] The purpose of the utility model is to overcome the shortcomings of the prior art, solve the problems mentioned in the background technology, and provide a self-loading, unloading, and transportation storage tool for offshore wind power towers.
[0009] The purpose of the utility model is achieved through the following technical solutions: an offshore wind power tower self-loading and unloading storage tool, including an installation box, a gravity detection component is slidably provided in the middle of the installation box, the bottom of the gravity detection component is connected to the installation box through a hydraulic buffer component, the installation box is located on both sides of the gravity detection component and is movably connected with a clamping component, and the two clamping components are connected to the gravity detection component through a transmission component;
[0010] The gravity detection assembly includes a movable part slidably arranged inside the installation box, and a first roller is rotatably arranged on the top of the movable part;
[0011] The transmission assembly comprises a fixed shaft rotatably arranged inside the installation box, a gear is fixedly arranged on the outer surface of the fixed shaft, and racks are fixedly arranged at positions of the movable parts corresponding to the two gears, and the gears are meshed with the racks.
[0012] Preferably, the hydraulic buffer assembly includes a movable rod fixedly installed at the bottom of the movable part, a fixed cylinder containing hydraulic oil is fixedly installed on the bottom surface of the installation box at a position corresponding to the movable rod, the end of the movable rod away from the movable part is slidably arranged inside the fixed cylinder, and the bottom end of the movable rod is connected to the bottom surface of the fixed cylinder by an elastic part.
[0013] Preferably, the clamping assembly includes a support arm movably connected to the interior of the installation box, and a second roller is rotatably provided at one end of the support arm away from the installation box.
[0014] Preferably, the support arm is in an arc shape, and the outer surfaces of the first roller and the second roller are both provided with a flexible layer.
[0015] Preferably, a slide groove is provided on the outer surface of one side of the fixed shaft, and a docking piece is slidably provided inside the slide groove.
[0016] Preferably, a movable groove is opened at the position of the support arm corresponding to the gear, a rotating hole is opened at the position of the support arm corresponding to the fixed shaft, the docking piece is hexagonal in shape, and a docking groove is opened at the position of the support arm corresponding to the docking piece. By utilizing the cooperation between the docking piece and the docking groove, the fixed shaft can drive the support arm to swing.
[0017] Beneficial effects:
[0018] The offshore wind turbine tower self-loading, unloading and reversing storage tooling, by setting a gravity detection component, a clamping component and a hydraulic buffer component, utilizes the synergistic effect of the gravity detection component and the transmission component to trigger the transmission component to control the two arms to retract toward the center, thereby realizing automatic centering of the wind turbine tower and ensuring that the tower is in the center position during transportation. Compared with the existing technology, it can avoid shaking or collision caused by position offset. At the same time, the inward movement of the support arm not only realizes the clamping of the wind turbine tower, but also adaptively adjusts the clamping force according to the weight. This stable clamping method not only effectively prevents the displacement of the tower during transportation, but also avoids scratches on the tower surface caused by excessive or uneven clamping force, further improving the stability of transportation, and making the loading and unloading process of the wind turbine tower faster and more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0020] Figure 1 It is a structural schematic diagram of the utility model;
[0021] Figure 2 This is a schematic diagram of the state of the support arm of the utility model before clamping;
[0022] Figure 3 It is a schematic diagram of the state of the support arm of the utility model when clamping;
[0023] Figure 4 It is a structural schematic diagram of the transmission assembly of the utility model;
[0024] Figure 5 It is a structural schematic diagram of the docking piece of the utility model;
[0025] Figure 6 It is a schematic diagram of the split structure of the support arm and the fixed shaft of the utility model;
[0026] Figure 7 It is a structural schematic diagram of the hydraulic buffer component of the utility model.
[0027] In the figure: 1. installation box; 2. gravity detection component; 201. movable part; 202. first roller; 3. hydraulic buffer component; 301. movable rod; 302. fixed cylinder; 303. elastic part; 4. clamping component; 401. support arm; 4011. docking groove; 402. second roller; 5. transmission component; 501. fixed shaft; 5011. slide groove; 5012. docking part; 502. gear; 503. rack. DETAILED DESCRIPTION
[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0029] Additional aspects and advantages of the present invention will be further described below in conjunction with the accompanying drawings, and some will become apparent from the following description or be learned through practice of the present invention.
[0030] like Figures 1 to 7 As shown, a self-loading, unloading and transporting storage tool for offshore wind turbine towers includes an installation box 1, a gravity detection component 2 is slidably provided in the middle of the installation box 1, the bottom of the gravity detection component 2 is connected to the installation box 1 through a hydraulic buffer component 3, and the installation box 1 is located on both sides of the gravity detection component 2 and is movably connected with clamping components 4, and the two clamping components 4 are connected to the gravity detection component 2 through a transmission component 5; when the wind turbine tower is placed on the gravity detection component 2, gravity is used to make the gravity detection component 2 press down the hydraulic buffer component 3 and slide downward, and when the gravity detection component 2 slides downward, the ends of the two clamping components 4 away from the installation box 1 will be gathered toward the middle of the installation box 1, so that the upper half of the wind turbine tower is clamped by the two clamping components 4, thereby ensuring the stability of the wind turbine tower during transportation.
[0031] like Figures 2 to 4 As shown, the gravity detection assembly 2 includes a movable member 201 slidably disposed inside the installation box 1, and a first roller 202 is rotatably disposed on the top of the movable member 201; Figure 2 , Figure 3 and Figure 7 As shown, the hydraulic buffer assembly 3 includes a movable rod 301 fixedly installed at the bottom of the movable part 201, and a fixed cylinder 302 containing hydraulic oil is fixedly installed on the bottom surface of the interior of the installation box 1 corresponding to the position of the movable rod 301. The end of the movable rod 301 away from the movable part 201 is slidably set in the interior of the fixed cylinder 302, and the bottom end of the movable rod 301 is matched with the bottom surface of the interior of the fixed cylinder 302 through an elastic member 303; the clamping assembly 4 includes a support arm 401 movably connected to the interior of the installation box 1, and the end of the support arm 401 away from the installation box 1 is rotatably provided with a second roller 402; the shape of the support arm 401 is arc-shaped, and the outer surfaces of the first roller 202 and the second roller 402 are both provided with a flexible layer. The first roller 202 and the second roller 402 are provided to facilitate the control of the docking of the wind turbine tower and the equipment, and at the same time, with the flexible layer, scratches on the surface of the wind turbine tower can be avoided.
[0032] like Figures 2 to 4As shown, the transmission assembly 5 includes a fixed shaft 501 rotatably arranged inside the installation box 1, a gear 502 is fixedly arranged on the outer surface of the fixed shaft 501, and racks 503 are fixedly arranged at the positions of the movable member 201 corresponding to the two gears 502, and the gears 502 are meshed with the racks 503. The installation box 1 is provided with rotation holes at both ends of the fixed shaft 501, and both ends of the fixed shaft 501 are matched and connected with the rotation holes through bearings. The provided bearings can reduce the friction force when the fixed shaft 501 rotates, and can also improve the stability of the fixed shaft 501 when rotating; as shown in FIG. Figure 5 and Figure 6 As shown, a slide groove 5011 is provided on the outer surface of one side of the fixed shaft 501, and a docking piece 5012 is slidably provided inside the slide groove 5011; a movable groove is provided at a position of the support arm 401 corresponding to the gear 502, a rotating hole is provided at a position of the support arm 401 corresponding to the fixed shaft 501, the docking piece 5012 is in the shape of a hexagon, a docking groove 4011 is provided at a position of the support arm 401 corresponding to the docking piece 5012, and six edges of the docking piece 5012 close to the docking groove 4011 are all formed into inclined surfaces, and the inclined surfaces are used to facilitate the insertion of the docking piece 5012 into the docking groove 4011, and the cooperation between the docking piece 5012 and the docking groove 4011 enables the fixed shaft 501 to drive the support arm 401 to swing, as shown in FIG. Figures 2 to 6 As shown, when the docking piece 5012 is separated from the docking groove 4011, the fixed shaft 501 can no longer drive the support arm 401 to swing, so that the support arm 401 can be adjusted individually, and when the movable part 201 slides downward, the cooperation between the gear 502 and the rack 503 is utilized to make the ends of the two support arms 401 gather together (the cooperation between the docking piece 5012 and the docking groove 4011 is utilized to make the fixed shaft 501 drive the support arm 401 to swing), so that the upper half area of the wind turbine tower is clamped by the second roller 402 to ensure the stability of the wind turbine tower during transportation; when the wind turbine tower needs to be removed, the docking piece 5012 is controlled to separate from the docking groove 4011. When the docking piece 5012 is separated from the docking groove 4011, the fixed shaft 501 can no longer drive the support arm 401 to swing, so that the support arm 401 can be adjusted individually, and the wind turbine tower can be removed by the hoist at this time.
[0033] The working process is as follows:
[0034] S1: Figure 1 and Figure 4 As shown, when hoisting the wind turbine tower, the wind turbine tower is hoisted by using a hoist to dock with the gravity detection component 2;
[0035] S2: Figures 2 to 4 As shown, when the first roller 202 of the gravity detection assembly 2 contacts the wind turbine tower, the first roller 202 transmits pressure to the movable member 201, causing the movable member 201 to slide downward;
[0036] S3: Figure 2 , Figure 3 and Figure 7 As shown, when the movable member 201 slides downward, the movable rod 301 will shrink toward the inside of the fixed cylinder 302, so that the downward movement of the movable member 201 can be buffered through the cooperation between the hydraulic oil and the elastic member 303, thereby exerting a damping effect on the movable member 201;
[0037] S4: Figures 2 to 4 As shown, when the movable member 201 slides downward, the ends of the two arms 401 are brought together by the cooperation between the gear 502 and the rack 503 (the fixed shaft 501 can drive the arms 401 to swing by the cooperation between the docking member 5012 and the docking groove 4011), so that the upper half of the wind turbine tower is clamped by the second roller 402 to ensure the stability of the wind turbine tower during transportation;
[0038] S5: Figure 4 and Figure 5 As shown, when the wind turbine tower needs to be removed, the docking piece 5012 is controlled to separate from the docking groove 4011. After the docking piece 5012 is separated from the docking groove 4011, the fixed shaft 501 can no longer drive the support arm 401 to swing, so that the support arm 401 can be adjusted separately. At this time, the wind turbine tower can be removed by the hoist.
[0039] S6: In summary, the effects are as follows: automatic centering: through the synergistic effect of the gravity detection component 2 and the transmission component 5, when the wind turbine tower is placed on the tooling platform, the weight detection component 2 slides down due to gravity, triggering the transmission component 5 to control the two arms 401 to retract toward the center. This process realizes the automatic centering of the wind turbine tower, ensuring that the tower is in the center during transportation, avoiding shaking or collision due to position offset;
[0040] Stable clamping: The retraction action of the support arm 401 not only achieves the clamping of the wind turbine tower, but also adaptively adjusts the clamping force according to the weight. This stable clamping method effectively prevents the tower from shifting during transportation, improves the stability of transportation, and even in a bumpy transportation environment, the tower can maintain a firm clamping state, reducing the risk of damage caused by shaking or collision;
[0041] Fast loading and unloading: The automatic clamping function of the tooling makes the loading and unloading process of the wind turbine tower faster and more convenient. There is no need to manually adjust the clamping position and strength, which greatly shortens the loading and unloading time. This not only improves transportation efficiency, but also reduces the additional costs caused by long loading and unloading time;
[0042] Avoid scratches: When the support arm 401 clamps the wind turbine tower, the contact area with the tower surface is large and the pressure is uniform. This clamping method avoids scratches on the tower surface caused by excessive or uneven clamping force. At the same time, the design of the tooling and the material selection also ensure that the tower surface will not be damaged, protecting the surface quality of the tower;
[0043] S7: Figure 2 , Figure 3 , Figure 4 and Figure 7 As shown, after the wind turbine tower is removed, the hydraulic buffer assembly 3 can be used to control the gravity detection assembly 2 to reset.
[0044] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. An offshore wind power tower self-loading and unloading storage tool, characterized by: It comprises an installation box (1), wherein a gravity detection component (2) is slidably provided in the middle of the installation box (1), the bottom of the gravity detection component (2) is connected to the installation box (1) through a hydraulic buffer component (3), and the installation box (1) is movably connected to clamping components (4) on both sides of the gravity detection component (2), and the two clamping components (4) are connected to the gravity detection component (2) through a transmission component (5); The gravity detection component (2) comprises a movable part (201) slidably arranged inside the installation box (1), and a first roller (202) is rotatably provided at the top end of the movable part (201); The transmission assembly (5) comprises a fixed shaft (501) rotatably arranged inside the installation box (1), a gear (502) being fixedly arranged on the outer surface of the fixed shaft (501), and racks (503) being fixedly arranged at positions of the movable member (201) corresponding to the two gears (502), and the gears (502) are meshed with the racks (503).
2. The offshore wind power tower self-loading and unloading storage tooling according to claim 1 is characterized by: The hydraulic buffer assembly (3) comprises a movable rod (301) fixedly mounted at the bottom of the movable part (201); a fixed cylinder (302) containing hydraulic oil is fixedly mounted on the bottom surface of the installation box (1) at a position corresponding to the movable rod (301); one end of the movable rod (301) away from the movable part (201) is slidably arranged inside the fixed cylinder (302); and the bottom end of the movable rod (301) is matched with the bottom surface of the fixed cylinder (302) via an elastic member (303).
3. The offshore wind power tower self-loading and unloading storage tooling according to claim 2 is characterized by: The clamping assembly (4) comprises a support arm (401) movably connected to the interior of the installation box (1); a second roller (402) is rotatably provided at one end of the support arm (401) away from the installation box (1).
4. The offshore wind power tower self-loading and unloading storage tooling according to claim 3 is characterized by: The support arm (401) is in an arc shape, and the outer surfaces of the first roller (202) and the second roller (402) are both provided with a flexible layer.
5. The offshore wind power tower self-loading and unloading storage tooling according to claim 4 is characterized by: A sliding groove (5011) is provided on the outer surface of one side of the fixed shaft (501), and a docking piece (5012) is slidably provided inside the sliding groove (5011).
6. The offshore wind power tower self-loading and unloading storage tooling according to claim 5 is characterized by: The support arm (401) is provided with a movable groove at a position corresponding to the gear (502), the support arm (401) is provided with a rotating hole at a position corresponding to the fixed shaft (501), the docking piece (5012) is hexagonal in shape, and the support arm (401) is provided with a docking groove (4011) at a position corresponding to the docking piece (5012), and the fixed shaft (501) can drive the support arm (401) to swing by virtue of the cooperation between the docking piece (5012) and the docking groove (4011).
Citation Information
Patent Citations
Self-loading, unloading, transferring and storing tool for offshore wind power tower drum
CN221915519U