Engineering supervision monitoring device

By introducing lifting mechanism and positioning mechanism into the engineering supervision and monitoring device, the existing device cannot adjust the monitoring height and is inconvenient to move, achieving flexible height adjustment and rapid position adjustment, and improving the practicality of the device.

CN222597200UActive Publication Date: 2025-03-11GUANGDONG HUAGONG ENG CONSTR SUPERVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420783407.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-16
Publication Date
2025-03-11
Estimated Expiration
2034-04-16

AI Technical Summary

Technical Problem

The existing engineering supervision and monitoring devices cannot adjust the monitoring height and are inconvenient to move, reducing the practicality of the device.

Method used

An engineering supervision and monitoring device including a lifting mechanism and a positioning mechanism is designed. The lifting mechanism easily adjusts the height of the camera through the motor-driven threaded rod and slide rod mechanism. The positioning mechanism achieves rapid positioning and position adjustment through the coordination of the limiting chute and threaded sleeve.

Benefits of technology

It realizes flexible adjustment of camera height, adapts to monitoring needs of different heights, and improves the movement convenience and stability of the device through the positioning mechanism, and enhances the practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222597200U_ABST
    Figure CN222597200U_ABST
Patent Text Reader

Abstract

The utility model discloses a project supervision monitoring device, which belongs to the technical field of project supervision, aims to solve the problems that the monitoring height cannot be adjusted and the movement is inconvenient, and comprises a mounting frame and a door plate, the door plate is hinged to the front side of the mounting frame through hinges, and moving wheels are fixedly mounted at the bottom of the mounting frame and close to four corners. A lifting mechanism is arranged at the top of the mounting frame, a damping rotating disc is fixedly mounted at the top of the lifting mechanism, a mounting seat is fixedly connected to the top of the damping rotating disc, a damping rotating shaft is fixedly mounted on the mounting seat, hinge blocks are hinged to the two ends of the damping rotating shaft, and cameras are fixedly mounted at the tops of the hinge blocks; positioning mechanisms are arranged on the outer sides of the moving wheels and at the bottom of the mounting frame; according to the utility model, through the arrangement of the lifting mechanism, after the device is installed, the height of the camera can be conveniently adjusted, so that the camera can monitor engineering construction conditions at different height positions, and the device is simple in structure and convenient to implement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of engineering supervision, and in particular relates to an engineering supervision monitoring device. Background Art

[0002] There are many processes at the construction site of a building project. In addition to strict supervision of key processes, other general processes or construction processes should be included in the supervision scope as much as possible to ensure the quality of the construction project. Therefore, real-time monitoring of the construction site is required to supervise the construction personnel and find the causes in time when problems occur during construction.

[0003] In the prior art, there is a project supervision monitoring device with patent announcement number CN214744629U, which includes a support seat for mounting a camera, on which at least one support frame is rotatably arranged, on which a plug-in assembly for fixing the support frame to the ground is arranged, and the plug-in assembly includes a plug-in rod plugged into the ground, and a fixed column is arranged on the mounting seat, on which a rotating assembly for controlling the rotation of the support frame is arranged, and on which a moving assembly for moving the support seat is arranged on the fixed column. This application has the effect of being able to adjust the monitoring area, but in actual use, there are still the following deficiencies: from a practical point of view, the device is usually not convenient to move after installation, and the height of the camera cannot be adjusted, which is not suitable for monitoring in different environments, reducing the practicality of the device.

[0004] Therefore, a project supervision monitoring device is needed to solve the problems in the prior art that the monitoring height cannot be adjusted and the device is inconvenient to move. Utility Model Content

[0005] The purpose of the utility model is to provide a project supervision monitoring device to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an engineering supervision and monitoring device, comprising a mounting frame and a door panel, the door panel is hingedly mounted on the front side of the mounting frame by a hinge, movable wheels are fixedly mounted on the bottom of the mounting frame near the four corners, a lifting mechanism is provided on the top of the mounting frame, a damping turntable is fixedly mounted on the top of the lifting mechanism, a mounting seat is fixedly connected to the top of the damping turntable, a damping shaft is fixedly mounted on the mounting seat, hinge blocks are hingedly mounted on both ends of the damping shaft, a camera is fixedly mounted on the top of the hinge block, and a positioning mechanism is provided on the outer side of the movable wheel at the bottom of the mounting frame.

[0007] It should be noted in the solution that four positioning mechanisms are provided, and the four positioning mechanisms are provided corresponding to the four moving wheels and are provided on the outside of the moving wheels.

[0008] It is further worth explaining that the lifting mechanism includes a mounting plate, which is fixedly connected to the bottom of the damping turntable, a support column is fixedly connected to the bottom of the mounting plate, a connecting plate is fixedly connected to the bottom end of the support column and is arranged on the upper part of the mounting frame, a motor is fixedly installed between the mounting plate and the connecting plate, a bearing is fixedly installed on the connecting plate at the bottom end of the motor, a first threaded rod is fixedly connected to the bottom end of the motor and is arranged on the connecting plate through rotation of the motor, and sliding rods are fixedly connected to the bottom of the connecting plate on both sides of the bearing and slide through the inside of the mounting frame.

[0009] It should be further explained that the lifting mechanism is threadedly connected to the mounting frame via a first threaded rod, and the first threaded rod is set to be consistent in length with the sliding rod.

[0010] As a preferred embodiment, the positioning mechanism includes a mounting block, which is fixedly connected to the bottom of the mounting frame and arranged on the outside of the moving wheel. A limiting slide groove is provided in the mounting block, and a limiting slider is slidably arranged in the limiting slide groove. A second threaded rod is fixedly connected to the bottom of the limiting slider and passes through the bottom of the mounting block. The bottom end of the second threaded rod is rotatably connected to a support plate. A threaded sleeve is threadedly connected to the second threaded rod and is arranged in the mounting block.

[0011] As a preferred embodiment, the surface of the threaded sleeve is provided with an anti-slip groove, and is protruding from the surface of the mounting block.

[0012] Compared with the prior art, the engineering supervision monitoring device provided by the utility model has at least the following beneficial effects:

[0013] (1) Through the provided lifting mechanism, after the device is installed, the height of the camera can be conveniently adjusted so that it can monitor the construction conditions at different heights. The structure is simple and easy to implement.

[0014] (2) The positioning mechanism can be used to quickly position and install the device to prevent the device from moving and affecting the monitoring effect. At the same time, the positioning mechanism can be used to facilitate position adjustment of the device, greatly improving the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0016] Figure 2 It is a schematic diagram of the internal cutaway structure of the utility model;

[0017] Figure 3 It is a schematic diagram of the cutaway structure of the positioning mechanism of the utility model.

[0018] In the figure: 1. mounting frame; 101. moving wheel; 2. door panel; 3. lifting mechanism; 301. mounting plate; 302. support column; 303. connecting plate; 304. motor; 305. bearing; 306. first threaded rod; 307. slide rod; 4. damping turntable; 5. mounting seat; 6. damping shaft; 7. hinge block; 8. camera; 9. positioning mechanism; 901. mounting block; 902. limiting slide groove; 903. limiting slide block; 904. second threaded rod; 905. threaded sleeve; 906. support plate. DETAILED DESCRIPTION

[0019] The present invention will be further described below in conjunction with the embodiments.

[0020] See also Figure 1-3 The utility model provides a project supervision monitoring device, including a mounting frame 1 and a door panel 2, the door panel 2 is hingedly mounted on the front side of the mounting frame 1 through a hinge, a moving wheel 101 is fixedly mounted near the four corners at the bottom of the mounting frame 1, a lifting mechanism 3 is arranged on the top of the mounting frame 1, a damping turntable 4 is fixedly mounted on the top of the lifting mechanism 3, a mounting seat 5 is fixedly connected to the top of the damping turntable 4, a damping shaft 6 is fixedly mounted on the mounting seat 5, hinge blocks 7 are hingedly mounted at both ends of the damping shaft 6, a camera 8 is fixedly mounted on the top of the hinge block 7, and a positioning mechanism 9 is arranged on the outside of the moving wheel 101 at the bottom of the mounting frame 1.

[0021] Further as Figure 1 , Figure 2 and Figure 3 As shown, it is worth explaining in detail that four positioning mechanisms 9 are provided, and the four positioning mechanisms 9 are provided corresponding to the four moving wheels 101 and are provided outside the moving wheels 101 .

[0022] The lifting mechanism 3 facilitates the adjustment of the installation height of the camera 8 so as to meet the monitoring work at different heights. At the same time, the positioning mechanism 9 facilitates the positioning and movement of the device, thereby improving the convenience of using the device.

[0023] Further as Figure 1 and Figure 2As shown, it is worth specifically explaining that the lifting mechanism 3 includes a mounting plate 301, which is fixedly connected to the bottom of the damping turntable 4, and a support column 302 is fixedly connected to the bottom of the mounting plate 301. The bottom end of the support column 302 is fixedly connected to a connecting plate 303 and is arranged on the upper part of the mounting frame 1. A motor 304 is fixedly installed between the mounting plate 301 and the connecting plate 303, and a bearing 305 is fixedly installed on the connecting plate 303 at the bottom end of the motor 304. A first threaded rod 306 is fixedly connected to the bottom end of the motor 304 and is rotated by the motor 304 and is arranged on the connecting plate 303. Slide rods 307 are fixedly connected to the bottom of the connecting plate 303 on both sides of the bearing 305 and slide through the inside of the mounting frame 1. The lifting mechanism 3 is threadedly connected to the mounting frame 1 through the first threaded rod 306, and the length of the first threaded rod 306 and the slide rod 307 are set to be consistent.

[0024] The motor 304 is operated to drive the first threaded rod 306 to rotate. Since the first threaded rod 306 is threadedly connected to the mounting frame 1 and cooperates with the limited sliding of the slide bar 307, the mounting plate 301 moves upward through it, thereby realizing the height adjustment of the camera 8 to meet the monitoring needs at different heights and improve practicality.

[0025] According to the above working process, it can be known that: through the provided lifting mechanism 3, after the device is installed, the height of the camera 8 can be conveniently adjusted so that it can monitor the construction conditions at different heights. The structure is simple and easy to implement.

[0026] Further as Figure 2 and Figure 3 As shown, it is worth specifically explaining that the positioning mechanism 9 includes a mounting block 901, which is fixedly connected to the bottom of the mounting frame 1 and arranged on the outside of the moving wheel 101. A limiting slide groove 902 is opened in the mounting block 901, and a limiting slider 903 is slidably arranged in the limiting slide groove 902. A second threaded rod 904 is fixedly connected to the bottom of the limiting slider 903 and passes through the bottom of the mounting block 901. The bottom end of the second threaded rod 904 is rotatably connected to a support plate 906. A threaded sleeve 905 is threadedly connected to the second threaded rod 904 and is arranged in the mounting block 901. The surface of the threaded sleeve 905 is provided with an anti-slip groove, and it protrudes from the surface of the mounting block 901.

[0027] By rotating the threaded sleeve 905, the threaded sleeve 905 drives the second threaded rod 904 to move threadedly, and since the second threaded rod 904 is limited and slid in the mounting block 901 by the limiting slider 903, the second threaded rod 904 pushes the support plate 906 to move downward, thereby achieving support and limitation of the device to ensure that the device is not easy to move, improve the stability of the device, and conversely facilitate the movement of the device.

[0028] This solution has the following working process: when this device is used, the device is moved to the position that needs to be monitored and managed by the moving wheel 101. At this time, the threaded sleeve 905 is rotated to make the threaded sleeve 905 drive the second threaded rod 904 to move in a threaded manner, and because the second threaded rod 904 is limited and slid in the mounting block 901 by the limiting slider 903, the second threaded rod 904 pushes the support plate 906 to move downward, thereby realizing the support and limitation of the device to ensure that the device is not easy to move and improve the stability of the device. After the positioning is completed, the angle of the camera 8 is easily adjusted by the damping turntable 4 and the damping shaft 6. At the same time, the motor 304 is operated to drive the first threaded rod 306 to rotate. Since the first threaded rod 306 is threadedly connected to the mounting frame 1, the sliding rod 307 is limited and slid, so that the mounting plate 301 moves upward through it, thereby realizing the height adjustment of the camera 8 to meet the monitoring of different height positions and improve practicality.

[0029] In summary: through the setting of the lifting mechanism 3, after the device is installed, the height of the camera 8 can be conveniently adjusted to enable it to monitor the construction conditions at different heights. The structure is simple and easy to implement; through the setting of the positioning mechanism 9, the device can be quickly positioned and installed to avoid the movement of the device and affect the monitoring effect. At the same time, the positioning mechanism 9 can facilitate the position adjustment of the device, which greatly improves the practicability of the device.

Claims

1. A project supervision and monitoring device, comprising a mounting frame (1) and a door panel (2), characterized in that: The door panel (2) is hingedly mounted on the front side of the mounting frame (1) through hinges; movable wheels (101) are fixedly mounted near the four corners of the bottom of the mounting frame (1); a lifting mechanism (3) is arranged on the top of the mounting frame (1); a damping turntable (4) is fixedly mounted on the top of the lifting mechanism (3); a mounting seat (5) is fixedly connected to the top of the damping turntable (4); a damping shaft (6) is fixedly mounted on the mounting seat (5); hinge blocks (7) are hingedly mounted at both ends of the damping shaft (6); a camera (8) is fixedly mounted on the top of the hinge block (7); and a positioning mechanism (9) is arranged on the outside of the movable wheel (101) at the bottom of the mounting frame (1).

2. The engineering supervision monitoring device according to claim 1, characterized in that: Four positioning mechanisms (9) are provided, and the four positioning mechanisms (9) are provided corresponding to the four moving wheels (101) and are arranged outside the moving wheels (101).

3. The engineering supervision monitoring device according to claim 1, characterized in that: The lifting mechanism (3) comprises a mounting plate (301), wherein the mounting plate (301) is fixedly connected to the bottom of the damping turntable (4), the mounting plate (301) is fixedly connected to a support column (302) at the bottom, the bottom end of the support column (302) is fixedly connected to a connecting plate (303) and is arranged on the upper part of the mounting frame (1), a motor (304) is fixedly installed between the mounting plate (301) and the connecting plate (303), the bottom end of the motor (304) is fixedly installed with a bearing (305) on the connecting plate (303), the bottom end of the motor (304) is fixedly connected to a first threaded rod (306) and is rotatably arranged on the connecting plate (303) by the motor (304), and both sides of the bearing (305) are fixedly connected to sliding rods (307) at the bottom of the connecting plate (303) and slide through the inside of the mounting frame (1).

4. A project supervision monitoring device according to claim 3, characterized in that: The lifting mechanism (3) is threadedly connected to the installation frame (1) via a first threaded rod (306), and the first threaded rod (306) and the sliding rod (307) are set to be of the same length.

5. The engineering supervision monitoring device according to claim 1, characterized in that: The positioning mechanism (9) comprises a mounting block (901), the mounting block (901) being fixedly connected to the bottom of the mounting frame (1) and arranged on the outside of the moving wheel (101), the mounting block (901) being provided with a limit slide groove (902), the limit slide block (903) being slidably arranged in the limit slide groove (902), the bottom of the limit slide block (903) being fixedly connected to a second threaded rod (904) and passing through the bottom of the mounting block (901), the bottom end of the second threaded rod (904) being rotatably connected to a support plate (906), the second threaded rod (904) being threadedly connected to a threaded sleeve (905) and being arranged in the mounting block (901).

6. A project supervision monitoring device according to claim 5, characterized in that: The surface of the threaded sleeve (905) is provided with an anti-slip groove and is protruding from the surface of the mounting block (901).