Operating platform suitable for cast-in-place pile
By designing an operating platform suitable for cast-injected piles, the problems of insufficient load-bearing capacity and inconvenience in construction of traditional platforms are solved, and a safe and stable operating space and efficient construction process are achieved.
Patent Information
- Application Number
- CN202421211157.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-05-30
AI Technical Summary
The traditional cast-injected pile operation platform has insufficient load-bearing capacity, which poses safety hazards, has small platform space, inconvenient disassembly of the cartridge, and the lack of water discharge holes leads to water accumulation, affecting construction efficiency.
An operating platform suitable for cast piles is designed, including a bottom support and a conduit support mechanism that can be installed on the cast pile steel cage. The bottom support is provided with through holes and drainage holes. The conduit support mechanism can be installed open and closed on the bottom support for supporting and locking the conduit, and a clamping mechanism is provided on the bottom support to facilitate the installation and positioning of the steel cage.
By providing safe and stable operating space, the pile quality is improved, transportation, disassembly and installation is facilitated, the construction process is simplified, construction period is shortened, labor and machinery costs are saved, and the working surface is ensured is clean.
Smart Images

Figure CN222594797U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an operating platform suitable for cast-in-place piles. Background Art
[0002] The bored pile operation platform is an operation platform that facilitates the lowering of steel cages, casings and concrete pouring during the bored pile construction process.
[0003] The traditional bored pile operation platform has only one structure, which has insufficient load-bearing capacity and is dangerous during operation, such as:
[0004] 1) The platform space is small, and the lower part of the platform lacks a load-bearing structure to disperse gravity, which makes it easy to roll over;
[0005] 2) The simple structure makes it inconvenient to disassemble the casing, which may cause the casing to tilt at a large angle or fall off. In addition, it also has a certain impact on the positioning of the casing.
[0006] 3) There are no drainage holes on the operating platform, which makes water easily accumulate and inconvenient for assembly construction. Utility Model Content
[0007] The purpose of the utility model is to overcome the defects of the prior art, provide an operating platform suitable for cast-in-place piles, provide a safe and stable operating space, improve the quality of pile formation, facilitate transportation, disassembly and installation, and improve construction efficiency.
[0008] In order to achieve the above technical effects, the utility model provides an operating platform suitable for cast-in-place piles, which includes:
[0009] A bottom bracket for installation on a cast-in-place pile reinforcement cage, the bottom bracket being provided with a through hole for a guide tube to pass through and correspondingly connected to a casing of the cast-in-place pile;
[0010] The catheter support mechanism is installed on the base in an openable and closable manner and is used to support and lock the catheter after the catheter is inserted into the through hole.
[0011] Preferably, the base support is evenly provided with lifting rings, and the base support is also evenly provided with base support positioning holes for fixedly connecting the base support with the casing of the cast-in-place pile.
[0012] Preferably, two clamping mechanisms for fixing the steel cage are respectively arranged on both sides of the through hole on the base support, and the clamping mechanisms include a main limiting bin fixedly connected to the base support, and a hanging bar arranged along the radial direction of the through hole and slidably installed on the main limiting bin, and a first clamping groove for clamping the steel cage is provided at one end of the hanging bar relatively close to the through hole.
[0013] Preferably, an anti-drop ear is provided on one end of the hanging bar relatively away from the through hole along the length direction, and two limiting plates for limiting the hanging bar after sliding are respectively installed on both sides of the main limiting bin.
[0014] Preferably, the catheter support mechanism includes two positioning plates symmetrically arranged on the base, and a pair of support plates respectively hingedly connected to opposite sides of the two positioning plates to achieve openable and closable blocking of the through hole, and second card grooves are provided on opposite sides of the pair of support plates. The two second card grooves are butt-jointed to form a socket for inserting the catheter when the pair of support plates are in a closed state, and the diameter of the socket is smaller than the diameter of the through hole, and the socket is connected to the through hole.
[0015] Preferably, a pair of the support plates are each provided with a protrusion on one side opposite to the other for locking the catheter after the catheter is inserted into the insertion hole.
[0016] Preferably, a plurality of positioning holes are respectively formed on the two positioning plates and the base bracket, and fixing bolts for fixing the positioning plates to the base bracket are inserted into the positioning holes.
[0017] Preferably, a plurality of drainage holes are evenly provided on the two positioning plates.
[0018] Preferably, a pair of the support plates are each provided with a handle, and the two positioning plates are each provided with a lifting ring.
[0019] Due to the adoption of the above technical solution, the technical effects achieved by the utility model are:
[0020] 1) It is convenient for construction and ensures the working safety of the operation space. By controlling the position of the steel cage and the conduit, the construction quality is controlled, thereby ensuring the smooth installation of the steel cage and the conduit and ensuring the accuracy of the position;
[0021] 2) The structure is simple, easy to transport, disassemble and install, components and parts can be easily replaced, and can be fine-tuned according to the hole position. Compared with traditional construction methods, it can shorten the construction period and save labor, machinery and other costs.
[0022] 3) The positioning plate is equipped with drainage holes to facilitate the cleaning of excess water and debris, thus ensuring a clean working surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 The utility model is a schematic diagram of the top view of the operating platform suitable for cast-in-place piles.
[0025] Figure 2 It is a schematic diagram of the top view of the bottom support in the utility model.
[0026] Figure 3 It is a front view structural schematic diagram of the bottom support in the utility model.
[0027] Figure 4 It is a side structural schematic diagram of the bottom support in the utility model.
[0028] Figure 5 The schematic diagram of the top view of the clamping mechanism in the utility model is
[0029] Figure 6 It is a schematic diagram of the top view of the catheter support mechanism in the utility model.
[0030] Figure 7 It is a front view structural schematic diagram of the catheter support mechanism in the utility model.
[0031] Figure 8 It is a side structural schematic diagram of the catheter support mechanism in the utility model.
[0032] The corresponding relationship of the numbers in the accompanying drawings is as follows:
[0033] 1-base support; 2-through hole; 3-lifting ring; 4-base support positioning hole; 5-clamping mechanism; 51-main limit bin; 52-hanging bar; 53-first slot; 54-limiting plate; 55-anti-falling ear; 56-connecting bolt; 6-positioning plate; 61-drain hole; 7-support plate; 71-protrusion; 8-second slot; 9-jack; 10-positioning hole; 11-handle; 12-lifting ring. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0035] See also Figures 1 to 8As shown, an embodiment of the utility model provides an operating platform suitable for bored piles, including a base 1 for installing a bored pile reinforcement cage and a conduit support mechanism, the base is provided with a through hole 2 for the conduit to pass through and correspondingly connected to a casing of the bored pile, the conduit support mechanism can be installed on the base 1 in an openable and closable manner and is used to support and lock the conduit after the conduit is inserted into the through hole 2.
[0036] See also Figures 1 to 5 As shown, the bottom bracket 1 is evenly provided with a lifting ring 3, and the bottom bracket 1 is evenly provided with a bottom bracket positioning hole 4 for fixing the bottom bracket 1 with the casing of the cast-in-place pile. Preferably, two clamping mechanisms 5 for fixing the steel cage are respectively provided on both sides of the through hole 2 on the bottom bracket 1, and the clamping mechanism 5 includes a main limit bin 51 fixedly connected to the bottom bracket 1, and a hanging bar 52 arranged along the radial direction of the through hole 2 and slidably installed on the main limit bin 51, and the end of the hanging bar 52 relatively close to the through hole 2 is provided with a first clamping groove 53 for the steel cage to be clamped, and the end of the hanging bar 52 relatively far from the through hole 2 along the length direction is provided with an anti-drop ear 55, and two limit plates 54 for limiting after the hanging bar 52 slide are respectively installed on both sides of the main limit bin 51 on the hanging bar 52. In this embodiment, the main limit bin 51 is fixedly connected to the bottom bracket 1 by a connecting bolt 56.
[0037] See also Figure 1 , Figures 6 to 8 As shown, the catheter support mechanism includes two positioning plates 6 symmetrically arranged on the base 1, and a pair of support plates 7 respectively hingedly connected to the opposite sides of the two positioning plates 6 to achieve an openable and closable blocking of the through hole 2. The opposite sides of the pair of support plates 7 are each provided with a second card slot 8. The two second card slots 8 are butt-jointed to form a common catheter insertion hole 9 when the pair of support plates 7 are closed. The diameter of the plug hole 9 is smaller than the diameter of the through hole 2, and the plug hole 9 is connected to the through hole 2.
[0038] Furthermore, a protrusion 71 for locking after the catheter is inserted into the insertion hole 9 is provided on the opposite side of the pair of support plates 7, and a plurality of positioning holes 10 are respectively provided on the two positioning plates and the base 1, and fixing bolts for fixing the positioning plate 6 to the base 1 are inserted into the positioning holes 10. Preferably, a plurality of drainage holes 61 are respectively evenly provided on the two positioning plates 6, and a handle 11 is provided on the pair of support plates 7, and a lifting ring 12 is provided on the two positioning plates 6. It should be noted that the upper surface of the positioning plate 6 is provided with textures, which can increase friction and prevent the operator from slipping during construction. By evenly providing drainage holes 61 on the positioning plate 6, it is convenient to clean up residual water and debris, and ensure that the working surface is clean.
[0039] The construction method using the operating platform of the utility model suitable for cast-in-place piles for installing cast-in-place pile reinforcement cages and conduits comprises the following contents:
[0040] 1. Preparation before construction
[0041] 1) After the hole reaches the designed elevation, the hole depth, hole diameter, hole wall, verticality, etc. are checked. The hole diameter and inclination are measured by a hole detector. The next step can be carried out only after the inspection is qualified.
[0042] 2) The site should be connected, connected and leveled, all obstacles above and below ground should be dealt with, and all temporary facilities such as lighting, power and safety facilities should be ready.
[0043] 3) If the bearing capacity of the surrounding foundation is weak, a 6mm thick steel plate should be prepared to improve the ground stability if necessary.
[0044] 4) Before construction, investigate the line's vehicle traffic, pedestrian flow, and pipelines and obstacles around the construction area. If there are any conflicting locations, please provide timely feedback.
[0045] 5) Carry out safety and reliability inspections and tests on cranes, drilling rigs, etc. that have entered the site to ensure safe and reliable construction.
[0046] 6) During the lifting construction period, vehicles must be strictly prohibited from passing through the operation area.
[0047] 2. Construction technology
[0048] After the hole inspection and acceptance is qualified → install the base support → hoist the first section of the steel cage (the steel cage is processed in the processing plant and then transported to the site) → hang the steel cage on the steel cage clamping mechanism of the base support → connect the first and second sections of the steel cage through a straight threaded sleeve → hang the steel cage as a whole in the clamping slot → fix the conduit support mechanism on the base support → install the conduit → clean the hole once and twice → after qualified acceptance → pour concrete → pile inspection and acceptance.
[0049] 3. Construction technical requirements
[0050] 1) It can be hoisted using the hoisting rings set diagonally on the base.
[0051] 2) There is an adjustable length steel cage clamping mechanism on both sides of the bottom bracket, and the stability of the steel cage can be controlled by adjusting the length. The positioning chamber is hollow, and bolts are set on it. Tightening can achieve positioning and locking. Anti-falling ears are set on the outside to prevent locking and falling, which is more secure.
[0052] 3) Two groups of symmetrical catheter positioning plate positioning holes are arranged on the bottom bracket to ensure stable connection with the catheter positioning plate.
[0053] 4) The conduit is locked in place by two rotatable support plates and a raised portion. After the new section of conduit is installed, the support plate is opened by the handle to allow the conduit to fall to a certain distance, and then the conduit is locked and the next section is installed.
[0054] 5) The support plate is connected to the adjacent positioning plate by a rotating device (in this embodiment, a hinge connection can be adopted), and the rotating device should be anti-blocking and ensure smoothness.
[0055] 6) Do not lift the conduit too quickly or too hard to prevent the surface concrete from being dragged along and causing the intrusion of slurry and slag, or hanging the steel cage, etc. The conduit removal operation should be clean and neat to prevent the sealing ring from falling into the hole. The removed conduits should be rinsed with clean water and stacked together.
[0056] 7) To prevent the steel cage from floating during pouring, reduce the pouring speed when pouring to 1m from the bottom of the steel cage. When the top surface of the concrete rises to more than 4m from the bottom of the steel cage, it is advisable to lift the conduit so that the bottom of the conduit is more than 2m above the bottom of the steel cage before resuming the normal pouring speed.
[0057] 4. Finished product monitoring
[0058] 1) The curing time of cast-in-place pile concrete should not be less than 28 days. When the pile top is in the mud, the curing time should be no less than 7 days; when the pile top is above the ground, it should be covered and watered for curing for no less than 7 days.
[0059] 2) The pouring elevation of the pile top should be 0.5 to 1.0 m higher than the designed pile top elevation to ensure that the concrete at the pile top reaches the designed concrete strength. After pouring, mark the pile position to prevent vehicles or mechanical equipment from rolling over and damaging the pile head.
[0060] 3) During winter construction, when the pile top elevation is below the local freezing line, it should be covered with soil or mud for maintenance; when the pile top is above the freezing line, in addition to adding antifreeze to the concrete, rice husks, sawdust and plastic film should be used for covering.
[0061] Parts not involved in the present invention are the same as the prior art or can be implemented by the prior art. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. An operating platform suitable for cast-in-place piles, characterized in that: include: A bottom bracket for installation on a cast-in-place pile reinforcement cage, the bottom bracket being provided with a through hole for a guide tube to pass through and correspondingly connected to a casing of the cast-in-place pile; The catheter support mechanism is installed on the base in an openable and closable manner and is used to support and lock the catheter after the catheter is inserted into the through hole.
2. The operating platform suitable for cast-in-place piles as claimed in claim 1, characterized in that: The base bracket is evenly provided with lifting rings, and the base bracket is also evenly provided with base bracket positioning holes for fixedly connecting the base bracket with the casing of the cast-in-place pile.
3. The operating platform suitable for cast-in-place piles as claimed in claim 1, characterized in that: Two clamping mechanisms for fixing the steel cage are respectively arranged on both sides of the through hole on the base support, and the clamping mechanisms include a main limiting bin fixedly connected to the base support, and a hanging bar arranged along the radial direction of the through hole and slidably installed on the main limiting bin, and a first clamping groove for clamping the steel cage is provided at one end of the hanging bar relatively close to the through hole.
4. The operating platform suitable for cast-in-place piles as claimed in claim 3, characterized in that: An anti-falling ear is provided on one end of the hanging bar relatively far away from the through hole along the length direction, and two limiting plates for limiting the hanging bar after sliding are respectively installed on both sides of the main limiting bin.
5. The operating platform suitable for cast-in-place piles as claimed in claim 1, characterized in that: The catheter support mechanism includes two positioning plates symmetrically arranged on the base, and a pair of support plates respectively hingedly connected to opposite sides of the two positioning plates to achieve openable and closable blocking of the through hole. Second card slots are provided on opposite sides of the pair of support plates. When the pair of support plates are closed, the two second card slots are butt-jointed to form a socket for inserting the catheter. The diameter of the socket is smaller than the diameter of the through hole, and the socket is connected to the through hole.
6. The operating platform suitable for cast-in-place piles as claimed in claim 5, characterized in that: A pair of support plates are provided on opposite sides thereof with protrusions for locking the catheter after the catheter is inserted into the insertion hole.
7. The operating platform suitable for cast-in-place piles as claimed in claim 5, characterized in that: A plurality of positioning holes are respectively formed on the two positioning plates and the base bracket, and fixing bolts for fixing the positioning plates to the base bracket are inserted into the positioning holes.
8. The operating platform suitable for cast-in-place piles as claimed in claim 5, characterized in that: A plurality of drainage holes are evenly arranged on the two positioning plates.
9. The operating platform suitable for cast-in-place piles as claimed in claim 5, characterized in that: A pair of the support plates are each provided with a handle, and the two positioning plates are each provided with a lifting ring.