Rapid construction device for anti-skid grooving of tunnel bottom plate

By designing a fast construction device for anti-slip grooves of tunnel floor including support frame, groove steel bar, operating square pipe and supporting angle iron, the problem of low construction efficiency of anti-slip measures in the construction of large-slope tunnel floor is solved, and efficient and rapid construction results are achieved.

CN222594547UActive Publication Date: 2025-03-11SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420902309.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-03-11
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

The existing technology has low construction efficiency, time-consuming and labor-intensive construction in the construction of large-slope tunnel base plates, and is not highly targeted, and the construction progress is slow.

Method used

A fast construction device for anti-slip groove engraving of tunnel base plate is designed, including support frame, groove rebar, operating square pipe and support angle iron, which forms an overall structure through welding to improve construction efficiency.

Benefits of technology

This device greatly improves work efficiency, improves the turnover rate of the grooved steel bars, reduces construction costs, and ensures the construction speed and molding quality of the anti-slip groove of the bottom plate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222594547U_ABST
    Figure CN222594547U_ABST
Patent Text Reader

Abstract

The utility model relates to an anti-skid grooving rapid construction device for a tunnel bottom plate, which belongs to the field of construction of large-gradient inclined shafts in water conservancy projects and comprises a support framework, grooving steel bars (4), operation square tubes (5) and support angle irons (6). The supporting framework is a rectangular frame formed by welding first angle iron (1), second angle iron (2) and third angle iron (3), the grooving steel bar (4) and the supporting framework are welded into a whole, and the supporting angle iron (6) and the operation square pipe (5) are welded into a whole with the first angle iron (1). According to the utility model, the construction speed of the anti-skid measure of the water conservancy large-gradient tunnel bottom plate can be increased, the forming quality after the anti-skid measure construction of the large-gradient tunnel bottom plate is ensured, the labor investment is reduced, the construction efficiency is improved, and the cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water conservancy tunnel engineering construction, and in particular relates to a tunnel bottom plate anti-skid grooving rapid construction device. Background Art

[0002] In order to give full play to the coordinated development of water conservancy facilities construction and the life safety of operators, the requirements for anti-skid construction of steep slope tunnel bottom plates are high. The traditional anti-skid construction of steep slope tunnel bottom plates uses a single steel bar for grooving, which has low work efficiency and is time-consuming and labor-intensive. At present, the anti-skid construction of steep slope tunnel bottom plates of water conservancy uses threaded steel bars and steel pipes. These technologies are controllable for the construction technology of anti-skid measures for tunnel bottom plates, but they are not very targeted and the construction progress is slow. Therefore, it is necessary to provide a safe and simple anti-skid grooving rapid construction device for tunnel bottom plates. Summary of the invention

[0003] In order to overcome the problems existing in the background technology, the utility model provides a tunnel bottom plate anti-skid grooving rapid construction device, which can improve the speed of anti-skid grooving construction of the bottom plate of water conservancy tunnel construction, ensure the molding quality of anti-skid measures on the bottom plate of steep tunnels, reduce labor input, and reduce construction costs.

[0004] To achieve the above purpose, the utility model is implemented through the following technical solutions:

[0005] A fast construction device for anti-skid grooving of tunnel bottom plate comprises a supporting frame, grooved steel bars, an operating square tube and a supporting angle iron; the supporting frame is a rectangular frame welded from angle iron one, angle iron two and angle iron three, the grooved steel bars are welded to the supporting frame as a whole, and the supporting angle iron and the operating square tube are respectively welded to angle iron one as a whole.

[0006] Beneficial effects of the utility model:

[0007] The use of the tunnel floor anti-skid grooving rapid construction device of the utility model greatly improves work efficiency, while also increasing the utilization turnover rate of the grooved steel bars, reducing construction costs, increasing the construction speed of the tunnel floor anti-skid grooving, and ensuring the overall effect of the floor anti-skid grooving. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1 It is a schematic diagram of the plane structure of the utility model.

[0009] Figure 2 It is a schematic elevation view of the utility model.

[0010] In the figure, 1-angle iron one, 2-angle iron two, 3-angle iron three, 4-grooved steel bars, 5-operating square tube, 6-supporting angle iron. DETAILED DESCRIPTION

[0011] The present invention will be described in detail below with reference to the accompanying drawings.

[0012] like Figure 1 As shown, a tunnel floor anti-skid grooving rapid construction device includes a supporting frame, grooved steel bars 4, an operating square tube 5, and a supporting angle iron 6; the supporting frame is a rectangular frame welded from angle iron one, angle iron two, and angle iron three, the grooved steel bars 4 are welded to the supporting frame as a whole, and the supporting angle iron 6 and the operating square tube 5 are respectively welded to the angle iron one as a whole.

[0013] The angle irons 1, 2 and 3 of the support frame are welded with 4*4cm angle irons, the grooved steel bars 4 are welded with C25 threaded steel bars and the support frame, the operating square tube 5 is welded with a 10*10 stainless steel square tube in the middle of the support frame, and the supporting angle iron 6 is welded with the support frame.

[0014] When in use, the tunnel floor anti-skid grooving rapid construction device is placed on the tunnel floor that needs to be grooved. The construction worker stands in the middle of the device, holds the operating square tube firmly, and presses down hard to carve anti-skid grooves on the tunnel floor, and multiple anti-skid grooves can be carved at one time.

[0015] The above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit the present invention. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A fast construction device for anti-skid grooving of tunnel floor, characterized in that: The invention comprises a supporting frame, grooved steel bars (4), an operating square tube (5), and a supporting angle iron (6); the supporting frame is a rectangular frame formed by welding angle iron one (1), angle iron two (2), and angle iron three (3); the grooved steel bars (4) and the supporting frame are welded into a whole; and the supporting angle iron (6) and the operating square tube (5) are respectively welded to angle iron one (1) into a whole.

2. The anti-skid grooving rapid construction device for tunnel floor according to claim 1 is characterized by: The angle iron one (1), angle iron two (2) and angle iron three (3) are 4*4cm angle irons.

3. The anti-skid grooving rapid construction device for tunnel floor according to claim 1 is characterized by: The grooved steel bars (4) are C25 threaded steel bars.

4. The anti-skid grooving fast construction device for tunnel floor according to claim 1 is characterized by: The operating square tube (5) is a 10*10 stainless steel square tube.