Building curtain wall connecting structure

By designing a architectural curtain wall connection structure that combines multi-point engagement and rubber pads, the problem of low stability and safety of existing curtain wall connections is solved, and higher stability and engagement performance are achieved.

CN222595258UActive Publication Date: 2025-03-11ZHEJIANG ZHONGZHE CURTAIN WALL DECORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421225327.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-03-11
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The existing curtain wall connectors have fewer engagement points, resulting in lower connection stability performance, easy to disengage when impacted, and low safety performance.

Method used

A building curtain wall connection structure is designed, including a first connection unit, a second connection unit and a third connection unit, and the connection stability and engagement performance are enhanced by the combination of multi-point engagement and rubber pads.

Benefits of technology

It improves the stability performance between curtain wall connectors and the engagement performance of glass curtain walls, reduces the risk of disengagement under external impact, and improves safety performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222595258U_ABST
    Figure CN222595258U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of curtain wall installation, and discloses a building curtain wall connecting structure which comprises a first connecting unit, a second connecting unit and a third connecting unit, the front side of the second connecting unit is connected to the rear side of the first connecting unit in a clamped mode, and the rear side of the second connecting unit is connected to the front side of the third connecting unit in a clamped mode. The left side and the right side of the second connecting unit are connected with three glass curtain walls in a clamped mode at equal intervals, the first connecting unit comprises a first channel steel connecting piece, the second connecting unit comprises a second channel steel connecting piece, and the third connecting unit comprises a third channel steel connecting piece. According to the connecting structure, installation is convenient, meanwhile, the stability performance among the first channel steel connecting piece, the second channel steel connecting piece and the third channel steel connecting piece can be improved, mutual separation caused by large external force impact is not likely to happen, meanwhile, the clamping performance between glass curtain walls is improved, and the glass curtain walls are not likely to be separated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of curtain wall installation, in particular to a building curtain wall connection structure. Background Art

[0002] The curtain wall is the exterior wall enclosure of a building. It does not bear weight and is hung like a curtain, so it is also called a "curtain wall". It is a lightweight wall with decorative effects commonly used in modern large and high-rise buildings. It is composed of panels and a supporting structure system. It has a certain displacement ability relative to the main structure or a certain deformation ability of itself, and is an exterior protective structure or decorative structure of the building that does not bear the effect of the main structure (the exterior wall frame support system is also a type of curtain wall system). Common curtain wall structures usually use glass materials, which are mainly divided into hidden frame, semi-hidden frame, exposed frame, point type, full glass and other structural forms. Curtain walls have the advantages of light structure, flexible design, systematic construction, and easy replacement and maintenance.

[0003] The installation of the glass curtain wall first involves installing curtain wall connectors, and then snapping the left and right ends of the glass curtain wall into the curtain wall connectors. Curtain wall connectors are usually made of steel and aluminum alloy structures. Most of the existing curtain wall connectors are connected to each other in the form of snap-fitting, with fewer snap-fitting points, resulting in lower connection stability. When impacted, the glass curtain wall is easily detached from the connector, resulting in lower safety performance. It is necessary to design a building curtain wall connection structure to solve the above-mentioned problems. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes a building curtain wall connection structure.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A building curtain wall connection structure comprises a first connection unit, a second connection unit and a third connection unit, wherein the front side of the second connection unit is snap-connected to the rear side of the first connection unit, the rear side of the second connection unit is snap-connected to the front side of the third connection unit, and the left and right sides of the second connection unit are snap-connected with three glass curtain walls at equal distances; the first connection unit comprises a first channel steel connection piece, the second connection unit comprises a second channel steel connection piece, and the third connection unit comprises a third channel steel connection piece; a first snap-fitting strip is arranged at the rear side of the first channel steel connection piece, a second snap-fitting strip is arranged at the front side of the second channel steel connection piece, the second snap-fitting strip is snap-connected to the inner side of the first snap-fitting strip, a third snap-fitting strip is arranged at the rear side of the second channel steel connection piece, a second snap-fitting groove is arranged at the front side of the third channel steel connection piece, and the third snap-fitting strip is snap-connected to the inner side of the second snap-fitting groove;

[0007] Through the above technical solution, while facilitating installation, the stability between the first channel steel connector, the second channel steel connector and the third channel steel connector can be increased, and they are not easily separated from each other due to large external force impact. At the same time, the clamping performance between the glass curtain walls is increased, and the glass curtain walls are not easy to separate.

[0008] Furthermore, a plurality of curtain wall engaging grooves are equidistantly arranged on the left and right sides of the second channel steel connector, two connecting protrusions are equidistantly arranged between the curtain wall engaging grooves, and U-shaped rubber groove sets are engaged and connected between the curtain wall engaging grooves;

[0009] Through the above technical solution, the U-shaped rubber groove kit can be stably installed between the curtain wall clamping grooves and is not easy to be displaced. At the same time, the clamping end of the glass curtain wall is protected and the gap at the connection with the second channel steel connector is reduced.

[0010] Further, the left and right ends of the front side of the second channel steel connector are both provided with first abutment plates, the first abutment plates are respectively pressed against the left and right ends of the rear side of the first channel steel connector, and the rear outer end of the first abutment plates is provided with a second rubber pad;

[0011] Through the above technical solution, the first abutment plate is provided to facilitate installation and bonding between the second rubber pad and the glass curtain wall, thereby protecting the glass curtain wall and reducing the gap at the connection.

[0012] Further, the left and right ends of the rear side of the second channel steel connector are both provided with fourth engaging strips, the left and right ends of the front side of the third channel steel connector are both provided with first engaging grooves, and the fourth engaging strips are respectively engaged and connected to the inner sides of the first engaging grooves;

[0013] Through the above technical solution, the fourth snap-fitting strip is snap-fitted to the inner side of the first snap-fitting groove, thereby increasing the snap-fitting performance between the second channel steel connector and the third channel steel connector, and at the same time, the fourth snap-fitting strip and the third channel steel connector, which are in close contact with each other, are convenient for bolt fixation.

[0014] Furthermore, the left and right rear parts of the second channel steel connector are both provided with second abutment plates, and the front outer ends of the second abutment plates are both provided with first rubber pads;

[0015] Through the above technical solution, the second abutment plate is provided to facilitate the installation and fitting between the first rubber pad and the glass curtain wall, thereby protecting the glass curtain wall and reducing the gap at the connection.

[0016] Further, a first structural reinforcement is provided on the inner side of the first channel steel connection piece, and a second structural reinforcement is provided on the inner side of the third channel steel connection piece;

[0017] Through the above technical solution, the internal structural strength of the first channel steel connector and the third channel steel connector is increased to avoid deformation and damage caused by slight force.

[0018] The utility model has the following beneficial effects:

[0019] 1. In the utility model, when installing the glass curtain wall, firstly, the first channel steel connector and the third channel steel connector are fixed on the ground after position measurement, and then the front and rear ends of the second channel steel connector are respectively inserted from top to bottom into the rear side of the first channel steel connector and the front side of the third channel steel connector, so that the second snap-fitting strip is inserted and snap-fitted into the inner side of the first snap-fitting strip, and the third snap-fitting strip is inserted and snap-fitted into the inner side of the second snap-fitting groove, and the front side of the second snap-fitting strip is attached to the rear side of the first channel steel connector, and the fourth snap-fitting strip is inserted and snap-fitted into the inner side of the first snap-fitting groove, and then fixed. The bolts are fixedly connected between the second engaging strip and the rear side of the first channel steel connector, and between the fourth engaging strip and the front side of the third channel steel connector. Secondly, three installation grooves are formed between the curtain wall engaging grooves arranged on the left and right sides of the second channel steel connector. The three glass curtain walls are installed and engaged in the installation grooves, which is convenient for installation. At the same time, the stability between the first channel steel connector, the second channel steel connector and the third channel steel connector can be increased, and they are not easily separated from each other due to large external force impact. At the same time, the engaging performance between the glass curtain walls is increased, and the glass curtain walls are not easy to separate.

[0020] 2. In the utility model, a U-shaped rubber groove kit is installed between three installation grooves formed between the curtain wall engaging grooves arranged on the left and right sides of the second channel steel connector, so that it is engaged with the connecting protrusion, and then the glass curtain wall is installed. Then, a first rubber pad is placed between the first abutment plate and the glass curtain wall, and a second rubber pad is placed between the second abutment plate and the glass curtain wall, so that the installation gap between the glass curtain wall and the second channel steel connector is reduced, and at the same time, the glass curtain wall is prevented from shaking and protected. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A three-dimensional structural combination diagram of a first connection unit, a second connection unit and a third connection unit of a building curtain wall connection structure proposed by the utility model;

[0022] Figure 2 This is a schematic diagram of the three-dimensional structure of a first connection unit of a building curtain wall connection structure proposed by the utility model;

[0023] Figure 3 A schematic diagram of the three-dimensional structure of a third connection unit of a building curtain wall connection structure proposed by the utility model;

[0024] Figure 4 This is a schematic diagram of the three-dimensional structure of a second connection unit of a building curtain wall connection structure proposed by the utility model;

[0025] Figure 5 This is a schematic diagram of a top view of the structure decomposition of a first connection unit, a second connection unit and a third connection unit of a building curtain wall connection structure proposed by the utility model;

[0026] Figure 6 This is an enlarged view of point A of a building curtain wall connection structure proposed by the utility model.

[0027] Legend:

[0028] 1. First connecting unit; 101. First channel steel connecting piece; 102. First snap-fitting strip; 103. First structural reinforcement; 2. Second connecting unit; 201. Second channel steel connecting piece; 202. Second snap-fitting strip; 203. First abutment plate; 204. Curtain wall snap-fitting groove; 205. Third snap-fitting strip; 206. Fourth snap-fitting strip; 207. Second abutment plate; 208. Connecting protrusion; 3. Third connecting unit; 301. Third channel steel connecting piece; 302. First snap-fitting groove; 303. Second snap-fitting groove; 304. Second structural reinforcement; 4. Glass curtain wall; 5. First rubber pad; 6. Second rubber pad; 7. U-shaped rubber groove kit. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Reference Figure 1-6 The utility model provides an embodiment: a building curtain wall connection structure, comprising a first connection unit 1, a second connection unit 2 and a third connection unit 3, the front side of the second connection unit 2 is snap-connected to the rear side of the first connection unit 1, the rear side of the second connection unit 2 is snap-connected to the front side of the third connection unit 3, and the left and right sides of the second connection unit 2 are snap-connected with three glass curtain walls 4 at equal distances; the first connection unit 1 comprises a first channel steel connection piece 101, and the second connection unit 2 comprises a second channel steel connection piece 201 The third connecting unit 3 includes a third channel steel connecting piece 301; a first locking strip 102 is provided on the rear side of the first channel steel connecting piece 101, a second locking strip 202 is provided on the front side of the second channel steel connecting piece 201, the second locking strip 202 is locked and connected to the inner side of the first locking strip 102, a third locking strip 205 is provided on the rear side of the second channel steel connecting piece 201, a second locking groove 303 is provided on the front side of the third channel steel connecting piece 301, and the third locking strip 205 is locked and connected to the inner side of the second locking groove 303.

[0031] A plurality of curtain wall engaging grooves 204 are equidistantly arranged on the left and right sides of the second channel steel connector 201, two connecting protrusions 208 are equidistantly arranged between the curtain wall engaging grooves 204, and U-shaped rubber groove kits 7 are engaged and connected between the curtain wall engaging grooves 204, so that the U-shaped rubber groove kit 7 can be stably installed between the curtain wall engaging grooves 204, and is not easy to be displaced. At the same time, the engaging end of the glass curtain wall 4 is protected, and the gap at the connection with the second channel steel connector 201 is reduced. First abutment plates 203 are provided on the left and right ends of the front side of the second channel steel connector 201, and the first abutment plates 203 are respectively pressed against the left and right ends of the rear side of the first channel steel connector 101, and a second rubber pad 6 is provided on the outer end of the rear side of the first abutment plate 203. The first abutment plate 203 is provided to facilitate the installation and fitting between the second rubber pad 6 and the glass curtain wall 4, protect the glass curtain wall 4, and reduce the gap at the connection.

[0032] The left and right ends of the rear side of the second channel steel connector 201 are both provided with fourth snap-fitting strips 206, and the left and right ends of the front side of the third channel steel connector 301 are both provided with first snap-fitting grooves 302. The fourth snap-fitting strips 206 are respectively snap-fitted to the inner sides of the first snap-fitting grooves 302. The snap-fitting performance between the second channel steel connector 201 and the third channel steel connector 301 is increased by snap-fitting the fourth snap-fitting strips 206 and the third channel steel connector 301, and the bolts are conveniently fixed between the left and right sides of the second channel steel connector 201. A second butt plate 207 is provided at the rear, and a first rubber pad 5 is provided at the outer end of the front side of the second butt plate 207. The second butt plate 207 is provided to facilitate the installation and fitting between the first rubber pad 5 and the glass curtain wall 4 to protect the glass curtain wall 4 and reduce the gap at the connection. A first structural reinforcement 103 is provided on the inner side of the first channel steel connector 101, and a second structural reinforcement 304 is provided on the inner side of the third channel steel connector 301 to increase the structural strength inside the first channel steel connector 101 and the third channel steel connector 301 to avoid deformation and damage caused by slight force.

[0033] Working principle: When installing the glass curtain wall 4, firstly, the first channel steel connector 101 and the third channel steel connector 301 are fixed on the ground after position measurement, and then the front and rear ends of the second channel steel connector 201 are respectively inserted from top to bottom into the rear side of the first channel steel connector 101 and the front side of the third channel steel connector 301, so that the second snap-fitting strip 202 is inserted and snap-fitted into the inner side of the first snap-fitting strip 102, and the third snap-fitting strip 205 is inserted and snap-fitted into the inner side of the second snap-fitting groove 303, and the front side of the second snap-fitting strip 202 is attached to the rear side of the first channel steel connector 101, and the fourth snap-fitting strip 206 is inserted and snap-fitted into the inner side of the first snap-fitting groove 302. On the side, the second engaging strip 202 and the rear side of the first channel steel connector 101, and the fourth engaging strip 206 and the front side of the third channel steel connector 301 are fixedly connected by fixing bolts. Secondly, three installation grooves are formed between the curtain wall engaging grooves 204 arranged on the left and right sides of the second channel steel connector 201, and a U-shaped rubber groove kit 7 is installed between them to engage with the connecting protrusion 208, and then the glass curtain wall 4 is installed. Then, the first rubber pad 5 is placed between the first abutment plate 203 and the glass curtain wall 4, and the second rubber pad 6 is placed between the second abutment plate 207 and the glass curtain wall 4, and the three glass curtain walls 4 are installed and engaged in the installation grooves.

[0034] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A building curtain wall connection structure, comprising a first connection unit (1), a second connection unit (2) and a third connection unit (3), characterized in that: The front side of the second connection unit (2) is snap-connected to the rear side of the first connection unit (1), the rear side of the second connection unit (2) is snap-connected to the front side of the third connection unit (3), and the left and right sides of the second connection unit (2) are snap-connected to three glass curtain walls (4) at equal distances; The first connection unit (1) comprises a first channel steel connection piece (101), the second connection unit (2) comprises a second channel steel connection piece (201), and the third connection unit (3) comprises a third channel steel connection piece (301); A first snap-fitting strip (102) is arranged on the rear side of the first channel steel connector (101), a second snap-fitting strip (202) is arranged on the front side of the second channel steel connector (201), the second snap-fitting strip (202) is snap-fitted to the inner side of the first snap-fitting strip (102), a third snap-fitting strip (205) is arranged on the rear side of the second channel steel connector (201), a second snap-fitting groove (303) is arranged on the front side of the third channel steel connector (301), the third snap-fitting strip (205) is snap-fitted to the inner side of the second snap-fitting groove (303).

2. A building curtain wall connection structure according to claim 1, characterized in that: A plurality of curtain wall engaging grooves (204) are equidistantly arranged on the left and right sides of the second channel steel connecting piece (201), two connecting protrusions (208) are equidistantly arranged between the curtain wall engaging grooves (204), and U-shaped rubber groove sets (7) are engaged and connected between the curtain wall engaging grooves (204).

3. The building curtain wall connection structure according to claim 1, characterized in that: The left and right ends of the front side of the second channel steel connector (201) are both provided with first abutment plates (203), the first abutment plates (203) are respectively pressed against the left and right ends of the rear side of the first channel steel connector (101), and the rear outer end of the first abutment plates (203) is both provided with second rubber pads (6).

4. The building curtain wall connection structure according to claim 1, characterized in that: The left and right ends of the rear side of the second channel steel connector (201) are both provided with fourth snap-fitting strips (206), the left and right ends of the front side of the third channel steel connector (301) are both provided with first snap-fitting grooves (302), and the fourth snap-fitting strips (206) are respectively snap-fitted to the inner sides of the first snap-fitting grooves (302).

5. The building curtain wall connection structure according to claim 1, characterized in that: The second channel steel connecting piece (201) is provided with a second abutment plate (207) at the rear of the left and right sides, and a first rubber pad (5) is provided at the front outer end of the second abutment plate (207).

6. The building curtain wall connection structure according to claim 1, characterized in that: A first structural reinforcement member (103) is provided on the inner side of the first channel steel connection member (101).

7. The building curtain wall connection structure according to claim 1, characterized in that: A second structural reinforcement member (304) is provided inside the third channel steel connection member (301).