Concrete pouring equipment for building construction
By setting up cylinders and threaded rods at the bottom of the pouring pipe of the concrete pouring equipment for construction construction, combined with the adjustment plate, the angle and length of the pouring pipe are adjusted, solving the problem of using the fixed position of the equipment. At the same time, by setting a rotatable adjustment wheel in the discharge pipe to adjust the flow rate, different construction needs are met and the flexibility and applicability of the equipment are improved.
Patent Information
- Application Number
- CN202421414730.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-06-20
AI Technical Summary
The pouring pipes of existing building construction concrete pouring equipment are fixedly set, resulting in the equipment being only used in predetermined locations, which lacks flexibility and convenience, increasing the difficulty and complexity of construction.
By setting up a cylinder at the bottom of the casting pipe, combining a threaded rod and an adjustment plate, the angle and length of the casting pipe can be easily adjusted, thereby achieving accurate casting of concrete to different positions. In addition, by providing a rotatable adjustment wheel in the discharge pipe, the flow rate can be adjusted to meet different construction needs.
It realizes the flexibility and operational convenience of concrete pouring equipment, reduces construction difficulty and labor intensity, and improves the applicability and efficiency of equipment.
Smart Images

Figure CN222632833U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of concrete pouring, and in particular relates to concrete pouring equipment for building construction. Background Art
[0002] Construction concrete pouring equipment refers to mechanical equipment used for mixing, transporting, pouring and processing concrete materials. It is mainly based on the characteristics of concrete materials and construction requirements. Through precise measurement and mixing, the accuracy of concrete proportion is ensured, and then the concrete is transported to the designated location through pumping pipelines to meet the needs of high-rise or long-distance construction. Through construction concrete pouring equipment, not only can concrete be produced in large quantities and quickly, the use of human resources can be reduced, and production efficiency can be improved, but also the concrete proportion can be more carefully controlled during the production process to ensure the accuracy of the concrete proportion, thereby producing high-quality concrete.
[0003] Chinese patent announcement number CN217652360U discloses a concrete pouring equipment for construction, including a base plate, a box body is provided above the base plate, legs are provided at the four corners of the bottom surface of the box body, a stirring shaft is provided in the box body, stirring rods are connected to both sides of the stirring shaft, a protective shell is provided on the top surface of the box body, a motor 1 is provided in the protective shell, a pulley 1 is sleeved on the output shaft of the motor 1, the utility model drives the pulley 1 to rotate through the motor 1, thereby driving the pulley 2 and the stirring shaft to rotate through the belt, thereby driving the stirring rod to rotate, and fully stirring the concrete, driving the spiral conveying rod to rotate through the motor 3, and evenly conveying the material, driving the screw rod to rotate through the motor 2, thereby driving the slider 1 to move up and down, thereby driving the connecting plate 1 and the cover to move, so that the box body can be opened conveniently and the interior can be cleaned, and the guide rod and the connecting plate 2 cooperate to make the cover move more stably.
[0004] In actual use, the utility model mainly relies on the pump body to efficiently transport concrete to the designated pouring point. However, the pouring pipe of the utility model is fixed, so that the concrete pouring equipment can only accurately transport concrete to a predetermined position. Once the pouring position needs to be changed, the entire construction concrete pouring equipment must be moved and adjusted, which not only increases the difficulty and complexity of construction, but also significantly reduces the flexibility and convenience of equipment use, making the applicability of the construction concrete pouring equipment lacking. Utility Model Content
[0005] The utility model provides a building construction concrete pouring device, which is proposed to solve the problem that it is inconvenient to adjust the pouring position of the building construction concrete pouring device in the prior art.
[0006] To achieve the above purpose, the utility model provides the following technical solution: a construction concrete pouring device, comprising:
[0007] Mounting base and multiple universal wheels;
[0008] A material storage barrel is arranged on one side of the upper end of the mounting base, and a discharge hose is arranged on one side of the bottom end of the material storage barrel;
[0009] A pouring pipe is rotatably connected to one side of the upper end of the mounting seat, one end of the discharge hose is connected to one end of the pouring pipe, and an extension pipe is sleeved on the outer side of the pouring pipe;
[0010] The discharge pipe is arranged at one end of the extension pipe. A limiting plate is arranged inside the discharge pipe. The limiting plate is penetrated by a plurality of discharge ports.
[0011] As a preferred embodiment, a pump body is provided at the upper end of the mounting seat, and the pump body is connected to a discharge hose.
[0012] As a preferred embodiment, a cylinder is provided on one side of the upper end of the mounting seat, and an output end of the cylinder is rotatably connected to one side of the bottom end of the casting pipe.
[0013] In order to pour concrete to different positions, a fixed plate is further provided at the upper end of the pouring tube, and an adjusting plate is provided at one end of the extension tube. A threaded rod is rotatably connected to one side of the fixed plate, and a threaded hole matching the threaded rod is penetrated through the adjusting plate. The threaded rod penetrates the threaded hole and is threadedly connected to the side wall of the threaded hole.
[0014] As a preferred implementation, a servo motor is provided on one side of the upper end of the casting pipe, and one end of the threaded rod passes through the fixing plate and is provided on the output end of the servo motor.
[0015] In order to adjust the flow rate of the casting equipment, a clamping groove is further provided on the inner wall of the discharge pipe on one side of the limiting plate, and a corresponding adjusting wheel is provided in the clamping groove. The adjusting wheel is rotatably connected to one side of the limiting plate, and the adjusting wheel is penetrated by a plurality of discharge ports that are compatible with the discharge ports.
[0016] As a preferred embodiment, a driving motor is provided on one side of the discharge pipe, and a driving wheel adapted to the adjusting wheel is provided at the output end of the driving motor. One end of the driving wheel passes through the side wall of the discharge pipe and extends into the clamping groove, and is meshed and connected with the adjusting wheel.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. The utility model can conveniently adjust the angle and length of the pouring pipe on the concrete pouring equipment by means of a cylinder arranged on one side of the bottom end of the pouring pipe, in cooperation with a threaded rod and an adjusting plate, so that concrete can be accurately poured to different positions, which not only reduces the difficulty and complexity of construction, reduces the labor intensity of construction, but also improves the flexibility and convenience of operation of the concrete pouring equipment, making the applicability of the concrete pouring equipment for construction better;
[0019] 2. The utility model, by setting a rotatable adjusting wheel in the discharge pipe, cooperates with multiple discharge ports and multiple discharge ports, and can rotate the adjusting wheel to make multiple discharge ports and multiple discharge ports achieve misalignment or alignment, thereby realizing precise adjustment of the flow rate of concrete pouring equipment, so that the concrete pouring equipment for construction can meet various pouring needs in different construction scenes, and ensures the flexibility of using the concrete pouring equipment for construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the main appearance of the structure of the utility model;
[0021] Figure 2 It is a partial appearance schematic diagram of the structure of the utility model;
[0022] Figure 3 It is a partial cross-sectional schematic diagram of the structure of the utility model;
[0023] Figure 4 It is a cross-sectional schematic diagram of the discharge pipe of the utility model structure.
[0024] In the figure: 1. Mounting seat; 2. Universal wheel; 3. Storage barrel; 4. Discharge hose; 5. Casting pipe; 6. Extension pipe; 7. Discharge pipe; 8. Limit plate; 9. Discharge port; 10. Pump body; 11. Cylinder; 12. Fixed plate; 13. Adjustment plate; 14. Threaded rod; 15. Servo motor; 16. Adjustment wheel; 17. Discharge port; 18. Drive motor; 19. Drive wheel. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0026] Embodiment 1:
[0027] See also Figure 1-4 The utility model provides a construction concrete pouring equipment, comprising:
[0028] A mounting base 1 and a plurality of universal wheels 2;
[0029] A material storage barrel 3 is arranged on one side of the upper end of the mounting base 1, and a discharge hose 4 is arranged on one side of the bottom end of the material storage barrel 3;
[0030] The pouring pipe 5 is rotatably connected to one side of the upper end of the mounting seat 1, one end of the discharge hose 4 is connected to one end of the pouring pipe 5, and an extension pipe 6 is sleeved on the outer side of the pouring pipe 5;
[0031] The discharge pipe 7 is arranged at one end of the extension pipe 6 . A limiting plate 8 is arranged inside the discharge pipe 7 . The limiting plate 8 is penetrated by a plurality of discharge ports 9 .
[0032] Specifically, Figure 1 As shown, a pump body 10 is provided at the upper end of the mounting base 1 . The pump body 10 is a prior art and will not be described in detail herein. The pump body 10 is connected to a discharge hose 4 . The pump body 10 can transport concrete to the casting pipe 5 through the discharge hose 4 .
[0033] Specifically, Figure 1 As shown, a cylinder 11 is provided on one side of the upper end of the mounting base 1. The cylinder 11 is a prior art and will not be described in detail here. The output end of the cylinder 11 is rotatably connected to one side of the bottom end of the pouring pipe 5. The cylinder 11 can adjust the angle of the pouring pipe 5 so that it can pour concrete to different positions.
[0034] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, a fixing plate 12 is provided at the upper end of the casting tube 5, an adjusting plate 13 is provided at one end of the extension tube 6, a threaded rod 14 is rotatably connected to one side of the fixing plate 12, a threaded hole matching the threaded rod 14 is penetrated through the adjusting plate 13, the threaded rod 14 penetrates the threaded hole and is threadedly connected to the side wall of the threaded hole.
[0035] Through its design, by rotating the threaded rod 14, the adjustment plate 13 and the extension tube 6 can be driven to move, and when the rotation stops, the position of the extension tube 6 can be locked, so that the length of the concrete pouring equipment can be adjusted so that it can be poured at different positions, ensuring the efficiency and convenience of construction.
[0036] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, a servo motor 15 is provided at one side of the upper end of the casting pipe 5 . The servo motor 15 is of prior art and will not be described in detail herein. One end of the threaded rod 14 passes through the fixing plate 12 and is provided at the output end of the servo motor 15 .
[0037] See also Figure 1-4When using the construction concrete pouring equipment, first, it is necessary to start the cylinder 11 according to the position to be poured. The output end of the cylinder 11 will drive the pouring pipe 5 to rotate, so that the angle of the pouring pipe 5 can be adjusted. Then start the servo motor 15. The output end of the servo motor 15 will drive the threaded rod 14 to rotate. The threaded rod 14 will drive the adjustment plate 13 and the extension pipe 6 to move, so that the length of the construction concrete pouring equipment can be adjusted. During pouring, it is necessary to start the pump body 10. The pump body 10 can transport the concrete in the storage barrel 3 to the pouring pipe 5 and the extension pipe 6 through the discharge hose 4, and then the concrete can be discharged through the discharge pipe 7, so that the concrete can be poured to different positions, making the applicability of the construction concrete pouring equipment better.
[0038] Embodiment 2:
[0039] See also Figure 1-4 The utility model provides a construction concrete pouring equipment, comprising:
[0040] A mounting base 1 and a plurality of universal wheels 2;
[0041] A material storage barrel 3 is arranged on one side of the upper end of the mounting base 1, and a discharge hose 4 is arranged on one side of the bottom end of the material storage barrel 3;
[0042] The pouring pipe 5 is rotatably connected to one side of the upper end of the mounting seat 1, one end of the discharge hose 4 is connected to one end of the pouring pipe 5, and an extension pipe 6 is sleeved on the outer side of the pouring pipe 5;
[0043] The discharge pipe 7 is arranged at one end of the extension pipe 6 . A limiting plate 8 is arranged inside the discharge pipe 7 . The limiting plate 8 is penetrated by a plurality of discharge ports 9 .
[0044] Specifically, Figure 3 and Figure 4 As shown, a clamping groove is provided on the inner wall of the discharge pipe 7 located on one side of the limiting plate 8, and a matching adjusting wheel 16 is provided in the clamping groove. The adjusting wheel 16 is rotatably connected to one side of the limiting plate 8, and the adjusting wheel 16 is penetrated by a plurality of discharge ports 17 matched with the discharge port 9.
[0045] Through its design, by rotating the adjusting wheel 16, multiple discharge ports 17 can be driven so that the multiple discharge ports 17 can be offset or aligned with the multiple discharge ports 9, thereby adjusting the flow rate of the construction concrete pouring equipment to meet different pouring needs.
[0046] Specifically, Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, a driving motor 18 is provided on one side of the discharge pipe 7. The driving motor 18 is a prior art and will not be described in detail here. The output end of the driving motor 18 is provided with a driving wheel 19 adapted to the adjusting wheel 16. One end of the driving wheel 19 extends through the side wall of the discharge pipe 7 to the clamping groove and is meshed with the adjusting wheel 16. When the output end of the driving motor 18 drives the driving wheel 19 to rotate, the adjusting wheel 16 can be driven to rotate.
[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A concrete pouring equipment for building construction, characterized in that: include: A mounting seat (1) and a plurality of universal wheels (2); A material storage barrel (3) is arranged on one side of the upper end of the mounting base (1), and a discharge hose (4) is provided on one side of the bottom end of the material storage barrel (3); A pouring pipe (5) is rotatably connected to one side of the upper end of the mounting seat (1), one end of the discharge hose (4) is connected to one end of the pouring pipe (5), and an extension pipe (6) is sleeved on the outer side of the pouring pipe (5); A discharge pipe (7) is arranged at one end of the extension pipe (6), a limiting plate (8) is arranged inside the discharge pipe (7), and a plurality of discharge ports (9) are penetrated through the limiting plate (8).
2. A construction concrete pouring equipment according to claim 1, characterized in that: A pump body (10) is provided at the upper end of the mounting seat (1), and the pump body (10) is connected to a discharge hose (4).
3. A construction concrete pouring equipment according to claim 1, characterized in that: A cylinder (11) is provided on one side of the upper end of the mounting seat (1), and an output end of the cylinder (11) is rotatably connected to one side of the bottom end of the pouring pipe (5).
4. The concrete pouring equipment for construction according to claim 1, characterized in that: A fixing plate (12) is provided at the upper end of the casting pipe (5), and an adjusting plate (13) is provided at one end of the extension pipe (6). A threaded rod (14) is rotatably connected to one side of the fixing plate (12). A threaded hole matching the threaded rod (14) is passed through the adjusting plate (13). The threaded rod (14) passes through the threaded hole and is threadedly connected to the side wall of the threaded hole.
5. A construction concrete pouring equipment according to claim 4, characterized in that: A servo motor (15) is provided on one side of the upper end of the pouring pipe (5); one end of the threaded rod (14) penetrates the fixing plate (12) and is arranged on the output end of the servo motor (15).
6. The concrete pouring equipment for construction according to claim 1, characterized in that: A clamping groove is provided on the inner wall of the discharge pipe (7) on one side of the limiting plate (8), and a matching adjusting wheel (16) is provided in the clamping groove. The adjusting wheel (16) is rotatably connected to one side of the limiting plate (8), and the adjusting wheel (16) is penetrated by a plurality of discharge ports (17) that are matched with the discharge port (9).
7. The concrete pouring equipment for construction according to claim 6, characterized in that: A driving motor (18) is provided on one side of the discharge pipe (7), and a driving wheel (19) adapted to the adjusting wheel (16) is provided at the output end of the driving motor (18). One end of the driving wheel (19) penetrates the side wall of the discharge pipe (7) and extends into the clamping groove, and is meshedly connected with the adjusting wheel (16).
Citation Information
Patent Citations
Concrete pouring equipment for building construction
CN217652360U