Bulk material loading device

By designing a liftable fabric device in the bulk material loading device, the problems of material spilling and dust are solved, and a more stable and reliable loading process is achieved.

CN222592878UActive Publication Date: 2025-03-11SHANXI LONGSHUN NEW ENERGY MATERIALS TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423028250.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-11
Estimated Expiration
2034-12-09

AI Technical Summary

Technical Problem

In the existing bulk material loading device, the fabric device is highly fixed, resulting in large distances between the material and the bottom of the car, which is prone to spilling and dust.

Method used

A liftable fabric device is designed. Driven by a lifting rack and belt drive, it can be lifted and adjusted according to needs, ensuring that it is maintained at an appropriate distance from the bottom of the car, and using it in conjunction with the telescopic discharge pipe to maintain the appropriate distance between the fabric device and the discharge hopper.

Benefits of technology

It effectively reduces the spilling and dust of materials, improves the stability and reliability of loading, and reduces the demand for manual operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222592878U_ABST
    Figure CN222592878U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of loading devices, and particularly relates to a bulk material loading device which comprises a supporting vertical frame, a climbing belt conveyor and a weighing belt conveyor, a frame body of the climbing belt conveyor is fixedly connected with the supporting vertical frame, the weighing belt conveyor is located on the feeding side of the climbing belt conveyor, a discharging hopper is arranged on the supporting vertical frame, and the weighing belt conveyor is located on the feeding side of the climbing belt conveyor. The discharging hopper is located below the discharging side of the climbing belt conveyor. A liftable material distributing device is arranged on the supporting vertical frame, the material distributing device is located below the discharging hopper, and a control valve and a telescopic discharging pipe are arranged at the bottom of the discharging hopper. The liftable material distributing device is arranged on the supporting vertical frame and can be adjusted in a lifting mode according to needs so as to ensure that a proper distance is kept between the material distributing device and the bottom of the carriage, and therefore throwing and dust raising are reduced. And meanwhile, the telescopic discharging pipe is matched to correspondingly stretch out and draw back, so that a proper distance is always kept between the discharging hopper and the material distributing device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of vehicle loading devices, and in particular relates to a vehicle loading device for bulk materials. Background Art

[0002] Bulk material loading device is a device used to load bulk materials (such as powdery and granular materials) into transport vehicles efficiently and accurately. This device is widely used in industries such as mining, coal, and cement to improve loading efficiency, reduce manual operations, and ensure loading quality.

[0003] Bulk material loading devices are usually composed of multiple components, including conveying systems, weighing systems, control systems, and vehicle positioning systems. These systems work together to achieve fast and accurate loading. For example, in a car bulk material loading system, accurate weighing and vehicle positioning can ensure the accuracy and uniformity of the load, thereby improving the stability and reliability of loading.

[0004] Meanwhile, the existing bulk material loading device is usually provided with a material distribution device 7 to ensure uniform distribution of the material in the compartment. However, the common material distribution device 7 has a fixed height, and in the initial loading stage, the distance between the material and the bottom of the compartment is large, which may cause problems of spillage and dust. Utility Model Content

[0005] In view of the above technical problems, the utility model provides a bulk material loading device, which is provided with a liftable material distribution device 7, which can reduce the spillage of materials and the generated dust.

[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0007] A bulk material loading device comprises a supporting frame, a climbing belt conveyor and a weighing belt conveyor, wherein the frame of the climbing belt conveyor is fixedly connected to the supporting frame, the weighing belt conveyor is located at the feeding side of the climbing belt conveyor, the supporting frame is provided with a discharge hopper, and the discharge hopper is located below the unloading side of the climbing belt conveyor; the supporting frame is provided with a liftable material distribution device, and the material distribution device is located below the discharge hopper, and a control valve and a telescopic discharge pipe are provided at the bottom of the discharge hopper.

[0008] The material distribution device includes a lifting frame and a belt conveyor; a lifting mechanism is provided between the lifting frame and the supporting frame, and the lifting frame is driven to move up and down by the lifting mechanism; the frame of the belt conveyor is connected to the lifting frame, and a driving mechanism is provided on the lifting frame, and the driving mechanism is used to drive the belt conveyor to move horizontally and drive the active roller of the belt conveyor to rotate.

[0009] The driving mechanism includes a driving cylinder, a driving gear and a driving rack; the frame of the belt conveyor is slidably connected to the lifting frame, the two ends of the driving cylinder are respectively fixedly connected to the frame of the belt conveyor and the lifting frame, the driving gear is coaxially fixed to the active roller, and the driving rack is fixedly connected to the lifting frame and meshes with the driving gear.

[0010] The lower end of the telescopic discharge pipe is fixedly connected to the lifting frame.

[0011] The weighing belt conveyor is located above the feeding side of the climbing belt conveyor; a plurality of partitions are evenly distributed on the belt of the climbing belt conveyor, and the partitions can contact the belt of the weighing belt conveyor.

[0012] A discharge hopper is arranged between the discharge hopper and the unloading side of the climbing belt conveyor. The discharge hopper is slidably connected with the supporting frame. A reciprocating mechanism is arranged between the discharge hopper and the driving roller of the climbing belt conveyor.

[0013] The reciprocating mechanism adopts a crank-connecting rod mechanism.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] The supporting frame is equipped with a lifting material distribution device, which can be raised and lowered as needed to ensure that it maintains an appropriate distance from the bottom of the carriage, thereby reducing scattering and dust. At the same time, the telescopic discharge pipe is extended and retracted accordingly to ensure that the discharge hopper and the material distribution device always maintain an appropriate distance.

[0016] The structural arrangement of the driving mechanism in the material distributing device can not only drive the weighing belt conveyor to move horizontally for distributing materials, but also drive the weighing belt conveyor to work.

[0017] The discharge hopper is driven by a reciprocating mechanism, which can make the material evenly distributed in the discharge hopper. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of one direction of the utility model;

[0019] Figure 2 yes Figure 1 A partial enlarged view of the middle A;

[0020] Figure 3 It is the front view of the utility model;

[0021] Figure 4 It is a structural schematic diagram of the material distributing device of the utility model in one direction;

[0022] Figure 5 It is a structural schematic diagram of the material distributing device of the utility model in another direction;

[0023] Among them: 1 is a supporting frame, 2 is a climbing belt conveyor, 3 is a weighing belt conveyor, 4 is a loading side, 5 is a unloading side, 6 is a discharge hopper, 7 is a material distribution device, 8 is a control valve, 9 is a telescopic discharge pipe, 10 is a lifting frame, 11 is a belt conveyor, 12 is a lifting mechanism, 13 is a driving cylinder, 14 is a driving gear, 15 is a driving rack, 16 is a partition, 17 is a discharge hopper, 18 is a crank, and 19 is a connecting rod. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present utility model are described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments.

[0025] like Figure 1-5 As shown, a bulk material loading device comprises a supporting frame 1, a climbing belt conveyor 2 and a weighing belt conveyor 3, wherein the frame of the climbing belt conveyor 2 is fixedly connected to the supporting frame 1. During installation, the supporting frame 1 can be set at a weighbridge, and the vehicle is driven to the weighbridge for loading.

[0026] The weighing belt conveyor 3 is located at the feeding side 4 of the climbing belt conveyor 2, and a discharge hopper 6 is provided on the supporting frame 1, and the discharge hopper 6 is located below the discharge side 5 of the climbing belt conveyor 2. The material is first transported to the feeding side 4 of the climbing belt conveyor 2 by the weighing belt conveyor 3, and then transported to the discharge side 5 by the climbing belt conveyor 2, and finally falls into the discharge hopper 6.

[0027] A liftable material distribution device 7 is provided on the supporting frame 1, and the material distribution device 7 is located below the discharge hopper 6. A control valve 8 and a telescopic discharge pipe 9 are provided at the bottom of the discharge hopper 6. The control valve 8 can be opened to discharge the material in the discharge hopper 6 to the material distribution device 7, and the material is loaded and distributed through the material distribution device 7.

[0028] When in use, the vehicle stops on the scale, then the climbing belt conveyor 2, the weighing belt conveyor 3 and the control valve 8 are turned on; according to the actual situation, the material distribution device 7 is lowered to an appropriate height to distribute the material. As the material is continuously discharged, the material distribution device 7 is raised according to the height of the material in the vehicle. In this way, it can be ensured that the material distribution device 7 maintains an appropriate distance from the bottom of the vehicle, reducing the phenomenon of material spillage and dust during the material distribution process.

[0029] Furthermore, the material distributing device 7 includes a lifting frame 10 and a belt conveyor 11; the frame of the belt conveyor 11 is connected to the lifting frame 10, and a lifting mechanism 12 is provided between the lifting frame 10 and the supporting frame 1, and the lifting frame 10 and the belt conveyor 11 are driven to move up and down by the lifting mechanism 12. The lifting mechanism 12 can be a screw lift or a telescopic cylinder; if a telescopic cylinder is used, at least two telescopic cylinders are provided, and the two ends of the telescopic cylinder are fixedly connected to the frames of the lifting frame 10 and the belt conveyor 11 respectively.

[0030] A driving mechanism is provided on the lifting frame 10, and the driving mechanism drives the belt conveyor 11 to move horizontally and drives the driving roller of the belt conveyor 11 to rotate, thereby driving the belt of the belt conveyor 11 to rotate to achieve material distribution.

[0031] The above-mentioned climbing belt conveyor 2, weighing belt and belt conveyor 11 are all common devices in the prior art, and are mainly composed of a driving roller, a driven roller and a frame. The driving roller and the driven roller are both rotatably connected to the frame, and the belt is wrapped between the driving roller and the driven roller. The climbing belt conveyor 2 and the driving roller in the weighing belt in this device are connected to a motor, that is, the motor drives each belt to rotate. The belt conveyor 11 in the material distribution device 7 is driven by a driving mechanism, and is driven by a motor, which is specifically implemented by the following structure:

[0032] The driving mechanism includes a driving cylinder 13, a driving gear 14 and a driving rack 15; the frame of the belt conveyor 11 is slidably connected to the lifting frame 10, the two ends of the driving cylinder 13 are respectively fixedly connected to the frame of the belt conveyor 11 and the lifting frame 10, the driving gear 14 is coaxially fixed to the active roller, and the driving rack 15 is fixedly connected to the lifting frame 10 and meshed with the driving gear 14. When the driving cylinder 13 is continuously extended and retracted, it can drive the frame of the belt conveyor 11 to move, so that the driving gear 14 and the driving rack 15 are meshed, and then the active roller in the belt conveyor 11 is driven to rotate, thereby realizing the rotation of the belt thereon to perform the material laying operation.

[0033] Furthermore, the lower end of the telescopic discharge pipe 9 is fixedly connected to the lifting frame 10, and the upper end of the telescopic discharge pipe 9 is fixedly connected to the control valve 8. The material flows into the telescopic discharge pipe 9 through the control valve 8. The telescopic discharge pipe 9 can be set with a common telescopic pipe structure, and of course, a bellows can also be used. When the lifting frame 10 moves up and down, the lower end of the telescopic discharge pipe 9 can be driven to move accordingly, so that the distance between the bottom of the telescopic discharge pipe 9 and the belt conveyor 11 is always kept fixed.

[0034] Furthermore, the weighing belt conveyor 3 is located above the feeding side 4 of the climbing belt conveyor 2; a plurality of partitions 16 are evenly distributed on the belt of the climbing belt conveyor 2, and the partitions 16 can contact the belt of the weighing belt conveyor 3; that is, the partitions 16 can scrape off the material attached to the belt of the weighing belt conveyor 3 and transport it out through the climbing belt conveyor 2.

[0035] Furthermore, in order to prevent the material discharged from the climbing belt conveyor 2 from being unevenly distributed in the discharge hopper 6, a discharge hopper 17 is provided between the discharge hopper 6 and the unloading side 5 of the climbing belt conveyor 2. The discharge hopper 17 is slidably connected to the supporting frame 1, and a reciprocating movement mechanism is provided between the discharge hopper 17 and the active roller of the climbing belt conveyor 2.

[0036] The material discharged by the climbing belt conveyor 2 first passes through the discharge hopper 17 and then falls into the discharge hopper 6; the discharge hopper 17 is driven to reciprocate horizontally by the reciprocating mechanism, so that the material can be more evenly distributed in the discharge hopper 6.

[0037] Furthermore, the reciprocating mechanism preferably adopts a crank-connecting rod mechanism, which includes a crank 18 and a connecting rod 19, one end of the crank 18 is fixedly connected to the driving roller of the climbing belt conveyor 2, and the two ends of the connecting rod 19 are respectively rotatably connected to the discharge hopper 17 and the other end of the crank 18. The crank 18 is driven to rotate by the rotation of the driving roller of the climbing belt conveyor 2, thereby realizing the reciprocating movement of the discharge hopper 17.

[0038] Only the preferred embodiments of the present invention are described in detail above, but the present invention is not limited to the above embodiments.

Claims

1. A bulk material loading device, characterized in that: The invention comprises a supporting frame (1), a climbing belt conveyor (2) and a weighing belt conveyor (3), wherein the frame of the climbing belt conveyor (2) is fixedly connected to the supporting frame (1), the weighing belt conveyor (3) is located on the feeding side (4) of the climbing belt conveyor (2), and the supporting frame (1) is provided with a discharge hopper (6), which is located below the unloading side (5) of the climbing belt conveyor (2); the supporting frame (1) is provided with a liftable material distribution device (7), which is located below the discharge hopper (6), and the bottom of the discharge hopper (6) is provided with a control valve (8) and a telescopic discharge pipe (9).

2. A bulk material loading device according to claim 1, characterized in that: The material distributing device (7) comprises a lifting frame (10) and a belt conveyor (11); a lifting mechanism (12) is provided between the lifting frame (10) and the supporting frame (1), and the lifting frame (10) is driven to move up and down by the lifting mechanism (12); the frame body of the belt conveyor (11) is connected to the lifting frame (10), and a driving mechanism is provided on the lifting frame (10), and the driving mechanism is used to drive the belt conveyor (11) to move horizontally and to drive the active roller of the belt conveyor (11) to rotate.

3. A bulk material loading device according to claim 2, characterized in that: The driving mechanism comprises a driving cylinder (13), a driving gear (14) and a driving rack (15); the frame of the belt conveyor (11) is slidably connected to the lifting frame (10), the two ends of the driving cylinder (13) are respectively fixedly connected to the frame of the belt conveyor (11) and the lifting frame (10), the driving gear (14) is coaxially fixed to the active roller, and the driving rack (15) is fixedly connected to the lifting frame (10) and meshes with the driving gear (14).

4. A bulk material loading device according to claim 2, characterized in that: The lower end of the telescopic discharge pipe (9) is fixedly connected to the lifting frame (10).

5. The bulk material loading device according to claim 1, characterized in that: The weighing belt conveyor (3) is located above the feeding side (4) of the climbing belt conveyor (2); a plurality of partitions (16) are evenly distributed on the belt of the climbing belt conveyor (2), and the partitions (16) can contact the belt of the weighing belt conveyor (3).

6. A bulk material loading device according to claim 1, characterized in that: A discharge hopper (17) is provided between the discharge hopper (6) and the unloading side (5) of the climbing belt conveyor (2); the discharge hopper (17) is slidably connected to the supporting frame (1); and a reciprocating mechanism is provided between the discharge hopper (17) and the driving roller of the climbing belt conveyor (2).

7. A bulk material loading device according to claim 6, characterized in that: The reciprocating mechanism adopts a crank-connecting rod mechanism.